Settlement Update Blake Holt ERCOT 2/15/2016. Agenda NPRR689 – R1 – 02/10/16 NPRR744 – Buy-Back notification NPRR746 – Negative load impacts 2016 Settlement.

Slides:



Advertisements
Similar presentations
Lead from the front Texas Nodal 1 Texas Nodal Settlements Mini-Market - CARD July 27, 2007.
Advertisements

INSULATING PRICE RESPONSIVE LOAD FROM RUC CAPACITY SHORT CHARGE Mark W. Smith J. Kay Trostle August 2008 DSWG.
ERCOT Draft NPRR Phase 2 ORDC RATF July 8, ERCOT draft NPRR Phase 2 ORDC Draft NPRR will include the following clarifications or additions: Updates.
NPRR605 Ancillary Service Make-Whole Payments Under a Watch.
Loads Acting as a Resource Relationships with QSEs and LSEs
COPS – ERCOT PROJECTS UPDATE WHOLESALE MARKET DEVELOPMENT Paula Feuerbacher August 23, 2005.
NPRR 336, Authorize ERCOT to Procure Additional RRS During Severe Cold Weather Consideration of Tenaska and Luminant Comments.
John Dumas Director of Wholesale Market Operations ERCOT Operating Reserve Demand Curve.
April 23, 2014 DSWG Loads in SCEDv1 Load Participation in SCED v1 Overview & Refresher ERCOT Staff.
1 Generator Telemetry and Market Prices WebEx Training July 28 th, 2015.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
7/15/2013 CSWG CSWG – ERCOT Update ERCOT Matthew Tozer.
1 Project Update and Summary of Project Priority List (PPL) Activity September 10, 2015.
1 Settlement Changes R5 (SEP 2015) and R5.5 (OCT 2015) Blake Holt ERCOT COPS 9/14/2015.
Settlement of Mothballed RMR Resources for System Capacity November 15, 2011 RDTF Meeting Ino González ERCOT November 14, 2011.
January 14, New logic and invoices used in January 2015 when closing out December 2014 New Bill Determinants: CRRBAFA- CRR Balancing Account Fund.
RCWG Update to WMS July 10, General Update Agenda Items for Today: Fuel Adder NPRR 485-(no vote) Variable O&M for Technology Types (vote) Seasonal.
PRS - RPRS Task Force Status Summary - August 14, PRS RPRS Task Force Status Summary Prepared for WMS and PRS August 2006.
Nodal Program Update and SEWG Update COPS 1/11/2011 Jim Galvin.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
1 Project Update and Summary of Project Priority List (PPL) Activity to Date May 15, 2014.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 NPRR to Clarify RUC Capacity Shortfall Ratio Share Formula.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
COPS – ERCOT PROJECTS UPDATE WHOLESALE MARKET DEVELOPMENT Paula Feuerbacher February 22, 2005.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
N ODAL P ROGRAM U PDATE TO C OPS Jim Galvin.
Ancillary Services Replacement Presenter: Ino González Wholesale Market Subcommittee July 8, 2015 ERCOT Public.
ERCOT Public 1 Overview of ERCOT Concept Paper on Real-Time Co-optimization of Energy & Ancillary Services & Multi-Interval Real-Time Market.
Settlements Seminar February 10, 2016 ERCOT Public.
QSE Managers Working Group Report to WMS, April 8, 2011 S. Looney, Luminant.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
Default Uplift Max MWh Activity Total Matthew Tozer Manager, Settlements and Billing WMS 1/8/2014.
November 27, 2012 NPRR322, Real-Time PTP Option Modeling Implementation Overview.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
ORDC Settlements Overview Matthew Tozer & Blake Holt ERCOT CSWG 4/21/2014.
NPRR680 background concept Carrie Bivens Manager, Day-Ahead Market PRS February 12, 2015.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
Resource Adequacy Task Force (RATF) Update to WMS October 8, 2013.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Real Time Operations Energy Settlements Business Requirements.
October, 2011 MCWG/CWG Review of Abacus Loss Allocation ERCOT Mandy Bauld.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
Nodal Settlement Status and Observations Jim Galvin, SEWG Chair.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Day-Ahead Mini Market Mini Market Walk Through for Day-Ahead.
Settlement Stability 2015 Q1 Update to COPS- DRAFT Blake Holt ERCOT COPS 07/15/2015.
1 Project Update and Summary of Project Priority List (PPL) Activity to Date June 11, 2014.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Reliability Unit Commitment (RUC) Settlements Business Requirements.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
May 28, 2015 and June 30, 2015 Information Session TAC Meeting Update to COPS Michelle Trenary, July 15, 2015.
1 February, 2012 QMWG S&B Protocol Clarifications QSE-Requested Decommitment of a DAM Commitment ERCOT Mandy Bauld.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
WRUC – Long Lead Time Commitments QSE Manager’s Working Group ERCOT Operations March 23, 2016.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
Commercial Operations Subcommittee (COPS) Update to TAC 4/28/2016
Ancillary Services Replacement
CRR Deration and NPRR821 WMS 09/06/2017.
Settlement Update Austin Rosel ERCOT February 27, 2017.
Real-Time Co-optimization of Energy & Ancillary Services
Settlement Update Austin Rosel ERCOT October 11, 2017.
Real-Time Co-optimization of Energy & Ancillary Services
COPS MAY 2014 UPDATE TO TAC 5/29/2014
NPRR829 Incorporate Real-Time Telemetered Net Generation for Non-Modeled Generation into the Real-Time Liability Estimate ERCOT PRS Meeting May 11, 2017.
Presentation transcript:

Settlement Update Blake Holt ERCOT 2/15/2016

Agenda NPRR689 – R1 – 02/10/16 NPRR744 – Buy-Back notification NPRR746 – Negative load impacts 2016 Settlement changes

PUBLIC NPRR689 – 2/10/2016 production release (R1) 3 NPRR689 - Settlement of Ancillary Service Assignment in Real-Time Operations Settlement mechanism for NPRR663 Ancillary Service Insufficiency Actions If sufficient Ancillary Services cannot be procured via DAM, SASM and RUC, then Ancillary Service will be assigned to QSEs. QSE assigned the Ancillary Services (Reg-Up or RRS) is paid the assigned MW times the RTSPP minus the ORDC price adder. Costs are spread the same way as current AS costs are spread, on Load Ratio Share basis. The QSE will receive a Verbal Dispatch Instruction from ERCOT for the assignment. The QSE must file a settlement dispute to be considered for the payment. ERCOT implemented this process manually: Data will not be provided in the extracts (can be requested from account manager) Will be invoiced via a Misc. Invoice.

PUBLIC NPRR689 – 2/10/2016 production release (R1) 4 QSE share of total costs: ARUCOST q = ARUPR * ARUQ q Where: ARUPR = ARUCOSTTOT / ARUQTOT ARUQTOT= ARUQ q ARUQ q = ARUO q – SARUQ q ARUO q = WAURUTOT * HLRS q + RUO q WAURUTOT = RTAURUR q,r,p QSE incremental costs: NETARTRUAMT q = ARUCOST q - RUCOST q Total Costs during a Watch: ARUCOSTTOT = (-1) * RTAURUAMTTOT + RUCOSTTOT Where: RTAURUAMTTOT = RTAURAMT q,r,p Payment for Un-deployed Assigned AS: RTAURUAMT q,r,p,i = (-1) * 1/4 * RTAURUR q,r,p * (RTSPP p,i - RTRSVPOR)

