John Taylor ICAO Preparatory Spectrum Seminar for WRC-15 Thailand March 11-12, 2014 WRC-15 Agenda Item 1.7 1.

Slides:



Advertisements
Similar presentations
By Andy Knill Head of Surveillance and Spectrum Management UK Civil Aviation Authority.
Advertisements

Cairo Sept 2010 Preparations for WRC-12 WRC -12 AGENDA ITEM 1.3 ON UAS Presented by John Taylor MID RPS for WRC-12 preparation.
Nairobi, Kenya September 2007 Preparations for WRC-07 Proposals from the Asia-Pacific Telecommunity (APT) Presented by Robert Witzen Technical Officer,
Nairobi, Kenya September 2007 Preparations for WRC-07 Proposals from CITEL Presented by John Taylor Regional Seminar on radio-frequency spectrum.
ITU-R Working Party 8D Status Update Inte rnational Civil Aviation Organization Regional Preparatory Group (RPG) Meeting for World Radiocommunication Conference.
WRC–12 Industry Debrief 23 April 2012 Agenda item Agenda item 1.2 – Enhancing the international spectrum regulatory framework Presenter: Jason Ashurst.
WRC–12 Industry Debrief 23 April 2012 Agenda item 1.10 – Allocation requirements of safety systems of ships and ports Presenter: Peter Pokorny.
ICTS REGION II REPORT (Minus the USA, see Session Items 5 & 6) By the Region II (the Americas) Coordinator: Mr. Mikel R. Ryan Patuxent River MD, United.
John Taylor Nairobi, Kenya Sept 3-4, 2013 WRC-15 Agenda Item
WRC 2007 Results October 22 ~ November 16, 2007 Geneva, Switzerland Masatoshi OHISHI RAFCAP meeting 2008.
WRC-15 Agenda Item 1.3 Broadband Public Protection & Disaster Relief (PPDR) XXV MEETING OF CITEL PCC.II February 23-27, 2015 Medellin, Colombia - For Information.
AGENDA ITEM 1.1 To consider additional spectrum allocations to the mobile service on a primary basis and identification of additional frequency bands for.
ASIA PACIFIC TELECOMMUNITY APT PRELIMINARY VIEWS ON WRC-12 AGENDA ITEMS FIRST REGIONAL PREPARATORY GROUP (RPG) MEETING FOR WRC-2012, BANGKOK, 8-9 DECEMBER.
WMO Workshop on Radio Frequencies for Meteorology Meteorological Satellite Services David F. McGinnis U.S. Dept. of Commerce, NOAA 7 October 2002 Geneva,
2012 World Radiocommunication Conference: A Retrospective.
WRC–12 Industry Debrief 23 April 2012 Agenda item 1.17 Presenter: Neil Meaney.
WRC–12 Industry Debrief 23 April 2012 Agenda item 1.4 – New AM(R)S in the bands 112– , 960–1 164 and 5 000– MHz Presenter: Eddy D’Amico.
Providing Useful Regulatory Solutions T T & C Telecommunication Regulatory Consultants Shayla E. Taylor TT&C USITUA WRC Seminar September 19, 2007.
Nairobi, Kenya September 2007 Preparations for WRC-07 Overview of Regional and National proposals as of 13 September 2007 Presented by Robert Witzen.
CEPT preparations status for WRC-15 Mr. Per Christensen (ECO Director) August 2015 The second Annual Middle East & North Africa Spectrum Management Conference,
CEPT positions for WRC-15 Mr. Alexander Kühn CPG-15 Chairman October 2015.
The Telemetry Agenda Item: Outcome of ITU-R WP 8B San Diego, CA October 25, 2006 Ken Keane Duane Morris, LLP 1667 K Street, NW Washington, DC
WRC–12 Industry Debrief 23 April 2012 Agenda item 8.2 – Future WRC Agendas.
Role of World Radiocommunications Conference and European preparations for WRC Stella Lyubchenko 4 th CEPT Workshop on European Spectrum Management and.
