GLAST LAT ProjectGSFC Monthly, 30 March 2006 LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering LAT Quality Assurance Pat Hascall.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectMonthly Review, Aug-1, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Advertisements

GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT Project Managers F2F Integration and Test 1 GLAST Large Area Telescope: Face to Face Managers Meeting LAT Integration & Test April.
GLAST LAT ProjectMonthly Status Meeting Jan 26, Project Status January 26, 2006 Gamma-ray Large Area Space Telescope Lowell A. Klaisner Project.
© 2007 General Dynamics. All rights reserved. Integrated Space Systems 1196 EB-R GLAST Pre-Ship Review (PSR) LAT Payload I&T Review CONTRACT NO.
GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 1/31 Overview of End to End Runs Eduardo do Couto e Silva April 1, 2005 ( not it is not a joke, we finally.
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 6.1 Ground Operations Software 1 Gamma-ray Large Area Space Telescope.
GLAST LAT Project June 6, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall.
GLAST LAT Project Aug 1, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
Tracker Subsystem1 GLAST LAT Project FM7/9 PSR, Sept. 9, 2005 GLAST LAT Tracker Tower7/9 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectMonthly Status Review – Sept. 1, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT Project4.1.7 G. Haller V21 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-to-Face Nov 04 Mike Huffer/Gunther.
GLAST LAT Project Oct 5, GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems Engineering.
A.Chekhtman1 GLAST LAT ProjectInstrument Analysis meeting, June, 24, 2005 CAL retriggering study with SLAC data. Alexandre Chekhtman NRL/GMU Gamma-ray.
GLAST LAT Project LAT Instrument Analysis Meeting – May 26, 2006 Hiro Tajima, TKR Efficiency Trending 1 GLAST Large Area Telescope: TKR Efficiency Trending.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
Tracker Subsystem1 GLAST LAT Project FM4/5 PSR, May 31, 2005 GLAST LAT Tracker Tower-4/5 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectGLAST Flight Software IDT, October 16, 2001 JJRussell1 October 16, 2001 What’s Covered Activity –Monitoring FSW defines this as activity.
GLAST LAT Project LAT System Engineering 1 NCR Status Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project Technical/Cost/Schedule Review 09/01/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review LAT Test Verification Process Presentation 4 of 12 GLAST Large Area Telescope Gamma-ray Large.
GLAST LAT ProjectF-to-F, June 15, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT Project Oct 5, GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems Engineering.
Tracker Subsystem1 GLAST LAT Project FM6 PSR, July 21, 2005 GLAST LAT Tracker Tower6 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Project May 2, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test L. Miller 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT ProjectPDU/GASU MRR, February 3, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, G. Haller SLAC xxxx LAT Quality Engineer
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Current Status Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST Large Area Telescope:
Tracker Subsystem1 GLAST LAT Project Production Readiness Review, 25 August, 2004 GLAST LAT Tracker TOWER-A PRR TKR Tower Electrical Test Plan Luca Latronico.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 1 GLAST Large Area Telescope: TKR Data Processing.
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST LAT Project Technical/Cost/Schedule Review 06/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
GLAST LAT ProjectMonthly Status Review – Nov 3, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT Project LAT Instrument Analysis Meeting – June 30, 2006 Hiro Tajima, TKR Efficiency Trending, NRL 1 GLAST Large Area Telescope: TKR.
GLAST LAT ProjectI&T Test Planning Telecon, 8 Nov 2004 CAL Test and Calibration DefinitionJ. Eric Grove GLAST LAT GLAST LAT Calorimeter Subsystem Gamma-ray.
GLAST LAT Project Instrument Analysis Meeting– Feb 28, 2006 Tsunefumi Mizuno TowerTrend_ ppt 1 Tracker Parameters Trending Monitor GLAST I and.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
Tower 8 – X6 anomaly MRB Meeting – 24 August 2005.
GLAST Large Area Telescope:
GLAST LAT System Engineering
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
NCRs and Waivers GLAST Large Area Telescope LAT Pre-Shipment Review
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST LAT System Engineering
GLAST LAT System Engineering
GLAST Large Area Telescope
GLAST Large Area Telescope: I&T Test Readiness Review
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectGSFC Monthly, 30 March 2006 LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering LAT Quality Assurance Pat Hascall Joe Cullinan Gamma-ray Large Area Space Telescope