PUBLIC NPRR689 – 2/10/2016 production release (R1) 5 QSE share of total costs: Step 1: WAURUTOT = RTAURUR q,r,p Step 2: ARUO q = WAURUTOT * HLRS q + RUO q Step 3: ARUQ q = ARUO q – SARUQ q Step 4: ARUQTOT= ARUQ q Step 5: ARUPR = ARUCOSTTOT / ARUQTOT Step 6: ARUCOST q = ARUPR * ARUQ q QSE incremental costs: NETARTRUAMT q = ARUCOST q - RUCOST q Total Costs during a Watch: ARUCOSTTOT = (-1) * RTAURUAMTTOT + RUCOSTTOT Where: RTAURUAMTTOT = RTAURAMT q,r,p Payment for Un-deployed Assigned AS: RTAURUAMT q,r,p,i = (-1) * 1/4 * RTAURUR q,r,p * (RTSPP p,i - RTRSVPOR) Total Reg-Up Costs Total Assignment payments converted to a cost QSE share of Watch Assignment and Reg-Up Obligation QSE total costs Assignment +Reg-Up Un-deployed Assigned MW S&B will work with Operations to determine the correct amount to consider during dispute resolution. PR (1) Isolated Assignment Costs

PUBLIC How do you know RUC hours have been successfully “bought-back”? NOW Settlement Eligibility process COP status and sets RUC interval value = 5 6 AFTER 744 MMS will determine if “buy back” is successful. CSI_S&B will transform MMS data into a flag where an interval value of 1 will indicate successful “buy back”. Settlement Eligibility process consumes MMS flag and sets RUC interval value = 5 where MMS flag interval value = 1

PUBLIC NPRR746- Adjustments Due to Negative Load What’s changing? RTAMLTOT = (max(0, RTAML q,p )) LRS q = (max(0, RTAML q,p )) / RTAMLTOT HRTAMLTOT = (max(0, RTAML q,p )) HLRS q = (max(0, RTAML q,p ))/(HRTAMLTOT) URTAML = max(0, (RTAML mp,p,i )) ESACAMT q = LAFF * max(0, RTAML q,p ) ERSLRS qc(tp) - “…If the resultant QSE-level share is negative, the QSE’s share will be set to zero and all other QSE shares will be adjusted on a pro rata basis such that the sum of all shares is equal to one.” 7

PUBLIC NPRR746- Adjustments Due to Negative Load 8 What’s not? RTAML- Real-Time Adjusted Metered Load per QSE per Settlement Point RUCSFSNAP ruc,q,i = Max (0, (( RTAML q,p,i * 4) + RTDCEXP q, p, i – RUCCAPSNAP ruc,q,i )) RUCSFADJ ruc,q,i = Max (0, (( RTAML q,p,i ) *4) + RTDCEXP q, p, i – ( r=WGRsOnly HASLSNAP ruc, q, r, h + RUCCAPADJ q,i )) RTEIAMT q, p = (-1) * {[RTSPP p * [(SSSK q, p * ¼) + (DAEP q, p * ¼) + (RTQQEP q, p * ¼) – (SSSR q, p * ¼) – (DAES q, p * ¼) – (RTQQES q, p * ¼)]] + [RTSPPEW p * (RTMGNM q, p – RTAML q, p )]} MLRS(Z) = LRS in the peak interval of the month. LRS will be adjusted to handle negative load. »Between 1/1/2012 and 1/21/2016, there was only one instance of MLRS being negative (JULY 2015). MLRSZ was negative twice (JUNE 2014 and JULY 2015). All negative values were seen from a single QSE. »June LACMRZAMT = $69.90 »July LACMRNZAMT = $21.49 ; LACMRZAMT = $59.43 ; LACRRAMT = $18.80 –

PUBLIC What’s on the horizon? 9 NPRRDescriptionReleaseTimeframeDiscussion NPRR419RTEI/RMR revisionsR2APR-2016MAR-2016 NPRR617Energy Offer FlexibilityR3JUN-2016MAY-2016 NPRR700Actual Fuel Costs in Start Up Offer Caps R3JUN-2016MAY-2016 NPRR662Proxy Energy Offer Curves R4AUG-2016JUL-2016 NPRR272Definition and Participation of QSGRs R6DEC-2016NOV-2016