Agenda item 1.5 Use of the Fixed Satellite Service by Unmanned Aircraft Systems.
Arab Spectrum Management Group & Agenda Items of the WRC-15 As of 19 th Meeting, Doha, Qatar: 15 – 19 February 2015.
International Telecommunication Union Document WRC-15-IRWSP-15/16-E 1 September 2015 English only 3 rd ITU INTER-REGIONAL WORKSHOP ON WRC-15 PREPARATION.
National Preparatory Working Group meeting for World Radio-communications Conference 2015 Aeronautical Agenda Item 1.7 Presented by Takalani Tshikalaha.
Agenda item Allocation to the Fixed- Satellite Service in the 7 ‑ 8 GHz range Presenter: Carol Wilson (Coordinator: Kevin Knights)
Agenda item 9.2 On any difficulties or inconsistencies encountered in the application of the Radio Regulations (non-ESOMPS)
Agenda item 1.16 VHF data exchange system (VDES).
Agenda Item: 1.8 Title: to review the provisions relating to earth stations located on board vessels (ESVs), based on studies conducted in accordance with.
CRAF POSITION ON WRC-19 AGENDA ITEMS RELEVANT TO RADIO ASTRONOMY Talayeh Hezareh - CRAF FM Max Planck Institute for Radio astronomy Bonn, Germany MAY 20,
International Telecommunication Union Document WRC-15-IRWSP-15/14-E 1 September 2015 English only 3 rd ITU INTER-REGIONAL WORKSHOP ON WRC-15 PREPARATION.
Agenda item 1.17 – Spectrum and regulatory requirements for WAIC.
CEPT position on WRC-12 AI’s 1.3, 1.4, 1.7, 1.12 and 1.25
CEPT Conference Preparatory Group
Preparations for WRC-12 WRC -12 AGENDA ITEM 1.3 ON UAS
ICAO Position for ITU WRC-15
broadband applications, in accordance with Resolution 233 (WRC-12)
Cindy Cook Chairman, TG 5/1 November 2, 2016
PROPOSED AMENDMENT TO THE DRAFT ICAO POSITION FOR THE INTERNATIONAL TELECOMMUNICATION UNION (ITU) WORLD RADIOCOMMUNICATION CONFERENCE 2015 (WRC-15) APAC.
Panel Session 2 WRC-15 Agenda items 1.16, 1.4, 1.15
ROAD MAP TO RA AND WRC-07 RA & WRC-07.
ICAO Position for ITU WRC-15
Regional Preparation for WRC-07
WRC-07 Agenda item 1.5 “to consider spectrum requirements and possible additional spectrum allocations for aeronautical telecommand and high bit-rate aeronautical.
PRELIMINARY POSITION OF THE RCC CAs ON THE AGENDA ITEMS OF THE WORLD RADIOCOMMUNICATION CONFERENCE 2012.
Panel Session 3 WRC-15 Agenda item 1.1
Regional Preparation for WRC-07
Panel Session 4 WRC-15 Agenda items 1. 2 and 1. 3 (incl
SADC WRC-15 Preparatory Meeting
WRC-15 Agenda Item 1.7 John Taylor ICAO Preparatory Spectrum Seminar for WRC-15 Thailand March 11-12, 2014.
WRC-12 A.I. 1.7 Eric ALLAIX DGAC-DSNA.
WRC-12 A.I. 1.3 Eric ALLAIX DGAC-DSNA.
5G and IMT Identification - Views from CEPT-
John Taylor ICAO Spectrum Workshop for WRC-15 CAIRO Feb 16-17, 2015
Panel Session 5 WRC-15 Agenda items 1.6, 1.8, and 1.7
Draft ICAO Position for ITU WRC-19
SADC WRC-15 Preparatory Meeting
SADC WRC-15 Preparatory Meeting
Draft ICAO Position for ITU WRC-15
World Radiocommunications Conference
John Taylor Nairobi, Kenya Sept 3-4, 2013
Possible Future Agenda Items
Agenda Item Overview & draft India proposal
Draft ICAO Position for ITU WRC-15
GSC position on key WRC-19 AI 1.5 ESIMs
Preliminary GSC positions on WRC-19 agenda items 1.13 IMT
Presentation transcript:

