Tracy Rolstad TSS Chair TSS Chair Report July 2014 Salt Lake City, UT 1.

Slides:



Advertisements
Similar presentations
PCC Update Presentation to TEPPC June 2010 Dana Cabbell PCC Chair.
Advertisements

TRDTF Transmission Reliability Database Task Force Update & Approval Vote Brian Keel SRP
Sequence Data, Power Flow & Transient Stability (PF & TS) MSRATF - July 10, 2013 Joe Seabrook.
WESTERN ELECTRICITY COORDINATING COUNCIL OPERATIONS COMMITTEE June 18, 2009 Salt Lake City, UT Base Case Coordination System (BCCS) Request For Information.
Base Case Coordination System RFP David Franklin BCCS System Review Group/Planning Tool Subcommittee (PTS) Pre-Bid Conference Salt Lake City, Utah.
1 TSS Report PCC Meeting Salt Lake City, UT October 26-27, 2006.
Model Specification Requirements MSRATF Meeting – Mar 11, 2013 Stephanie Lu, MVWG Chair Seattle City Light.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
Robert E. Kondziolka Salt Lake City, Utah May 6-7, 2007 WECC JGC Leadership Training Expectations of WECC Leadership.
Report of the Planning Coordination Committee WECC Board Meeting San Diego, CA April, 2009.
Joe Seabrook Puget Sound Energy, Inc.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) May 15, 2013 Joe Seabrook Puget Sound Energy.
Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee March 4, 2010 Brian Theaker BESDTF Chair.
WECC Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June, 2010 WECC Reliability Subcommittee Report.
Brett Wangen, Director of Engineering WECC RC Update to PCC Planning Coordination Committee Meeting October 24, 2013.
Marv Landauer Report to TSS on Annual Study Program Report Review Task Force April 2012 TSS Meeting Salt Lake City.
SRWG Activity Report (as presented) March 21-23, 2012 TSS Meeting #160 WECC Offices Salt Lake City, Utah Mark Graham, SRWG Chair/David Franklin TSS.
Presented to PGDTF February 11, 2015
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Activities August, 2014 Joe Seabrook Puget Sound Energy, Inc.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Activities May, 2014 Joe Seabrook Puget Sound Energy, Inc.
State of Standards and Standards in Development Sean Cavote, Manager of Standards Development WECC Operating Committee Meeting March 26, 2015.
SRWG Chair Report March 2015 WECC HQ
SRWG Update to TSS February 2015, Meeting 168 WECC HQ
Eleanor Ewry SRWG Study Program Subgroup Chair Annual Study Program Subgroup Update March 2015 WECC HQ.
Tracy Rolstad TSS Chair TSS Chair Report October 2014 Salt Lake City, UT 1.
Topics to Cover Interconnection Process Overview
Branden Sudduth Director, Reliability Assessment and Performance Analysis Planning Coordinator Gap Update March 25, 2014 PCC Meeting – Salt Lake City.
1 TSP Nodal Engagement Market Participant Call ERCOT August 04, 2010.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
Andy Meyers OC Update ISAS April 2014 Salt Lake City, UT.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
TEXAS NODAL Board of Directors Austin, Texas July 15, 2003.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
Tracy Rolstad TSS Chair TSS Chair Report March 2014 Salt Lake City, UT 1.
WECC 2013 TPL Coordination Analysis Report PCC Response Brian Keel.
George Zhou, VGITF Chair October 14, 2015 Salt Lake City, Utah Variable Generation Interconnection Task Force Update to PCC.
System Review Work Group Update John Gross, SRWG Chair Presented to TSS Jan. 22, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com MOD GENERATOR TESTING REQUIREMENTS RESOURCE PLANNERS LeeAnne Uhler, Regulatory.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
TEPPC Review Task Force January 11, Purpose Advise and make recommendations on Future potential future generation and load balance Adequacy of the.
System Review Work Group Update to TSS John Gross, SRWG Chair Presented to TSS May 17, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Reliability Standard TPL Transmission System Planned Performance for Geomagnetic Disturbance Events September 28, 2016 TPL Standard Status.
WECC – NERC Standards Update
Western Electricity Coordinating Council
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
Western Electricity Coordinating Council Renewable Energy Modeling Task Force REMTF Report to MVWG Abraham Ellis, Sandia March 18, 2015 Salt Lake.
Philip Augustin TSS Chair
Path Operator Implementation Task Force
Eleanor Ewry Base Case Coordination Subgroup Chair
Phil O’Donnell, Manager Operations and Planning Audits
Merrill Brimhall – Engineer, Staff
Jonathan young ColumbiaGrid
Planning Coordinator Gap Update March 25, 2014
Joe Seabrook Puget Sound Energy, Inc.
Jonathan Young SDWG Chair
Western Electricity Coordinating Council Renewable Energy Modeling Task Force REMTF Report to MVWG Abraham Ellis, Sandia March 18, 2015 Salt Lake.
Andrew Christensen, SRWG Chair
Phil O’Donnell, Manager Operations and Planning Audits
SRWG Chair Report March 2015 WECC HQ
Donald Davies Chief Senior Engineer
Tracy Rolstad TSS Chair
WECC – NERC Standards Update
Andrew Christensen, SRWG Chair
System Review Work Group Update to TSS
System Review Work Group Update to TSS
Generator Operator Work Group (GOWG)
The Survival Plan.
Joe Seabrook Puget Sound Energy, Inc.
Jonathan Young ColumbiaGrid
Presentation transcript:

