May 15, 2009 Regional Planning Group CREZ Implementation Study Update Warren Lasher Manager, System Assessment.

Slides:



Advertisements
Similar presentations
1 IETF 45 - IPP WG July 14, 1999 Agenda –Update on project status –Remaining work within the current charter IPP Notifications IPP Implementer's Guide.
Advertisements

Calista AVCP Regional Energy Plan. Preliminary Planning and Stakeholder Involvement Resource Inventory and Data Analysis Develop and Review Draft Energy.
RPG: September 24, Approach for ERCOT Independent Review of the 2013 Houston Import Project Jeff Billo, Manager, Transmission Planning September.
Jan 22, 2013 RPG Meeting Sharyland Atlas-Driver Load Integration Project – EIR update.
Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
Regional Planning Group Charter Revisions May 2008.
1 RTWG Tariff update to the BOD, MOPC, SPC, and RSC January 4, 2005.
ERCOT Update on PUCT Posting changes DEWG Meeting 11/27/07 Matt Mereness.
Decision Making Tools for Strategic Planning 2014 Nonprofit Capacity Conference Margo Bailey, PhD April 21, 2014 Clarify your strategic plan hierarchy.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting November 6, 2007.
NERC LTRA Update / CDR Capacity Counting Issues
South Corridor Light Rail Project Project Risk Assessment FTA Construction Roundtable May 2004 Presented by Frank Ward, RA/CSI Manager of Construction.
NH GFOA Annual Conference 5/7/ This presentation is intended for informational purposes only, and is not a substitute for seeking professional.
October 12, 2007 ERCOT Regional Planning Group Meeting RPG-CREZ Task Force Status Report Warren Lasher System Assessment.
Aug 14, 2009 Regional Planning Group Proposed CREZ Project Modifications Warren Lasher Manager, System Assessment.
HUMAN SETTLEMENTS PORTFOLIO COMMITTEE MORTGAGE DEFAULT INSURANCE COMPANY (MDIC) UPDATE MARCH 2013.
Renewables and Transmission Task Force Report to WMS March 20, 2007.
Market Metrics Working Group 2006 Accomplishments 2007 Goals Chair – Bill Reily – TXU Electric Delivery Vice Chair – Kyle Patrick – Reliant Energy Kyle.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
WRAP Committee and Forum Updates WRAP Board Meeting Salt Lake City, UT October 15, 2003.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
1 RMS Task Force on Retail Market Customer/ESI Transition October 16, 2003.
Presentation to the Chesapeake Bay and Water Resources Policy Committee July 30, 2010.
United Nations Statistics Division Registry of national Classifications.
NPRR514, Seasonal Generation Resource Wholesale Market Subcommittee April 12, 2013 Amanda Frazier.
ENL1819T Progress Report Confidence in Our Success.
SITE STATUS UPDATE TOP STOP PETROLEUM RELEASE SITE GUNNISION, UTAH Morgan Atkinson – Division of Environmental Response and Remediation, Project Manager.
Implementation Strategy July 2002 STANDARDS DEVELOPMENT LIFECYCLE PROCESS ORP Publishes & Maintains 8 Standing Committee Recommends Approval / Disapproval.
Introducing Project Management Update December 2011.
Sacramento Area Council of Governments ITS Partnership Meeting February 2, 2005.
Standards Review Subcommittee Update August 17, 2010.
02/13/2009 RPG Wind Interconnection Survey Dan Woodfin Director, System Planning.
October 9, 2012 Commercial Operations Subcommittee RMS Update Kathy Scott RMS Vice Chair.
Page 1 of 13 Texas Regional Entity ROS Presentation April 16, 2009 T EXAS RE ROS P RESENTATION A PRIL 2009.
Tuesday, October 6, 2015 (following RMS) COPS-RMS-WORKSHOPShttp://
MCWG Update to WMS 11/13/2013. MCWG Update to WMS General Update - October 30 th Joint MCWG/CWG Meeting Review September 25 Meeting Minutes - Approved.
Market Metrics Working Group 2005 Accomplishments and 2006 Goals.
Structure and Integration of RTF Guidelines: Savings, Lifetimes and Cost/Benefit July 17, 2012 Regional Technical Forum Presented by: Michael Baker, SBW.
Revisions to original presentation are in "Red"1 Available Flow-gate Capacity Stakeholder Kickoff Meeting January 19, 2005.
NDSWG Report June 16, NDSWG Report Regular meeting held May 16 in Taylor Telemetry / State Estimator Update Naming Convention Electrical Bus Designation.
PMO Update to RMS Troy Anderson Program Management Office December 7, 2005.
Retail Market Update August 6, Load Profile Guides In accordance with section § (e) (3) and PUCT Project 25516, Load Profiling and Load Research.
Work Related to Senate Bill 2202 (effective January 1, 2001)
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
3/28/2008 RPG CREZ Meeting CREZ Transmission Optimization (CTO) Study And The Oscar Goes To… Warren Lasher Manager, System Assessment.
February 2, 2016 RMS Meeting 1. * Reasons: * Per the ERCOT Board Report dated 8/5/14 there were 6.6M Advanced Metering System (AMS) Electric Service Identifiers.
RMS Update to TAC November 1, RMS Activity Summary RMGRR057, Competitive Metering Working Group Name Change (VOTE) Update on RMS Working Group and.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
Tuesday, October 6, 2015 (following RMS) COPS-RMS-WORKSHOPShttp://
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee September 4, 2003.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
CREZ Related Generation Interconnection Studies July 2008 Jeff Billo RPG meeting
August 24, 2007 ERCOT Regional Planning Group Meeting CREZ Transmission Optimization Study Warren Lasher System Assessment.
December 14, 2007 RPG - CREZ Meeting CREZ Transmission Optimization Study: Update Warren Lasher ERCOT System Assessment.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting March 11, 2008.
1 Project Prioritization Review May 14, Approved Revision Requests “Not Started” – Planned to Start in Future Months Revision Request Target Start.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting December 3, 2007.
Technical Advisory Committee Presentation to the ERCOT Board of Directors May 20, 2009.
1 Summary of TAC Procedures May 5, Revision of TAC Procedures Project began in October 2004 to incorporate the Commercial Operations Subcommittee.
Transmission Advisory Group NCTPC Process Update Rich Wodyka September 7, 2006.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
NPRRs 705NPRR Provides Consistency for References to the End Date of the Generation Interconnection Process. In the Resource Interconnection Handbook,
A lens to ensure each student successfully completes their educational program in Prince Rupert with a sense of hope, purpose, and control.
Profiling Working Group September 26, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting September 26, 2003.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
RPG - 10/12/2007 Competitive Renewable Energy Zones (CREZ) Update Bill Bojorquez Vice President, System Planning.
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Status of the Planning Working Group’s (PWG) Efforts
NERC Reliability Standards Development Plan
NERC Reliability Standards Development Plan
Presentation transcript:

May 15, 2009 Regional Planning Group CREZ Implementation Study Update Warren Lasher Manager, System Assessment

2 Regional Planning GroupMay 15, 2009 Purpose : Default : Priority In the Final Order in Docket 35665, ERCOT was asked to file sequencing recommendations by May 29, 2009 for non-default and non-priority lines What is being sequenced at this point is the order of the CCN filings, but this will be based on the general order in which the lines should be completed

3 Regional Planning GroupMay 15, 2009 Overall Strategy for Sequencing Schedule projects so that construction is completed by end of 2013 consistent with PUCT Order CCNs for longest lines have to be near the top of the schedule Meet PUCT Staff request for CCN timing and frequency File CCN Applications for projects that connect to load centers first These projects are required in order to increase transfer capacity

4 Regional Planning GroupMay 15, 2009 Overall Strategy for Sequencing (II) Try to establish some level of connectivity to as many of the CREZ collection points as quickly as possible Complete the connection to the Odessa area quickly

5 Regional Planning GroupMay 15, 2009 Current Status of Sequencing Recommendations ERCOT developed a straw-man proposal based on the Joint Parties’ filing in docket Joint Parties’ plan was modified to reflect new start date and the goals stated above Comments were received from the TSPs and by PUCT staff Construction schedules were adjusted by TSPs that were awarded projects but who were not included in the Joint Parties ERCOT has submitted its third iteration to the TSPs and PUCT staff for review and comment

6 Regional Planning GroupMay 15, 2009 Finalize sequencing recommendations based on additional comments from TSPs and RPG Submit report to PUCT by May 29, 2009 Remaining Steps

7 Regional Planning GroupMay 15, 2009 The following slides represent the latest pass in an iterative process that has not yet been completed. Dates presented are based on estimated completion dates given the current iteration of the CCN filing sequence and are still being revised in discussions with the TSPs and PUCT staff. These dates are only general timeframes at this point Some projects may be combined in the CCN process Maps show quarterly progress - all lines brought into service in specified time period Latest Draft Proposal

8 Regional Planning GroupMay 15, 2009

9 Regional Planning GroupMay 15, 2009

10 Regional Planning GroupMay 15, 2009

11 Regional Planning GroupMay 15, 2009

12 Regional Planning GroupMay 15, 2009

13 Regional Planning GroupMay 15, 2009 Questions?