BLM update procedure: - Updated the RT software - Updated the BLETC firmware (ver. 20110221_A) - Changed the firware version in the MASTER tables and generated.

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

LHC progress Thursday 30 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Day ● 09:00-14:00: Collimation setup 3.5 TeV – Slowed down by losses induced by tune hump. – 48 collimators set up. – Beam dumped by ATLAS during.
Sat/Sun 26/27 th March Sat 18h20: Stable beams. Fill #1653. Sun 10h02: Stable beams continued. vdM scans. Length calibrations. 16h59: Beam dump. Delivered.
LHC 30 th and 31 st July :10 Finish scrubbing fill 25 ns trains by operator dump. –No XPOC data … 08:40 Inject for another scrubbing fill 09:09.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
Saturday 6:13 – 15:00 STABLE BEAMS  scans etc. 15:00 moved to ADJUST Squeeze to 2 m in two steps 11 – 5 – 2  remarkably smooth  tertiary collimators.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Friday to Saturday 02:00: Machine closed. 09:00: Cryogenics all OK. Preparing pre-cycle. 10:00: Pre-cycle started. 11:30: Pre-cycle finished. 14:00: Beam.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
LHC progress Report LHCC Wednesday 23 rd March 2011.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
Shortened program (2 days), as decided in LMC. MD program worked very well  all MD’s on plan with ~foreseen beam time. LHC in very good shape with excellent.
Improving Collimator Setup Efficiency LHC Beam Operation Committee, G. Valentino, R.W. Assmann, R. Bruce, F. Burkart, M. Cauchi, D. Deboy, S.
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
Injection status W. Bartmann, C. Bracco, B. Goddard, V. Kain, A. Macpherson, M. Meddahi, S. Redaelli, J. Uythoven, J. Wenninger LIBD Meeting, 20 th Sept.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
Ion Commissioning: Thursday & Friday
Wednesday
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
MD Planning Fri – Sat (26. – 27.8.)
Wednesday 8.9 External crossing angles:
1st LHC MD Period Started
Saturday 24 March 2012.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
Thursday morning – optics correction
Machine availability reaching well over 80%
Monday – recovery from MKI flashover
LHC commissioning Week 38
LHC Injection and Dump Protection
Lost at 12:05 to power converter (RTQX2.R1) problem
Wed :40 Lost S78 - QPS controller.
Saturday 2/4/ :00-09:00 Problems with SPS:
Week 35 – Technical Stop and Restart
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Monday February 28th 8h00: Injection
Friday morning 10:30 Optics measurements and corrections.
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Yesterday morning Held 1647 for a while – SPS kicker problem
Saturday 7th May Sat – Sun night
Summary Thursday h21: Stable beams fill #1303.
Aims for the week Recover from technical stop and precycle at 10A/s
Monday 24 October hours of 25ns MD
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Wednesday 13th 9:30 Stable Beams… with 1 pilot and 2 nominals
Improving Collimator Setup Efficiency
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Summary for LPC (March 7th, Ralph Assmann)
Thursday 22nd March 00:20 – 02:40 on longer squeeze function, orbit and chroma correction at 4 TeV 2:40 – 5:30 second cycle with long squeeze 5:46 – 7:00.
LHC status - Week 35 G. Arduini, M. Lamont Main aims:
Wednesday 23/2 Thanks CRYO!!!.
Fri :52 Stable beams fill #2536
Thursday Aperture studies (foreseen until ~ midday, nothing done) Problems with single bunch B2 from SPS (extraction kicker not enabled) Setting.
Another Immortal Fill….
Tuesday
Daniel, Gianluca and Belen (for the Collimator team)
Presentation transcript:

BLM update procedure: - Updated the RT software - Updated the BLETC firmware (ver _A) - Changed the firware version in the MASTER tables and generated the LSA settings for both BLETC and BLECS modules. - driven to the electronics. Running the MCS check. BLM update Christos Zamantas, Stephen Jackson