GLAST LAT ProjectGSFC Monthly, 30 March 2006 LAT System Engineering 2 Topics NCR Metrics Significant NCRs NCR List LAT Level Verification Status LAT Power Update

GLAST LAT ProjectGSFC Monthly, 30 March 2006 LAT System Engineering 3 SubsystemOpen NCRs Closed NCRs last 30 days NCRs Open 30 days or more NCRs open 90 days or more NCRs ready to close (disposition complete; need final QA/MRB review to close) DAQ Tracker35333 Mechanical34322 CAL00000 ACD*0*0000 I&T * All NCRs related to ACD are now categorized as I&T NCRs (including 5 open ACD PRs and PFRs from GSFC) LAT NCR Metrics 3/28/06

GLAST LAT ProjectGSFC Monthly, 30 March 2006 LAT System Engineering 4 Open I&T NCR Metrics 3/28/06 Open I&T NCRs FebruaryMarch 6163 New NCRs created1422 NCRs closed320 NCRs Ready to Close (analysis complete, need final QA/MRB review to close) 2111 NCRs with Analysis in Progress 3646 NCRs to remain open to monitor trend or performance 46

GLAST LAT ProjectGSFC Monthly, 30 March 2006 LAT System Engineering 5 NCR 863 Anomaly Description –LCI script TkrNoiseAndGain causes the LAT to enter a state of continuous Busy. Livetime stops incrementing, and all TREQs are discarded. Investigation –Similar tests worked on LAT via LATTE –Preliminary investigation shows that a TEM is Busy, with corresponding TKR and CAL contributing to Busy. Monitoring of VSC FIFO flags shows no evidence that downstream backpressure is contributing to the Busy state –Determined that the data rate is too high coupled with a known timeout setting error (already a FSW JIRA) Resolution –Reduce the rate of data collection –Modify TEM settings during LCI runs to minimize/eliminate susceptibility to overrun

GLAST LAT ProjectGSFC Monthly, 30 March 2006 LAT System Engineering 6 NCR 855 Anomaly Description –Intermittent LATC verify errors, indicating that the registers are not set up properly Investigation –All instances have been readout controller (RC) registers –LATC verify report bug fixed to allow visibility into problem –Last 2 events provided some clues which are being investigated offline Resolution –Testing has been moved to the Dalek –LAT is being monitored with a plan to use LATTE to capture LAT state if the problem repeats

GLAST LAT ProjectGSFC Monthly, 30 March 2006 LAT System Engineering 7 NCR 684 Anomaly Description –Tracker modules have occasional out-of-spec noise occupancy in isolated layers (“noise flares”). Investigation –Analysis showed similar noise at INFN. –Occupancy still within spec. –Noise flares have been observed from 4 layers (out of 576 layers) during 21 hours of 16-tower muon data monitoring. Two of the layers are in flare states for 10-20% of time while the others are in flare states for 1-2% of time. –TKR meets data occupancy and trigger occupancy requirements even during flares. –No noise flares have been observed in review of 230 hours of online Tracker FM 8 data taking, a more detailed review of offline data is in process. Resolution Plan –Continue extended testing on Tracker module 8 to further characterize.

