Goals of the ILC-Asia Meeting at Pohang Fumihiko Takasaki PAL, Feb. 17, 2006.

Slides:



Advertisements
Similar presentations
Discussion on EUROTeV and ILC Nick Walker (DESY) EUROTeV Kick-off Meeting DESY 1 November 2004.
Advertisements

Report from the GDE director Barry Barish Snowmass 14-Aug-05.
Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
6-Nov-06 FALC Resource Board Global Design Effort 1 Report from the GDE Barry Barish Caltech / GDE 6-Nov-06.
20-Nov-06 FALC - KEK Global Design Effort 1 GDE Report Barry Barish Caltech / GDE 20-Nov-06 RDR Design Freeze.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
13-Feb-06 RDR: Goals and Scope Barry Barish Fermilab RDR Meeting 13-Feb-06 ILC Design/Cost WBS.
6-7 April 06 MAC Review Global Design Effort 1 RDR Overview Organization, Schedule, Approach and Goals Barry Barish GDE Caltech.
GDE Meeting B Barish 16-Aug-05 The GDE – who, what and how? The BCD – what is it? Internal Organization toward BCD What do we want out of Snowmass? How.
5 May 06 SLAC SPC 1 ILC Global Activities GDE, FALC Barry Barish GDE Caltech.
1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 1 ILC Report Barry Barish Caltech / GDE 1-Dec-06 RDR Design Freeze.
20 April 06 P5 - SLAC Global Design Effort 1 ILC Update from the GDE Barry Barish GDE Caltech.
14-Dec-06 RDR Internal Cost Review Global Design Effort 1 GDE Internal Review ILC Reference Design Costing Barry Barish Caltech / GDE 14-Dec-06.
GDE Report to FALC Status and Plans Barry Barish FALC Fermilab 4-Nov-05 ILC Polarized Electron Source.
GDE: Progress Report Barry Barish ILCSC Report CERN 9-Feb-06.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
The RDR Report Odyssey Nan Phinney SLAC for N^3 team of editors.
22-May-06 FALC - Rome Global Design Effort 1 Report on Progress of the GDE Barry Barish GDE.
Report from GG5, Dec. 20, 2005 Report from ILC GG 5: Cost and Engineering (Updates since Snowmass) Wilhelm Bialowons, Peter Garbincius and Tetsuo Shidara.
6-7 April 06 MAC Review Global Design Effort 1 BCD Overview Process and Highlights Barry Barish GDE Caltech.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
GDE Report from Snowmass to a Baseline Barry Barish ILCSC Meeting Daegu, Korea 27-Aug-05.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
8 May 06 ILCSC Report Global Design Effort 1 GDE R&D Program RDR Status and Plans Barry Barish GDE Caltech.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
Date Event Global Design Effort 1 ILC Engineering Design Phase - Status & Plans Mike Harrison GDE/BNL.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
6-10 Nov. 06 ILCWS Valencia Global Design Effort 1 RDR Management Board Overview K. Yokoya KEK.
HEPResearchers Set-up JLCB and JLCC ~6 Cite Decision Design ILC Lab. Japan Policy Council Positive Reference from New Prime Minister.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
GDE Plans for Next Year Barry Barish GDE Meeting Frascati 8-Dec-05 Orsay Coupler.
WBS x.11 Conventional Facilities Americas Region ILC Fermilab ART Meeting1 Conventional Facilities and Siting Global Group Americas Region FY.
Brian Foster - Cosener's Forum May 06 1 The ILC - Status & Plans Introduction & latest developments The GDE The baseline design and R&D efforts The path.
Report from ILCSC Shin-ichi Kurokawa ILCSC Chair LCWS06 at IISc Bangalore March 9, 2006.
Report from ILCSC Shin-ichi Kurokawa KEK ILCSC Chair GDE meeting at Frascati December 7, 2005.
GDE: Status and Plans Barry Barish CERN FALC Resource Board 8- Feb-06.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
6-7 April 06 MAC Review Global Design Effort 1 RDR Management Accelerator Design Towards the RDR Nick Walker ILC-GDE.
February, INP PAN FCAL Workshop in Cracow W. Lohmann, DESY The BCD (Baseline Configuration Document) The next calendar dates Where we are with FCAL.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
DRWS07 KEK Global Design Effort ILC Damping Rings Mini-Workshop December, 2007 High Energy Accelerator Research Organization KEK,
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
ILC Global Design Effort Barry Barish GDE 9-March-06.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
1 May 06 LCFOA - SLAC Global Design Effort 1 ILC Global Design Effort Barry Barish GDE Caltech.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
Americas Regional Planning Exercises Tor Raubenheimer SLAC Beijing GDE Meeting February 4 th 2007.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
19july06 - Vancouver L.C. Workshop - DCB (PHG) Global Design Effort 1 Report from the Design & Cost Board Peter H. Garbincius* on behalf of: Wilhelm Bialowons*,
Global design effort Americas 1 FY08-09 ILC-Americas planning G. Dugan ILC-Americas Planning meeting SLAC Sept. 13, 2006.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
ILC Project Management Status
Report on plan to produce an Engineering Design Report
ILC-EDR Kick-off Meeting, Cryomodule and Cryogenics
Status and Plan of GDE Design Work (Including Road Map for RDR)
ILC Global Design Effort
Barry Barish GDE Caltech
Yasuhiro Okada, Executive Director, KEK
Presentation transcript:

Goals of the ILC-Asia Meeting at Pohang Fumihiko Takasaki PAL, Feb. 17, 2006

We thank our colleagues of PAL for making this meeting possible.

1. To have an understanding of the GDE activities and also to have a good prospect for the RDR and beyond. 2. To exchange idea for the R&D programs in Asian laboratories. Goals of the Meeting

Global Design Effort –The Mission of the GDE Produce a design for the ILC. Coordinate worldwide prioritized proposal driven R&D efforts. - B. Barish Dec. 9,05 -

The GDE Plan and Schedule Global Design EffortProject globally coordinated Baseline configuration Reference Design ILC R&D Program Technical Design FALC Siting International Mgmt expression of interest sample si t es regionial coord ICFA / ILCSC Funding Hosting - B. Barish Dec. 9,05 -

Baseline Parameters were chosen by the BCD. The GDE is now moving from the BCD into the RDR. By the RDR, we will have an ILC Design with costs so that we can show it to the funding Agencies.

Some Information on the GDE For refreshing our memory

Function of the Central Team and the Regional teams ILCSC – Daigu Sept 05 : B. Barish The Central Team is the focal point for the ILC design effort, holding the schedule, major milestones, and parameter list, and providing intellectual leadership under ICFA guidance. Regional Teams perform the R&D and design work of ILC systems in close coordination with the Central Team.

GDE Organization for Snowmass WG1 LET bdyn. WG2 Main Linac WG3a Sources WG3b DR WG4 BDS WG5 Cavity GG1 Parameters GG2 Instrumentation GG3 Operations & Reliability GG4 Cost & Engineering GG5 Conventional Facilities GG6 Physics Options Technical sub-system Working Groups Global Group Provide input - B. Barish Dec. 9,05 - Studies issues common across the WGs.

Executive Committee for Baseline Configuration –GDE Director Barish –Regional Directors Dugan – Americas Foster – Europe Takasaki – Asia –Accelerator Leaders Yokoya - Asia Raubenheimer - Americas Walker - Europe Responsible for decisions and documentation for the Baseline Configuration Document (BCD) Discuss issues by a Tele-conference once a week. GDE Structure and Organization GDE Executive Committee - B. Barish Dec. 9,05 -

Central team members : 49 → 60 Americas 21 Europe 23 Asia 16 They are core people to Design the ILC. GDE Organization

Norihito Ouchi Nobuhito Terunuma 16 GDE members from Asia

ICFA FALC Resource Board ILCSC GDE Directorate GDE Executive Committee GDE R & D Board GDE Change Control Board GDE Design Cost Board GDE RDR / R&D Organization - B. Barish Dec. 9,05 -

GDE Organizational Evolution for RDR Change Control Board (CCB) –The baseline design will be put under configuration control of the CCB. Design / Cost Board (DCB) –The DCB will coordinate the reference design effort, including costing, etc: Check the consistency of the overall design. R&D Board (RDB) –The RDB will evaluate, prioritize and coordinate the R&D program with a single chair - B. Barish Dec. 9,05 -

ICFA FALC Resource Board ILCSC GDE Directorate GDE Executive Committee Global R&D Program RDR Design Matrix GDE R & D Board GDE Change Control Board GDE Design Cost Board GDE RDR / R&D Organization ILC Design Effort ILC R&D Program - B. Barish Dec. 9,05 -

