Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.

Slides:



Advertisements
Similar presentations
CM-22 Magnet Issues, 6 June MICE Magnet Cool Down and Other Issues Michael A. Green Lawrence Berkeley Laboratory Berkeley CA
Advertisements

Spectrometer Solenoid Update Steve Virostek - LBNL MICE VC 150 August 23, 2012.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
MICE Coupling Coil Testing at Fermilab MICE Collaboration Meeting Ruben Carcagno March 15, R. Carcagno - MICE CC Testing at Fermilab3/15/2012.
1 Cooling the Hydrogen (Helium) Absorbers with Small Coolers Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Video.
Magnet Cooldown Scheme 17 th February 2012 Roy Preece (STFC RAL)
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
June 26, 2009TLH, NFMCC Friday Meeting1 MICE Updates MICE News Overview ISIS and MICE Schedules DAQ Review Spectrometer Update Aspirational Schedule Terry.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 114 September 18, 2008.
128 April 2008 Spectrometer Solenoid Fabrication Update MICO Meeting 19 May 2008 S. Virostek, M. Zisman LBNL.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Spectrometer Solenoid Report and Coupling Coil Update Michael S. Zisman MICE Operations Manager Center for Beam Physics Lawrence Berkeley National Laboratory.
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
Spectrometer Solenoid Testing Update S. Virostek and M. Zisman Lawrence Berkeley National Laboratory MICO Meeting—RAL May 17, 2010.
MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update S. Virostek and M. Green are visiting vendor today for progress update Vendor expects to complete.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #145 December 15, 2011.
Spectrometer Solenoid Lead Testing Update S. Virostek and Mike Zisman Lawrence Berkeley National Lab MICO Meeting January 19, 2010.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update Vendor still expecting to complete first magnet by the end of November, before X-mas more.
Spectrometer Solenoid Testing Update S. Virostek and M. Zisman Lawrence Berkeley National Laboratory MICO Meeting—RAL June 7, 2010.
Spectrometer Solenoid Tech Board Schedule Discussion
MICE Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #26 University of California.
MICE Magnets - Virostek 11 MICE Magnets Steve Virostek Engineering Division Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoid Update Steve Gourlay Steve Virostek Lawrence Berkeley National Lab Steve Gourlay Steve Virostek Lawrence Berkeley National Lab MICE.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
RF Cavity / Coupling Coil Module
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
Spectrometer Solenoid Fabrication & Testing Update S. Virostek and Mike Zisman Lawrence Berkeley National Lab NFMCC 2010 Collaboration Meeting University.
MICE Coupling Coil Update Steve Virostek for Allan DeMello Lawrence Berkeley National Laboratory MICO January 23, 2013 January 23, 2013.
Spectrometer Solenoid Test Plan Workshop: Spectrometer Solenoid Overview Steve Virostek - LBNL February 17, 2012.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
Spectrometer Solenoids MICO 197 Steve Virostek LBNL August 15, 2012.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #28 Sofia, Bulgaria.
Exhaust to atmosphere G1 V1 V2 V3 LN2 Storage Vessel 150 l Dewar Cryostat Exhaust to atmosphere Nitrogen or helium gas bottle LN2 Circuit for MIT Test,
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
Spectrometer Solenoid Design and Test Results Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Spectrometer Solenoid Background Info Steve Virostek Lawrence Berkeley National Lab MICE Spectrometer Solenoid Review: Phone Meeting October 5, 2009.
Spectrometer Solenoids MICO 194 Steve Virostek LBNL July 25, 2012.
Spectrometer Solenoid Prep Work at RAL and LBNL Steve Virostek Lawrence Berkeley National Lab Steve Virostek Lawrence Berkeley National Lab MICE VC May.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
Cooling Circuit Design Steve Virostek Lawrence Berkeley National Lab February 29, 2012 MICE Coupling Coil Cryostat Design Review Lawrence Berkeley National.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Spectrometer Solenoid Fabrication & Testing Update S. Virostek and M. Zisman Lawrence Berkeley National Laboratory MICE Funding Agency Committee Meeting—RAL.
Integration of the Spectrometer Solenoid Magnets
Spectrometer Solenoid Update
Spectrometer Solenoid Fabrication Status and Schedule
Small Coolers for MICE MICE Collaboration Meeting RAL Michael A. Green
Teleconference ACS – FREIA 20th February 2018
Presentation transcript:

Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009

2 Second magnet assembly including all fixes and modifications has been completed Second magnet had been cooled to 5K (cold mass) and transfer of LHe was under way An internal leak developed between the cryostat and the insulating vacuum (1 week ago) Magnet has been warmed up and leak checking is under way Leak is likely in either the cryostat fill or vent lines LN cooldown system developed at FNAL has been installed Temperature logging system developed at LBNL is working First magnet is completely disassembled and fixes are well under way in preparation for reassembly Additional cryostat penetrations and extra vent line added Modifications to vent line are nearly complete Summary

3 LN Cooldown of Magnet Cooler He lines Transfer line

4 LHe Transfer into Cold Mass Fill line turret Transfer line Vent line turret

5 Steps Leading up to Leak Magnet had been cooled to 5K (cold mass) and transfer of LHe was under way LHe dewar was changed, and no flow through the system could be attained Vendor suspected an ice blockage and attempted to thaw out fill line with heated helium gas Blockage remained, so vendor attempted to transfer LHe through the vent line containing an unprotected bellows An internal leak developed between the cryostat and the insulating vacuum causing the cold mass temperature to rise and the external vacuum vessel surfaces to frost Leak is likely in either the cryostat fill or vent lines A leak near or in the vent line bellows is the easiest repair

6 Possible Leak Locations Conflat seal Al/SS transition Weld joints Bellows

7 FNAL LN Cooldown Control System Heaters Thermocouple Control system chassis Flow control valve LN System was successfully operated during cooldown Modifications to control circuitry under way to optimize performance

8 Temperature Logging System in Use System now operating 16 channels being logged User can specify logging time increment

9 Temperature Logging System Screen Shot

10 First Magnet Cold Mass Modification

11 Power Supply Racks Two power supply racks have arrived from RAL Installation of power supplies and discharge circuits are under way Spec supplied by RAL dictates locations of components

12 Locate exact location of vacuum leak (today or tomorrow) Develop plan to make necessary repairs (depends on the accessibility of the leak location) Make the repair while maintaining the integrity of the magnet insulation (subject to review by LBNL) Initiate cool down of the magnet (~1.5 week process) Run the system at operating temperature for ~24 hours to ensure recondensing system is functional Power the magnet and train coils Warm up for shipping to FNAL Upcoming Tasks