All front-ends and processing modules have been updated to the new version. On the first set of tests, the collection and delivery of the BLM IQC data have been checked and several delays changed to adjust both the freeze of the buffers and the start of collection. Several injection events sent and verified the correctness together with the IQC developers. We mark this issue now as fixed. The second part was dedicated to establish that the MPS functionalities have remained unchanged. Two injections per beam was shot in the TCP collimators and the latency between measuring the loss and issuing a beam dump request match those expected. With the agreement of the CMS BCM coordinator (David Stickland) the operational crate cmsbrmppc2 has been also updated. Summary of BLM tests after update LMC

TDI MPS checks finished. Analysis ongoing. TCDI phase space coverage analysis finished. Protection OK. TI 2 data quality for 1 or 2 phases not good. If time available will check again a couple of phases. BPM P6 Interlock test  thresholds defined around BPM readings: done yesterday  for both beams one threshold was moved in steps of 0.5mm across the actual reading and a beam dump request was observed on the BIS monitor as expected  test OK Summary of injection Studies LMC

TDI grazing  both beams  used knob to simulate different MKI strength in sigma at TDI  scanned from 3 to 9 sigma (plus/minus) in steps of one sigma, one calibration shot of 12 sigma (deep into the TDI to have losses concentrated)  preliminary analysis: direct losses only at TDI and TCLI and collimation region (P3 and P7), shower downstream of TDI depending on grazing angle  otherwise losses in the arc are low --> protection from TDI is given  ALICE and LHCb BCMs triggered for >7 sigma  LHCb triggers also with installed sunglasses on the BCMs Summary of injection Studies LMC Chiara, Malika, Verena, Brennan, Wolfgang

B1:  emittance blow up in the SPS to 2/2.5 um  injected one nominal bunch on LHC4  checked reference trajectories for both beams, corrected B1 with the pilot  copied new reference for B1 and existing reference for B2 to LHC3 (and also LHC4 for B1)  injected four bunches on LHC4, no scraping in the SPS, trajectory and losses fine  injected bunch trains of 8 bunches with 75 ns spacing (LHC3) with scraping  extraction observed on OASIS OK  transfer line trajectory very good Multibunch Injection – beam 1 LMC

TL losses very good  Losses in injection region OK  but dumped beam because of wrong damper settings  one bunch train injection was without SPS scraping - high losses in the TL and injection region  after switching off the damper, the beam was not only cleanly injected but also stayed in B2 multibunch injection to be done Multibunch Injection – beam 1 LMC

We managed to reproduce today the fast BCT huge spikes. This occured while we were doing fast BCT capture at injection via the OP dedicated GUI. Please do not use this application until we fix the problem (most probably in our front end crates), at least on system A fast BCTs (you can select system B ones via the GUI). We also tuned the fast BCT summing algorithm and fast BCT should now behave correctly even with a mixture of pilot and nominal beams in the machine, i.e. we should not have the small positive jumps we observed lately). JJG Spikey FBCT LMC

17:15 Ramp started for collimator set-up LMC more nice loss spikes with tails... maybe skew halo has longer tails!? 40s beautiful decay for second example!

Completed setup of all collimators b1 and b2 Then took a while to set up TCDQ's. Lengthy due to various status handling issues (motors blocked in armed status without movement). In parallel checked three collimators with suspicious beam-based calibration values. Found angular misalignments of whole tank >1.9 mrad for all three cases (jaws niclecy parallel inside tank). Determined sign of angle. Requires inspection during next technical stop. Rechecked TCDQ after phone discussion with Brennan. Found ~1.1mm offset for b2 and ~0mm for b1. To be compared with 0.9mm in b2 and ~0.4mm in b1 from standard setup+calculation method (as used in 2010). In parallel generated functions for injection, ramp and 3.5TeV (flat top before squeeze) from BBA data found. Loaded functions and 3.5 TeV settings. To be updated tomorrow for linear scaling of TCT center with time during energy ramp (instead of linear scaling with energy). Collimation summary LMC R. Bruce, S. Redaelli, D. Deboy, G. Valentino, R. Assmann Loss maps for the grand finale! Looks quite good. On first sight no abnormality seen. To be analyzed in detail.

2:30 beams back in at 450 GeV Beating re-checked at 1.5 m Beta* k-modulation scans ongoing… Later this night LMC

Incoming… LMC