R&D Budget (FY 05/06) Region Americas Asia Europe FTE M&S 9.2 (M$) 9.9 (O-Y) 14.2(MEu) Total (M$) 32.9 (M$) 9.9 (O-Y) 31.1(MEu)

Area Systems Damping Main Technical Systems e- source e+ source Rings RTML Linac BDS Vacuum systems Magnet systems Cryomodule Cavity Package RF Power Instrumentation Dumps and Collimators Accelerator Physics Global Systems Commissioning, Operations & Reliability Control System Cryogenics CF&S Installation

Area Systems e- sourcee+ source Damping RingsRTML Main LinacBDS KurikiGao E.S. Kim Hayano Yamamoto (MDI Ch) ???Guiducci PT Lilje Angal- Kalinin BrachmannSheppardWolski Adolphsen Solyak Seryi - B. Barish Dec. 9,05 - Updated list: K. Yokoya

Technical Systems Vacuum systemsSuetsuguMichelatoNoonan Magnet systemsSugaharaBINP ??Thompkins CryomoduleOhuchiPaganiCarter Cavity PackageSaitoProchPadamsee RF PowerFukudaSaclay ??Larsen InstrumentationUrakawaBurrowsRoss Dumps and CollimatorsKEK ?? Accelerator PhysicsKuboSchulte?? Global Systems Commissioning, Operations & ReliabilityTerunumaElsenHimel Control SystemMichizonoSimrockCarwardine CryogenicsHosoyamaTavianPeterson CF&SEnomotoBaldyKuchler InstallationShidaraBialwons?? - B. Barish Dec. 9,05 - Updated list: K. Yokoya

Charges of Area System, Tech. System and Global System and Also Schedule toward RDR - GDE-EC Jan 13, Described in a file, RDR_Charges_ doc.

Steps toward RDR GDE Meetings Bangalore Vancouver Barcelona Bangalore : To coordinate the work for the RDR and cost estimate. A place for communications between the various groups and the boards.

Request for Sample Site Information To be used to study siting issues, in advance of a call for “expressions of interest” to host the ILC - B. Barish Dec. 9,05 -

Goals of the Meeting 1. To have an understanding of the GDE activities and also to have a good prospect for the RDR and beyond. 2. To exchange idea for the R&D programs in Asian laboratories. Thank you for your attention.

Back-up slides

Items kYenFTE ATF ATF Operation 145, ATF Injector Operation70, ATF2 construction82, SC RF Cavity LL Cavity development72, TESLA-type Cavity development 116, Basic Engineering for Cavity20, STF Beam Monitors & Operation System 29, RF system 173, Cryogenics Plant50, Cryostat fabrication 100, Electro-Polishing System construction 57, Others Management69, Total 987,

Area of spendFTEs Other funds (k € )Total (k € ) Injector SCRF Linac Tech BDS Diagnostics Beam Dynamics Infrastructure Totals

GDE Structure and Organization GDE New Groups –Design / Cost Engineers Shidara – Asia Bialowons – Europe Garbincius – Americas –Siting, Civil Construction and Infrastructure Baldy - Europe Enomoto – Asia Kuchler – Amercas –Physics / Detectors (WWS chairs) Brau - Americas Richard - Europe Yamamoto - Asia –Accelerator Experts (44 GDE members)

Responsibilities of the Central Team Manage the execution of the ILC design and associated R&D; Establish technical and administrative controls to ensure that the agreed-upon work toward the RDR and TDR is executed within their approved cost, schedule and technical scope under the MOU; and Maintain and control the machine parameters database and configuration documents, and direct overall design effort. ILCSC – Daigu Sept 05 : B. Barish

Approach to ILC R&D Program Proposal-driven R&D in support of the baseline design. –Technical developments, demonstration experiments, industrialization, etc. Proposal-driven R&D in support of alternatives to the baseline –Proposals for potential improvements to the baseline, resources required, time scale, etc. Develop a prioritized DETECTOR R&D program aimed at technical developments needed to reach combined design performance goals. - B. Barish Dec. 9,05 -

The Area system reports should include progress since Frascati, unresolved issues, schedule for completing the design with milestones, what communications have taken place with the TS and GS, what will be needed on what timescale, what problems they foresee, concerns, etc.. The Technical systems should present what has been done so far, cost and engineering methodologies, level of detail of the estimates, when they need what information from the AS and GS, schedule for completing the cost estimate with milestones, what problems they foresee, concerns, etc.. The Global system reports should include some combination of the above – progress, schedule, milestones, communications, needs, problems, etc.