John Taylor ICAO Preparatory Spectrum Seminar for WRC-15 Thailand March 11-12, 2014 WRC-15 Agenda Item 1.7 1

 WRC-12 Resolution 114  Review of ARNS and FSS use of band MHz  Footnote 5.444A time limitations on FSS feeder links  ICAO Position  Development of draft CPM Text  Review of Regional positions  Expected outcome Overview 2

 Resolution 114 (WRC-12) calls for Studies on compatibility between new systems of the aeronautical radionavigation service and the fixed-satellite service (Earth-to-space) (limited to feeder links of the non-geostationary mobile-satellite systems in the mobile-satellite service) in the frequency band MHz WRC-12 Resolution 114 3

 Resolves 2 states; that the allocation to the aeronautical radionavigation service and the FSS in the frequency band MHz should be reviewed at a future competent conference prior to 2018 This also relates to the two date constraints in 5.444A that place limitations on the FSS. ie; - after 1 January 2016, no new assignments shall be made to earth stations providing feeder links of non-geostationary mobile-satellite systems; – after 1 January 2018, the fixed-satellite service will become secondary to the aeronautical radionavigation service. (WRC-07) Resolves 3 states; that studies be undertaken on compatibility between new systems of the aeronautical radionavigation service and systems of the FSS providing feeder links of the non-GSO systems in the MSS (Earth-to-space), in the band MHz Reason for Resolution 114 4

The ICAO position recognises the benefits of retaining the FSS feeder links as a co-primary sharing service with ARNS in the MHz band, also gaining flexibility to implement AMRS systems (surface applications) while not exceeding the permitted aggregate interference apportionment into the FSS satellite receivers. Support the removal of date limitations on the fixed satellite service (FSS) allocation in the frequency band 5091 – 5150 MHz subject to: - the retention of the aeronautical protections contained in Resolution 114 (WRC-12). - improving the flexibility for managing the allowed FSS satellite noise temperature increase by the aeronautical mobile (R) and aeronautical radionavigation services operating in the band MHz. ICAO POSITION 5

Development of Draft CPM Text Method A Draft CPM text and a Method have been developed in ITU-R WP 4A Supports suppression of the date limitations to the FSS feeder links in 5.444A and retention of Res 114 Proposes modification of 5.444A to state that such use shall be in accordance with Resolution 114 Also proposes consequential changes to ITU-R M 1827 and Res 748. (changes will also be made to Res 114 at WRC-15) Proposes that the allocation to FSS be moved from the footnote to the Table of Allocations Proposes that Appendix 7 of the RR’s be used in cases when coordination may be required between FSS and ARNS Permits the desired flexibility for implementing AMRS while not exceeding the 6% ΔT s /T s in the absence of ARNS No other Methods have been proposed 6

Review of Regional Positions CITEL: Upcoming PCC II meeting in Mar will have a Preliminary Proposal Supporting Method A CEPT: common position supports Method A with further consequential revision of Res 114 APT: preliminary view support studies of the ITU-R on compatibility between ARNS and FSS feeder links in the frequency band ‑ MHz with a view to consider, if appropriate, the removal of the date limitations on the FSS. ATU: common view is no objection to the principle of Method A ICAO Position supports Method A There is general consensus amongst the Regional organisations that Method A achieves the desired long term stable operating environment for ARNS and FSS while also providing flexibility for future deployment of AMRS surface applications 7

Expected Outcome Retention of Res 114, with consequential changes to bring it up to date, and referenced in the modifications to 5.444A Removal of the date limitations in 5.444A on the FSS feeder links Flexibility for implementing future AMRS surface applications while not exceeding the allowable ΔT s /T s Allocation to the FSS moved from footnote to the table of allocations. Reference in 5.444A that Appendix 7 is the appropriate mechanism when coordination is required. End goal and expectation is the creation of a long term stable operating environment for co- primary services in the band MHz, ie; ARNS, AMRS, AMS and FSS 8