GLAST LAT ProjectGSFC Monthly, 30 March 2006 LAT System Engineering 8 Open I&T NCR List NCR Date Opened Affected HardwareProblem DescriptionStatus 4585/10/05TEM/TPSObserved GTCC and GTRC phasing errors within the TEMFinalMRB required 4775/23/05TEM/TPSTEM FIFO errors observed during FMA and FMBFinal MRB required 5296/16/05TKRTEM register test on PDU1 and GASU redundant failed,Twr 3Monitor 5326/16/05TEM/TPSTEM register test (Trigger Interface Controller) failed.Final MRB required 5356/20/05TKRMonitor trend data for TKR 4 thru LAT testing (spin-off NCR)Monitor 5496/27/05TKRTemperature alarm and setpoints, Bay 1Final MRB required 6048/11/05TKRBay 4 TkrReadingConfigurationTest failure on x0, FE0QA to close 6248/27/05ACDFluctuations in temperature reading (originally an ACD PR)Monitor 6258/27/05ACDAcdVetoHitmapPha failed (originally an ACD PR)Monitor 6268/27/05ACDACDMonitor script high counts during T/V (originally ACD PR)Monitor 6489/13/05ACDI&T ACD Receiving Test - AcdGafeNoise failureDisposition Required 68410/3/05TKRNoise Occupancy failures due to intermittent hot strips.Disposition Required 68510/3/05ACDHldCal runs had excessive counts for GARC11, GAFE13Disposition required 69010/6/05PDUNCR to trend LPT failures observed in box level NCR #00631.Disposition Required 71810/27/05ACD VETO threshold for channel 1123 can't be set below minimum value of 0.45pC (originally an ACD PR)Monitor 74111/11/05IntegrationHIB Cables to short or wrong orientation.QA to Close

GLAST LAT ProjectGSFC Monthly, 30 March 2006 LAT System Engineering 9 Open I&T NCR List NCR Date Opened Affected HardwareProblem DescriptionStatus 74311/13/05IntegrationEMI shield mechanical tolerances not met.QA to Close 74411/13/05IntegrationX-LAT plate mechanical hole tolerances not met.Disposition required 76512/5/05IntegrationX-LAT Heat pipe shims bonding fixture cannot be removed.MRB Required 77412/8/05IntegrationCannot mate harness LAT-DS MRB Required 77712/13/05IntegrationDAQ-ACD Internal RF shield to GASU cable rework.MRB Required 78812/21/05GASUGASU AEM temperature alarmMRB Required 78912/21/05TKRTKR test software isn't reading in bad channel listsDisposition Required 79112/22/05ACDACD CPT script turns off/on all TEMs simultaneouslyDisposition Required 79312/28/05ACDGARC digital 3.3V current is slightly below allowed rangeDisposition Required 79512/30/05ACDACD TciRegRange test gives bad linearity fitsDisposition Required 79612/30/05ACD ACD TciHighRange test GARC 0 GAFE 11 Upper Gain slightly below limit.Disposition Required 7991/5/06DAQTKR Analog voltage overshoot during power on sequenceQA to Close 8051/16/06MechanicalMapping problem wit hgrid temperature points 2,3 vs. 4,5Disposition required 8061/17/06TriggerCAL is retriggering during SVAC runDisposition required 8081/17/06IntegrationHarness connector backshell is loose (not properly torqued)QA to Close 8111/23/06Integration1553 cables rejected for workmanshipMRB Required

GLAST LAT ProjectGSFC Monthly, 30 March 2006 LAT System Engineering 10 Open I&T NCR List NCR Date Opened Affected HardwareProblem DescriptionStatus 8232/6/2006ACDFREE Board 0 failed to initialize during PowerOn using FSWQA to Close 8242/6/2006IntegrationVSC required reboot by resetting SBCDisposition required 8272/9/2006MechanicalInsufficient screw thread engagementDisposition Required 8292/10/2006ACD ACD coherent noise at 1000 system clock ticks after each event collected in flight config.Disposition Required 8302/10/2006Integration EPU J5, J8 connectors interfere with HIB connectors J5, J6 in Bays 00 and 12Disposition Required 8322/16/2006TKR Calibration DAC correction factor did not work as expected on TkrThresholdCal.pyMRB Required 8332/17/2006DAQ SIU/EPU crates to be removed from LAT for RAD750 EEPROM bonding inspectionMRB Required 8342/23/2006MechanicalAccel mount bracket interferes with EPU screwsDisposition Required 8362/27/2006Mechanical MLI bar bracket does not mount flush, has insufficient thread engagementDisposition Required 8382/28/2006DAQ Spare HCB had moisture condensation occur after T/V chamber was openedDisposition Required 8393/6/06IntegrationUpper cable trays misoriented 90 deg. on +X and -X sidesDisposition Required 8403/8/06DAQ RunControl software problems observed on spare PDU during T/V test (NCR #794); opened NCR to track FSW updatesDisposition required 8413/8/06MechanicalNeed to perform HiPot test on radiator heatersDisposition required 8423/9/06IntegrationVelcro outgassing properties to be verified at GSFCDisposition required

