1 Preliminary UTA drawing of Mike’s concept for a fast time resolution Cerenkov counter: proton Microchannel plate PMT Initial design uses 2 mm 2 rods,

Slides:



Advertisements
Similar presentations
Solids in contact..
Advertisements

ULTIMATE PORTABLE WORKSTATION Produced by Gavin Weyrich.
T958! Fermilab Test beam experiment to study fast timing counters for FP420 MOU between UTA, Alberta, Louvain, Fermilab (Brandt spokesman) Data taking.
Quartz Plate Calorimeter Prototype Ugur Akgun The University of Iowa APS April 2006 Meeting Dallas, Texas.
QUARTZTOFMike Albrow CMS-FP420 April 28 th 2008 QUARTZTOF An isochronous & achromatic Cerenkov Counter Making Cerenkov light parallel  point focusing.
 Introduction  Designing of Die Block  Process of making Press Form Points to be Covered PRESS FORM AND RUBBER TECHNOLOGY.
3 rd Angle Projection A 3 rd Angle projection is a 2D drawing of a 3D object. It shows three views the side, plan and end view. The side view is drawn.
Development of Surfaces.
Perpendicular lines By Alma Villarreal. What are perpendicular lines? Perpendicular lines are lines, segments, or rays that intersect toform right angles.
SHEET METAL WORKING.
1 QUARTIC, A TOF for ATLAS/CMS Forward Protons You didn’t know that ATLAS+CMS had forward protons? FP420 = Forward Protons 420m downstream of CMS & ATLAS.
08/31/02PID TOP Counter R & D Status — PID and Physics — TOP Counter — R&D Status Katsumi Senyo Nagoya University.
Orthographic, Oblique & Isometric Projections
1 QUARTIC: UTA Update Andrew Brandt, Chance Harenza, Joaquin Noyola, Pedro Duarte Preliminary UTA drawing of Mike Albrow’s concept for a fast time resolution.
RF background, analysis of MTA data & implications for MICE Rikard Sandström, Geneva University MICE Collaboration Meeting – Analysis session, October.
Volumes of Pyramids & Cones
Extension. Calculate the area and perimeter of each of these shapes. 5cm 9cm 3cm 2cm 10cm 7cm 1cm 7cm 2cm 12cm 13cm
Fast Timing Workshop Krakow, Nov 29 - Dec 1 st 2010 Part 2b.
TOF for ATLAS Forward Proton Upgrade AFP concept: adds new ATLAS sub-detectors at 220 and 420 m upstream and downstream of central detector to precisely.
1 E906 Pre-Amplifier Card 2009/10/07. 2 E906 Wire Chambers Station1 MWPC: –build a new E906 MWPC. –4500 channels in total. Station2 DC: –recycle old E866.
High Energy Physics at UTA UTA faculty Andrew Brandt, Kaushik De, Andrew White, Jae Yu along with many post-docs, graduate and undergraduate students investigate.
Cross Sections SWBAT: Describe the two-dimensional figures that result from slicing three-dimensional figures with a plane.
1 QUARTIC Update Andrew Brandt (UT-Arlington), Mike Albrow (FNAL), Jim Pinfold (Alberta) Preliminary UTA drawing of Mike Albrow’s concept for a fast time.
Fringes Color pattern occurs because incident light is not monochromatic.
FP420/AFP Timing Two types of Cerenkov detector are employed: QUARTIC – two QUARTIC detectors each with 4 rows of 8 fused silica bar allowing up to a 4-fold.
f30 G1 G A a F B E C D T F A1 A G G1 B C G A 50 G1 A1
True Shapes The Rectangular Prism.
DO NOW!!! (1 st ) 1.A rectangular prism has length 4 cm, width 5 cm, and height 9 cm. a) Find the area of the cross section parallel to the base. b) Find.
Tracker Summary Alan Bross MICE CM October 10, 2007.
One Point Perspective One point perspective is a 3D drawing using one vanishing point on the horizon. Objects going into the distance arrive at the same.
Andrew BrandtSept 13 th 2005FP420/Cerenkov Intro 1 Location of LHC in France and Switzerland, with lake Geneva and the Alps in the background The ATLAS.
Mike AlbrowSept 14 th 2006Time-of-Flight with GASTOFs im Test Beam 1 Fast Timing Counters for FP420/CMS and Test Beam Particle ID Mike Albrow, September.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
Fast Timing Mtg April 15 th 2009 Mike Albrow Fast Timing studies at Fermilab : Test beam plans notes from meeting April 15 th 2009 MTest May Wed 27 th.
CLIC Permanent Magnet Quadrupole Engineering Development of second family member Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 07/11/2012.
APS April Meeting Detector Construction of the Forward Proton Detector at D0 Michael Strang University of Texas at Arlington Diffractive Events FPD.
Machinists' Parts Drawings Heat Exchanger (HE) block Authorized Access Keith Sawa Findlay’s Machine Shop.
1 10 Psec Workshop April 28 at UTA Follow up on visit to SLAC to meet Jerry Va’vra and very successful Pico-Second Timing Hardware Workshop at University.
QUADRILATERAL. Four sided closed figures are known as ‘QUADRILATERALS’. There are different types of quadrilaterals. They are differ by their properties.
Beam Halo Monitor : Q-bars+SiPMMike Albrow, 26 Aug 2010 A Beam Halo Monitor for the LHC based on Quartz Cherenkov Counters Mike Albrow (Fermilab) Features:
Homework: Use the information that you gathered this week to draw out your plan view working drawing, 1:1 scale. Use sheet 6. Hand in next week. Start.
STAR J/  Trigger in dA Manuel Calderon for the Heavy-Flavor Group Trigger Workshop at BNL October 21, 2002.
KOPIO Catcher System RSVP Preliminary Baseline Review Brookhaven National Laboratory April 6, 2005 Tadashi Nomura (Kyoto U.)
The Babar Cherenkov Detector Detection of Internally Reflected Cherenkov Yuen-Jung Chang.
By Emily Beaumont. I used graphite pencils from 9H to 9B and made a scale from light to dark by pressing on harder with the pencils as I got further down.
3 rd Angle Projection A 3 rd Angle projection is a 2D drawing of a 3D object. It shows three views the side view is drawn first. The plan view is drawn.
FP420/AFP Fast Timing Stage I: LHC luminosity 2 x10 33  t < 20 ps (
Pileup Background Rejection Ex, Two protons from one interaction and two b-jets from another Fast Timing Detectors for FP420 z=c(TR-TL)/2  z (mm) =0.21.
Cones. Cones are shapes that have a circular base and come to one point at the top.
Time resolution for the full detector system: 1. Intrinsec detector time resolution 2. Jitter in PMT's 3. Electronics (AMP/CFD/TDC) 4. Reference Timing.
PPAC Parallel Plate Avalanche Counter Edwin Norbeck University of Iowa For meeting at SLAC June 2, 2004.
HPS: R&D issues Krzysztof Piotrzkowski (UCLouvain/CERN)
UNIT-2 MACHINING.
Test Beam Studies for FP420 Fast Timing
SHEET METAL WORKING.
A precision measurement of d2 on the neutron
Andrew Brandt (UT-Arlington), Mike Albrow (FNAL),
Quartz Detectors for the SuperHMS Spectrometer A
Cross Sections SWBAT: Describe the two-dimensional figures that result from slicing three-dimensional figures with a plane.
Cross Sections SWBAT: Describe the two-dimensional figures that result from slicing three-dimensional figures with a plane.
Cross Sections SWBAT: Describe the two-dimensional figures that result from slicing three-dimensional figures with a plane.
SHEET METAL WORKING.
goteachmaths.co.uk Volume of a Cuboid – Complete Lesson
Week 3 Web site Point Filters
UCB Progress with 8” MCPs and Testing
Name the shape ….
Variable distance from beam.
Baseline preamp (as in beam test) Test pulser to simulate MCP-PMT
Presentation transcript:

1 Preliminary UTA drawing of Mike’s concept for a fast time resolution Cerenkov counter: proton Microchannel plate PMT Initial design uses 2 mm 2 rods, now believe 6 mm 2 rods are more feasible QUARTIC October Quartz Timing Cerenkov Meeting A. Brandt/M. Albrow

2 Updated Raw Cerenkov light in fused silica: UV is important! total, -> 130 pe/6mm rod (but this is still for whole cone, perhaps 10 pe’s in reasonable time range—still in progress) λ#PEQE#p*Q Eθcn % % % % % total638.0 #P aveθc aveLQ E ave#P.ave*QEave cm15.57%648.0 Mike’s back of envelope -> 200 pe’s

3 Updated Raw Cerenkov light in fused silica: Same info as last slide, but in pictoral form

4 Ultra-preliminary time distribution: 11% of accepted pe’s in first bin, but don’t know time width of this bin! hot off the press!

5 New Quote from Specialty Glass Fused Silica rod, 6mm+-.051mm x 6mm+-.051mm x 10cm+-.025cm; 6mm x 10cm sides mechanically polished, less than or equal to 1 wave/inch flatness, within 1 degree parallelism; sides and ends perpendicular within 1 degree; ends ground. Qty 50 pieces Price$25.00 each Ship4 - 5 weeks ARO Same as above except 4mm square cross section:100 $18.00 ea Andrew, the above prices represent SGP machining the entire part, which is not quite as cost effective as creating a rod, then finishing it. Although, it is probable that the mechanically polished faces (as above) would actually be flatter and smoother. Also, the edges will be sharper. For reference 2mm rods would cost 3-4k$; only 20 6mm rods needed per detector

6 UTA News Submitted internal preproposal for Texas ARPSubmitted internal preproposal for Texas ARP Plan to submit DOE ADRPlan to submit DOE ADR Calculating background rejection as f(resolution)Calculating background rejection as f(resolution) Calculating time distributionCalculating time distribution Asked for distribution of protons as f(x,y) at 420m;Asked for distribution of protons as f(x,y) at 420m; haven’t got it yet haven’t got it yet Poster session at UTA leads to EE contactsPoster session at UTA leads to EE contacts Pursue other fused silica vendors, or just buy these?Pursue other fused silica vendors, or just buy these? Have no PMT newsHave no PMT news