LBT Q3 2008 Engineering and Software Review ENGG Engineering General.

Slides:



Advertisements
Similar presentations
Hovering Solar Concentrators A Low Cost Design for Large Scale Solar Power Generation By Dr. Brian Glassman.
Advertisements

Report from MICE project teams Proposed MICE organogram: revised Revised request for resources for financial year 2003/04 Review of iMICE schedules – status.
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Engineering Review ALPC – Primary Mirror Aluminum Shooting.
1 LBT Q Eng/SW Review SHTR: Shutters. 2 Highlights (Q1/2009) Shutters have been working well, generally Shutters have been working well, generally.
Offensive/defensive evaluation: Define all functionalities of the game brainstorm early designs, evaluate feasibility, resource requirements Shooting (High.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli, Chris Biddick.
David H. Dowell Injector RF Design November 3, LCLS Injector RF Gun: Design, Fabrication & Tuning Plans D. H. Dowell,
Ocimum Systems: –Established in the year 2013 in Bangalore with a team having over a decade of expertise in the networking industry and a vision to provide.
J. Large Binocular Telescope (LBT) Operational Readiness
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Kern.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Eng/SW Review ROT - Rotators. 4-Apr-2008LBT Q Eng/SW Review Highlights First BG rotator installed First BG rotator installed BG cable.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review Primary Mirror Cells Biddick/Gusick/Kern.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Eng/SW Review ECS: Enclosure Control System.
LBT Q Engineering Review Swing Arms (SWA) Apr-04LBT Q Engineering Review Highlights (Q4/2007) The PF SAs lost their cable trays The.
Magellan F/5 System Status A.Szentgyorgyi / Ann Arbor 25 Sept 2005.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
1 LBT Q Engineering Review ICS – Instrument Cooling System.
LBT Q Software Review GCS – Guiding and Active Optics.
1 LBT Q Eng/SW Review PVM: Preventive Maintenance.
LBT Q Eng/SW Review TERC Tertiary Mirror Units Commissioning.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Howard.
3.1.1 Optics, Optical Corrector, Mechanical Systems M. Johns, C. Claver.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Engineering Review Instrument Cooling.
1 LBT Q Eng/SW Review ICS – Instrument Cooling System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Eng/SW Review SFWG – Software Group Norm Cushing.
LBT Q Engineering Review SAB Static Balancing.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Eng/SW Review CM – Configuration Management Stephen Hooper.
1 LBT Q Eng/SW Review PWR: Site electrical power.
1 LBT Q Eng/SW Review ECS: Enclosure Control System.
LBT Q Engineering Review ESW Engineering Software.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
LBT Q Engineering/Software Review ROTRotators.
1 LBT Q Eng/SW Review PWR: Site electrical power.
望遠鏡の運用状況 友野大悟. CAUTION Telescope is becoming unstable.
LBT Q Eng/SW Review DIMM – Differential Image Motion Monitor.
K-Band Focal Plane Array Steven White Program Manager.
GBT Focal Plane Array K band 7 Pixel Steven White Program Manager.
LBT Q Engineering Review PMCD. 21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.
LBT Q Engineering Review DAQ. 19-Apr-2007LBT Q Engineering Review Housekeeping System Requirements Interface directly to the Agilent 34970A.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Engineering Review Swing Arms (SWA). 10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) The right secondary arm is wired and the.
LBT Q Engineering Review Primary Mirror Cells.
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
LBT Q Engineering Review ENGG – Engineering General.
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
LIU Wire Scanner Milestones June 2017
About Us Ocimum Systems:
Budget Budget Contingency/ Cost Risks Descope Options
Peer Review Agenda (Suggested).
Outsourcing Strategies
Electron Beam Systems ETC and Methodology
Adapting to the DESY Motion System
Presentation transcript:

LBT Q Engineering and Software Review ENGG Engineering General

10/20/2008 LBT Q Engineering and Software Review Highlights (Q3/2008) Installed LFBG cable chain and commissioned LFBG rotator and cable chain. The rotator and cable chain has performed very well. Installed LFBG cable chain and commissioned LFBG rotator and cable chain. The rotator and cable chain has performed very well. Completed all Engineering goals necessary to get LUCIFER on the sky Completed all Engineering goals necessary to get LUCIFER on the sky Installed and tested RFBG rotator Installed and tested RFBG rotator Identified and corrected (a/the?) SX PMC positioning problem Identified and corrected (a/the?) SX PMC positioning problem The “super hardpoint” conceptual design is now nearly complete The “super hardpoint” conceptual design is now nearly complete Fixed MCS elevation strip encoder issue Fixed MCS elevation strip encoder issue Found and corrected the source of the M3 rotation axis stiction Found and corrected the source of the M3 rotation axis stiction Replaced damaged SX M3 motor Replaced damaged SX M3 motor Integrated DX M3 mirror cell into corresponding M3 unit Integrated DX M3 mirror cell into corresponding M3 unit Finalized the design and ordered the DG rotator ISS Finalized the design and ordered the DG rotator ISS Specified and ordered the DG rotator encoder tapes Specified and ordered the DG rotator encoder tapes Fabricated and installed –Z weight stations Fabricated and installed –Z weight stations Provided support for a successful SX aluminizing Provided support for a successful SX aluminizing

10/20/2008 LBT Q Engineering and Software Review Progress (Q3/2008) Hire open EE position (not yet) Hire open EE position (not yet) PMCD review (postponed) PMCD review (postponed) Test RFBG rotator √ Test RFBG rotator √ Support aluminizing √ Support aluminizing √ Commission LFBG rotator & cable chain √ (open action items) Commission LFBG rotator & cable chain √ (open action items) Diagnose SX mirror cell motion problems √ Diagnose SX mirror cell motion problems √ M3 M3 Install unit #2 cell √ Install unit #2 cell √ Replace unit #1 motor √ Replace unit #1 motor √ Reinstall and align unit #1 √ Reinstall and align unit #1 √ Support LUCIFER installation √ Support LUCIFER installation √ Install –Z counterweights √ Install –Z counterweights √ DYB punch list √ DYB punch list √

10/20/2008 LBT Q Engineering and Software Review Open Issues Technical Technical Gregorian vibration Gregorian vibration System reliability needs improvement System reliability needs improvement HBS HBS MCS MCS M3 M3 Schedule Schedule So many subsystems / so little commissioning time So many subsystems / so little commissioning time Telescope schedule increasingly competitive Telescope schedule increasingly competitive DG rotator schedule has no contingency DG rotator schedule has no contingency Financial Financial Instrument rotators have eaten this year’s budget Instrument rotators have eaten this year’s budget `09 budget allocation lower than requested `09 budget allocation lower than requested Resource Resource Group work load high Group work load high Open EE position Open EE position Resources may be insufficient to commission all subsystems on the current timetable Resources may be insufficient to commission all subsystems on the current timetable

10/20/2008 LBT Q Engineering and Software Review Planning (Q4/2008) Complete bulk of DG rotator and cable chain design (some details will spill over into Q1/09) Complete bulk of DG rotator and cable chain design (some details will spill over into Q1/09) Address all LFBG rotator and cable chain commissioning action items Address all LFBG rotator and cable chain commissioning action items Complete “super hardpoint” conceptual design Complete “super hardpoint” conceptual design Hold a review of the “super hardpoint” design Hold a review of the “super hardpoint” design Build a prototype “super hardpoint” with mechanics and electronics Build a prototype “super hardpoint” with mechanics and electronics PMCD review (handover late in Q4/08 or early Q1/09) PMCD review (handover late in Q4/08 or early Q1/09) Install and tune all HBS capillaries Install and tune all HBS capillaries Implement a new vibration monitoring system Implement a new vibration monitoring system Understand the source of the Gregorian vibration Understand the source of the Gregorian vibration Develop and test a prototype of a new shutter latching mechanism Develop and test a prototype of a new shutter latching mechanism Make several MCS - DSP/FPGA improvements (continue into Q1/09) Make several MCS - DSP/FPGA improvements (continue into Q1/09) DYB documentation review DYB documentation review DYB handover (depends on ETS resources) DYB handover (depends on ETS resources) Fill open EE position Fill open EE position