GLAST LAT ProjectGSFC Monthly, 30 March 2006 LAT System Engineering 11 Open I&T NCR List NCR Date Opened Affected HardwareProblem DescriptionStatus 8433/9/06DAQDesign change to DAQ-ACD Internal cableDisposition required 8443/16/06FSWSIU included in round-robin scheduling for eventsDisposition required 8453/16/06FSWTEM register set to incorrect values;TCC event timeout was 0Disposition required 8463/16/06FSW When LPA sets EBM destination, other fields in register are also changedDisposition required 8473/16/06FSW Incorrect TEM config register resulted in incorrect bit positions of redundant GEM/EBMDisposition required 8483/16/06FSWLPA returns a success when LATC verify failsDisposition required 8493/16/06FSWLATC output of problem report is unavailableDisposition required 8503/16/06FSWLATC XML parser created files with occasional errorsDisposition required 8513/16/06DAQ One or more EPU resets unexpectedly due to large number of events and interaction with end of run activitiesDisposition required 8523/16/06DAQLCB errors observed during muon runDisposition required 8543/23/06FSWDigi report occasionally shows ACD header parity non-zeroDisposition required 8553/23/06FSWLATC verify occcasionally reports errors in CRC, SPT, ARCDisposition required 8563/23/06FSW LATC verify error at CRC occurs at first LPA run after power upDisposition required 8573/23/06FSWTKR LCI datataken with pedestal strip are corruptDisposition required

GLAST LAT ProjectGSFC Monthly, 30 March 2006 LAT System Engineering 12 Open I&T NCR List NCR Date Opened Affected HardwareProblem DescriptionStatus 8583/23/06FSWDatagram overflow in some CAL and TKR LCI scriptsDisposition required 8593/23/06FSW CAL LCI data compression less than expected, results in very large datagramsDisposition required 8603/23/06FSWBias iteration in ACD not working properlyDisposition required 8613/28/06DAQRF shield to SIU cables need serial numbersQA to close 8623/28/06FSWLCI for lehebiascal does not iterate for bias_dacNew 8633/29/06FSW LCI script TkrNoiseAndGain causes TEM to enter a state of continuous BusyNew 8643/28/06FSWPower off runs to had issuesNew 8653/28/06FSWStrange packets in run New Not on summary list

GLAST LAT ProjectGSFC Monthly, 30 March 2006 LAT System Engineering 13 LAT Level Verification Status Progress this month –Review of ~25% of 456 VPs in progress, all others Final 321 Level 2a/2b VPs and 123 Level 3 VPs 144 more VPs now final, remaining VPs in review by requirement owners –VP review by Requirement/Verification Plan owner ~75% complete All received reqt owner comments have been have been incorporated –VPs continue to iterate based on test case design & owner comments Status –VCRM version 15 released –Updated version of the in review Reqt issues identified by reqt owner and test case development are being incorporated in this version as they are discovered

GLAST LAT ProjectGSFC Monthly, 30 March 2006 LAT System Engineering 14 Mass and Power Status Summary Mass –No Change Power –LAT Power Consumption Estimate has decreased by 12.8 W Primarily due to measured GASU data A margin of 16.9% exists to LAT Power Allocation with 96% of the Estimated Power measured.

GLAST LAT ProjectGSFC Monthly, 30 March 2006 LAT System Engineering 15 LAT Power Status ACD Estimate no change. TKR Estimate no change. CAL Estimate no change. T&DF Estimate decrease by 12.9 W due to GASU measured data. LAT Power Consumption Estimate has decreased by 12.9W.