Tracy Rolstad TSS Chair TSS Chair Report July 2014 Salt Lake City, UT 1

Overview Approval Items – 2015 Base Case Schedule TSS Activities – Includes MSRATF activities JUG MVWG Activities SRWG Activities – 2015 Base Case Schedule – DPM Changes (consider up or down vote in future) July 20142

TSS ACTIVITIES CIP , MOD-032-1, TPL , TPL-007 Response to 08 Sept 2011 AZ to CA Outage – Relays, DPM Changes, WECC RAS/Ctg Definition BCCS – Base Cases created by BCCS in – Training provided in 2013 and available in 2014 Certification/de-certification Process of Study Software – Following MSRATF software requirement development…will assign to JUG July 20143

TSS: Projects Coordination Mostly quiet July 20144

TSS: Response to AZ to CA Outage Sharing of Contingencies and RAS files – Began in 2013, TSS to ask for this again this fall WECC RAS/Contingency Format/File – Proposal to have vendor assist WECC in creating this for 2015 base cases (start in 2014) – Outcome would be a WECC wide RAS/Ctg file that functioned for each WECC published base case. July 20145

TSS: Joint Users Group To assume all MSRATF duties fall of 2014 – Intend on disestablishing MSRATF Jan 2015 – JUG should be the open and transparent forum for allocating WECC funds for study software development New or changing standards require JUG be PROACTIVE – Work within TSS framework to meet requirements of standards July 20146

SRWG ACTIVITIES 2014 Base Cases – Attempted to develop jointly with BCCS and without BCCS work in progress (2015 success date?) Data Preparation Manual – Rant Ahead: Propose to ask for straight up and down vote on DPM. Edits are destroying the timeliness. MOD (Short circuit discussion) July 20147

SRWG Logs Rep Log – Shows steady improvement until we reset it with new data checks This is an on going trend Recall that “Performance Log” has gone away – Morphed into a listing of study results listed in Annual Study Program report. July 20148

SRWG: 2015 Base Case Schedule Operating base cases Heavy Winter Light Winter 2016 Heavy Spring 2016 Heavy Summer 2016 Light Summer July Five year base cases 2021 Heavy Summer Heavy Winter Ten year base cases Heavy Winter 2026 Heavy Summer

July

SRWG: Short Circuit Data MOD-032 asks for short circuit data – Voted at TSS and passed for DPM changes Members supply short circuit data that is consistent with steady state data Waiting for SRWG proposed DPM changes on this Much debate at TSS meeting and subsequent to it – Some desire for re-voting – MOD requires changes in data submission practices DPM agility needed! July

July MOD : R1. Each Planning Coordinator and each of its Transmission Planners shall jointly develop steady-state, dynamics, and short circuit modeling data requirements and reporting procedures for the Planning Coordinator’s planning area that include: 1.1. The data listed in Attachment Specifications of the following items consistent with procedures for building the Interconnection-wide case(s): Data format; Level of detail to which equipment shall be modeled; Case types or scenarios to be modeled; and A schedule for submission of data at least once every 13 calendar months Specifications for distribution or posting of the data requirements and reporting procedures so that they are available to those entities responsible for providing the data. MOD : R4. Each Planning Coordinator shall make available models for its planning area reflecting data provided to it under Requirement R2 to the Electric Reliability Organization (ERO) or its designee to support creation of the Interconnection-wide case(s) that includes the Planning Coordinator’s planning area

July

July

SRWG: Nuances of MOD Nuances – “…steady-state, dynamics, and short circuit modeling data requirements...” – “…for building the Interconnection-wide case(s)…” – “Data must be shareable on an interconnection- wide basis to support use in the Interconnection- wide cases.” Practically speaking this suggests WECC map short circuit data to power flow cases to some extent. July

SRWG: Data Preparation Manual WECC can not continue its present DPM approval practices – TSS (SRWG) is asking for up or down vote No more editing of SRWG’s work unless grossly incorrect – Edits happen at TSS and PCC, then back to SRWG for changes…it takes MONTHS to do this! Everyone here has representation on SRWG – Are you communicating to them? – Do you have the right person there? – Does your SRWG understand your company’s position? July

MVWG ACTIVITIES – Continued work on Composite Load Model Open Question: Are we there yet? – Updates to the Approved Dynamics Model List 2 generation wind, 1 st generation PV – Approved WECC Modeling Guidelines for PV and Wind – White Paper on Transient Voltage Performance Kosterev and Undrill July

TSS Report Summary 2014/2015: – BCCS – Composite Load Model, phase 1 – Relays, Ctg & RAS Definition – Short Circuit Data submission to WECC – MSRATF disestablishment in 2014 DPM Up or Down Vote PLEASE! – Agility in responding faster to external forces FERC/NERC, etc Physical Security and GIC Data and Study Needs – TSS Guidance on CIP-014 in progress July

Questions/Suggestions/Comments July