Post Mortem Workshop Session 4 Data Providers, Volume and Type of Analysis Beam Instrumentation Stéphane Bart Pedersen January 2007.

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

Digital Filter Mode Switch Closed Orbit Mode Fast Abort Buffer Slow Abort Buffer Profile Frame Buffer Display Frame Buffer - Switch activated every 2ms.
Post Mortem Workshop - discussion1 17/1/2007 HWC Requirements GMPMA  Concentrate on pre-beam requirements Post-quench analysis ([semi-] automatic) Integrity.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Status and plans for LHC DC BCT systems P.Odier DC BCT hardware modifications Proposal for choice of acquisition system (VD80 or 24- bit ADC) for the CCC.
High Level LHC Schottky Software Development Jerry Cai & The LAFS Team.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
Guy Crockford AB/OP OP Days, 7/2/2007 LHC Specific BI Systems This presentation reviews the status of the specific BI systems for the LHC. The work plan.
Distributed BI Systems BLM, BPM, BTV and BRAN Laurette Ponce & Fabio Follin Thanks to: Anthony Rey, Enrico Bravin, Rhodri Jones, Bernd Dehning, Mariusz.
WP CO Column Status and Progress October 7th, 2010 Johannes Gutleber PR a-JGU, October 7th, 2010 J. Gutleber 1 R. Gutleber.
BCT for protection LHC Machine Protection Review April 2005 David Belohrad, AB-BDI-PI
Measurement opportunities with the LHC transverse damper W. Hofle, D. Valuch.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
LHC BLM Software revue June BLM Software components Handled by BI Software section –Expert GUIs  Not discussed today –Real-Time software  Topic.
The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli, Stephen Foulkes, Margaret Votava and Charles Briegel Fermi National Accelerator.
“Post Mortem” during Beam Operation Why me ? I have no general responsibility for post-mortem Within CO, I did only little work on it The questions asked.
October 2002 Jean Slaughter SDA – Shot Data Analysis Outline Description of SDA Examples Plans for 2003 SDA is a system for acquiring and analyzing data.
Signals between LHC Machine & ALICE: an Update David Evans ALICE TB 23 rd February 2006 (with input from Detlef Swoboda)
Based on Lars’ progress report of LIU SPS BI Status of follow-up 13/10/2015Lars K. Jensen, V. Kain1.
E.B. Holzer Chamonix XV workshop, Divonne-les-Bains January 24, BI Group Commitments and Major Issues for Distributed Systems E.B. Holzer, J.J.
© 2001 By Default! A Free sample background from Slide 1 The Equipment Access API WG Report 6 th February 2003 V. Baggiolini,
H.Schmickler, AB-BDI Chamonix XIV workshop, CERN January 18, Beam Commissioning of LHC instrumentation Chamonix XIV, January 2005 H.Schmickler.
Fermilab February 17, 2003Recycler BPM Front-end1 Duane C. Voy
Nominal Workflow = Outline of my Talk Monitor Installation HWC Procedure Documentation Manufacturing & Test Folder Instantiation – NC Handling Getting.
Real time performance estimates of the LHC BPM and BLM system SL/BI.
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
The 1 st year of TMS operations Stéphane Bart Pedersen BE-BI-SW November 2011.
08h15: Injection.  Correction injection oscillations.  Transfer line steering.  Losses at 30% of dump threshold, limited by SPS scraping. 12h35: Start.
TBPM Front-End Software Design Review L.Piccoli April
PM System Architecture Front-Ends, Servers, Triggering Ingredients Workshop on LHC Post Mortem Session 1 – What exists - PM System, Logging, Alarms Robin.
9/2/2003Tev BPM requirements1 Tevatron BPM and BLM requirements Mike Martens.
16-17 January 2007 Post-Mortem Workshop Logging data in relation with Post-Mortem and archiving Ronny Billen AB-CO.
LIU-SPS action list for BE/BI L. Jensen with input from BL, PI, QP, PM 27/08/2015Lars K. Jensen BE/BI/SW1.
LIU-SPS progress for BE/BI L. Jensen on behalf of BE/BI 27/08/2015Lars K. Jensen BE/BI/SW1.
IPOC Software for LBDS Data Acquisition & Analysis LBDS Technical Audit CERN - AB/BT/EC - N.Magnin.
AC-Dipole Upgrades LHC Optics Measurement and Corrections review June CERN N. Magnin – TE/ABT/EC Thanks to E.Carlier, R.A.Barlow, J.Uythoven.
Status of the AWAKE Control System Edda Gschwendtner, Janet Schmidt, Marine Gourber-Pace, Roman Gorbonosov, Peter Sherwood AWAKE Technical Board, 27 January.
12/16/03Tev BPM requirements1 Tevatron BPM requirements Mike Martens.
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 SLC Aware IOC BSAC* Facility Requirements Review *Beam Synchronous.
The Dashboard The Working Conditions The Common Chapters State What’s Next.
BEAM INSTRUMENTATION GROUP DEPENDABILITY APPROACH CERN, Chamonix 26th January 2016 William Viganò
Interfacing the FMCM for additional protection in the LHC and the SPS- LHC/CNGS Transfer Lines to the CERN controls system Cristina Gabriel Casado, Interlock.
LCLS MPS Upgrade Gasper Jansa, Luciano Piccoli, Jeff Olsen, Garth Brown, Sonya Hoobler, Stephen Norum, Stephanie Allison, Kim Kukhee Adding BSA.
LHC RT feedback(s) CO Viewpoint Kris Kostro, AB/CO/FC.
AB-CO Review September Session on circuit commissioning Session on circuit commissioning Post-Mortem requirements F. Rodríguez-Mateos on behalf.
MPE Workshop 14/12/2010 Post Mortem Project Status and Plans Arkadiusz Gorzawski (on behalf of the PMA team)
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
PS Orbit Second year of TMS Operation Stéphane Bart Pedersen BE-BI-SW July BE-BI-SW July 2013.
Use of a Diamond BLM System in the LHC Ring
RF acceleration and transverse damper systems
A monitoring system for the beam-based feedbacks in the LHC
Data providers Volume & Type of Analysis Kickers
Irradiation test of Commercial (BASLER) digital cameras
LHC General Machine Timing (GMT)
DRY RUNS 2015 Status and program of the Dry Runs in 2015
TBPM Front-End Software Design Review
Use of a Diamond BLM System in the LHC Ring
BE-BI Software for LINAC4
P. Forck, P. Kowina, M. Schwickert, R. Singh
Fast losses at collimators during 16L2 dumps
Monday 14th March Second fill with pilot + 3 nominal bunches
Distributed BI Systems
Combiner functionalities
Dry Run 0 Week 13: BI test of...everything circulating beam: all fixed displays and BI applications OP directories for 2009, concentrators running Need.
Wire almost entirely through beam before BLM triggers dump
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
Global Post Mortem Event Event Timestamp: 15/06/12 15:54:
LHC dry-runs (BE-BI view)
LHC BLM Software audit June 2008.
LHC Systems Providing Post-Mortem Data
Presentation transcript:

Post Mortem Workshop Session 4 Data Providers, Volume and Type of Analysis Beam Instrumentation Stéphane Bart Pedersen January 2007

Overview  How do BI proceed with a new system  PM interface specification document  Systems specified  Beam Position Monitor  Beam Loss Monitor  Fast Ring Beam Current Transformer  Slow/Fast Synchrotron Light Monitor  Tune Measurement  Still to do  Conclusion

How do BI proceed  Post-mortem functional specification (OP/ABP/CO/BI). Doc. approved in EDMS.  PM interface specification document  PM structure requested from AB-CO  PM software interface delivered by AB-CO  Low-level software implementation in FESA control servers

PM interface specification document  PM requirement from the PM specification  PM structure to be sent to the PM server  Default fields (common for all systems) runNb pmFreezeStamp [UTC timestamp CTIM PM freeze event, jitter < 1 millisecond] acqStamp [UTC Last acquisition timestamp] analysisResult [First order pre-analysis of the PM data including the hardware status] 0:DATA OK 1:UNTESTED 2:WARNING 3:ALERT 4:HW PROBLEM analysisResultDescription  Data (contains the full information, ready to be analyzed)  PM data volume  PM buffer type and triggering  Other : Data display example, pre-analysis SELF EXPLANATORY long long orbitTurnStamp[1024] float H/V orbitPosition[18][1024] long long turnStamp[1024] float H/V turnPosition[18][1024] string bpmNames[18] string unit int unitExponent BLMBLM

Beam Position Monitor PM Requirement (1) Horizontal/Vertical beam positions turn by turn over a total of the last consecutive 1024 turns (2) Horizontal/Vertical average closed-orbit positions over the last 9 seconds (last 1024 closed orbits) PM Buffer Hardware PM Data Volume ~320 Kbytes per front-end computer ~20 Mbytes for the 64 FECs (>1000 pickups) PMD Viewer Example

Beam Loss Monitor PM Requirement (1) Last 1024 turn losses for each BLM (2) Last 1024 multi-turn losses for each BLM PM Buffer Hardware PM Data Volume ~78 Mbytes per front-end computer ~2 Gbytes for the 25 FECs (>4000 pickups) PMD Viewer Example

Fast Ring Beam Current Transformer PM Requirement (1) Turn by turn, bunch by bunch intensities for the last 227 turns (2) Turn by turn total intensities over the last 1024 turns (3) Bunch by bunch life time last evaluation (4) Beam lifetime evolution over the last 100 seconds PM Buffer Hardware PM Data Volume ~3.3 Mbytes per front-end computer ~13.2 Mbytes 2 FECs for each beam [1 operational & 1 spare] PMDViewer Example

Slow Camera Synchrotron Light Monitor (BSRT) PM Requirement (1) Horizontal/Vertical beam sizes acquired every 100 ms over the last 10 seconds (2) Horizontal/Vertical beam positions acquired every 100 ms over the last 10 seconds (3) Horizontal/Vertical beam profiles acquired every 100 ms over the last 10 seconds (4) Beam image acquired every 100 ms (last acquisition before dump) PM Buffer Software PM Data Volume ~350 Kbytes per front-end computer ~700 Kbytes 1 FEC for each beam PMDViewer Example

Fast Camera Synchrotron Light Monitor (BSRT) PM Requirement (1) H/V bunch by bunch beam sizes acquired every minute (last 10 min acquisition before dump) (2) H/V bunch by bunch beam positions acquired every minute (last 10 min acq. before dump) (3) H/V bunch by bunch beam profiles acquired every minute (last acq. before dump) PM Buffer Software PM Data Volume ~17 Mbytes per front-end computer ~34 Mbytes 1 FEC for each beam PMDViewer Example

Tune Measurement PM Requirement (1) The last 100 H/V tune measurements calculated over N turns. N is set by the user (2) The last 100 measurement time stamps (3) The last 100 N values used for the tune calculation (4) The last turns of raw H/V oscillation data PM Buffer Software/Hardware PM Data Volume ~1 Mbytes per front-end computer ~2 Mbytes 1 FEC for each beam PMDViewer Example

Still to do  Beam Current Transformer DC  Abort Gap Monitor  PLL Tune and Measurement System  Post-Mortem for dump line instrumentation?

Conclusion  Things might change in the coming months  So far, BI has no requests for the post- analysis beside the plot  BI maintains the website LHC Instrument and Diagnostic Software (LIDS) with instrument uses including post-mortem  Tests done with the first PM interface provided by CO  PM ready to be tested on 20 LHC crates (ex: scalability test) and…  …On 100 LHC crates from June/July

First Test PM data pushed by a FESA control server to a local PM server Only one FESA device analysisResult simulated (white/green/yellow/red)