Case Study 1: Thirty Seven Acre Reservoir Project Paul Keiran – R1 Course Overview Introduction and Inspector Qualifications Pre-Inspection Preparation.

Slides:



Advertisements
Similar presentations
Presentation by: LT Environmental, Inc.. Why Stormwater Matters Water is a precious resource that must be protected. Flood-defensive measures will protect.
Advertisements

CDOT WATER QUALITY PROGRAM
Post-construction rates and volume of stormwater runoff on-site will be equal to or less than that of pre-development rates and volume of stormwater runoff?
1 Overview of Regulations for Water Quality Protection in South Carolina n Federal Clean Water Act/ NPDES Storm Water Program n South Carolina Pollution.
EPA CONSTRUCTION & DEVELOPMENT EFFLUENT LIMITATIONS GUIDELINES Tim Ryan, P.E. Water Resources Engineer Water Resources Engineer Wisconsin Department of.
A State’s Perspective of the EPA’s Effluent Limitations Guidelines 40 CFR Part 450 Jeffrey B. Shaver, PE, CPESC AASHTO Subcommittee On Design July 27,
ALABAMA STORMWATER The Problem and How ALDOT Has Corrected It.
PENNSYLVANIA CODE Title 25.Environmental Protection Chapter 102 Erosion and Sediment Control Clean Streams Law-Act 394 of To preserve and improve.
Stormwater 101: How to stay out of trouble with TDEC.
Farming techniques to help reduce soil erosion
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Modifications to the Storm Water Ordinance The City Municipal Separate Storm Sewer System (MS4) drains rainwater and all runoff into natural streams. EPA’s.
Erosion. What is it?  Movement of soil materials by the action of water, wind or gravity.
Field Application Training for Erosion and Sediment Control BMPs on Caltrans Construction Sites.
Construction Storm Water Controls CET-3320 Hydrology & Hydraulics.
Env 247 Overview of Stormwater Management March 1, 2011.
Draft Phase II Small MS4 General Permit Water Quality Monitoring & Assessment Jonathan Bishop Chief Deputy Director Director State Water Resources Control.
Overview of RIPDES Construction General Permit Requirements Developed by: Greg Goblick, Laura Stephenson RI Department of Environmental Management RIPDES.
Vegetation Establishment. Exposed soil occurs on all construction sites.
Applying for the VT Multi-Sector General Permit
Storm Water Discharges from Oil and Gas Related Construction Activities EPA Public Meeting Dallas, Texas May 10, 2005.
Erosion Control on Construction Sites David Athey, PE Deputy Public Works Director, Engineering City of Atascadero.
Office of Sustainability Presented by Sofia Habity EROSION AND SEDIMENTATION CONTROL.
BUILDING YOUR RAIN GARDEN. Garden Location Where does water flow from? Where does water travel or collect? Observe your yard during a rainfall event.
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
Module V Final Wrap-Up ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control (SC) III Tracking, Wind Erosion, and Construction.
New Ag Waiver for the San Diego Region (including Temecula Valley) Water Quality Workshop Rancho California Water District November 6, 2008 Presented by.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
Module 7: Construction Phase
Introduction to Construction General Permit Inspections.
Municipal Regional Permit Provision C.6 Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Introduction to Construction General Permit Inspections Pre-Inspection Preparation.
Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
REGULATORY REQUIREMENTS FOR STORMWATER MANAGEMENT Coastal Stormwater Supplement Training.
Construction Stormwater Rules-2012 Rodney Hendrick, Ph. D. Louisiana Urban Stormwater Coalition.
Stormwater Control & Design
Erosion & Sediment Control. Wind Erosion Water Erosion.
Overview of Montana’s Stormwater Regulatory Program.
Construction & Post-Construction Stormwater Ordinance City of Wenatchee, Public Works Department Jessica Shaw, Environmental Manager.
Created by The North Carolina School of Science and Math.The North Carolina School of Science and Math Copyright North Carolina Department of Public.
1 Three Rivers Levee Improvement Authority Follow-up on Twelve Compliance Issues Raised on February 26, 2007 March 22, 2007.
Urban Programs. Urban Programs - ESC Virginia Erosion and Sediment Control (ESC) Law –Approved in –Title 10 of the Code of Virginia. “Each District.
Natural vs. Accelerated Soil Erosion Natural geologic erosion has occurred at a relatively slow rate since the earth was formed. Natural erosion produces.
Phase II National Storm Water Regulations What’s in it for you?
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
New Stormwater NPDES Construction General Permit Effective August 3, 2011 New Stormwater NPDES Construction General Permit Effective August 3, 2011 Samir.
Sediment Delivery to the Watonwan River
What is Erosion and Sedimentation ? Bill Laflamme CPESC, Office of the Commissioner MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION Protecting Maine’s Air,
San Rafael, California November 12, 2015
Nonfarm Erosion Control
Basic Hydrology & Hydraulics: DES 601
Bud Amorfini – R6SLT Paul Keiran – R1 Compliance Inspection Reports and Data Reporting Course Overview Introduction and Inspector Qualifications Pre-Inspection.
Water Erosion Chapter 3 Section 2. Standard S 6.2.a – Students know water running downhill is the dominant process in shaping the landscape S 6.2.a.
Prevention not Intervention Developing a Sound Response to Erosion and Sediment Control Problems through the Planning Process.
Storm Water Pollution Prevention Plan Development Todd E. Hubmer PE WSB &
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Let’s Begin! Writing Manure Management Plans!. Manure Management Manual DEP Manure Management Manual can be divided into 3 Parts: Part I Requirements/Guidelines.
Pollution Control: For Field Office Construction Sites.
Soil Erosion. Objective 1: Explain soil erosion.  What is soil erosion?  I. Soil erosion is the process by which soil is moved.  As soil is eroded,
Expectations for Construction Activities The City of Hendersonville Department of Public Works Erosion Control Inspection Review Process Power Point Presentation.
Supervisor, RIDEM RIPDES Permitting Program
Inspector Challenges.
Storm Water Pollution Prevention Plan Development
Waters of the United States and Other Wetlands
Soil Conservation.
INDOT Storm Water Management
InstaTurf Project Spotlight
Presentation transcript:

Case Study 1: Thirty Seven Acre Reservoir Project Paul Keiran – R1 Course Overview Introduction and Inspector Qualifications Pre-Inspection Preparation Construction Site Compliance Evaluation Field Monitoring at Construction Sites Compliance Inspection Reports Compliance Inspection Data Management Compliance Enforcement Activities Case Study

Thirty Seven Acre Reservoir Project Began construction in summer of 2000 Work ended in 2002 Involved complicated fill slopes Involved significant storm water runoff We all learned some significant lessons about what to use and when to use it Case Study 1: Thirty Seven Acre Reservoir Project

Regulatory Realities Owner obtained appropriate storm water permit September 2000 storm event produced a warning about the need for significantly increase Erosion and Sediment Control (ESC) efforts The following two months revealed minimal ESC efforts Subsequent winter rains then created havoc Case Study 1: Thirty Seven Acre Reservoir Project

Something Must Be Done Let’s Put Jute (Burlap) Matting On the Slopes Case Study 1: Thirty Seven Acre Reservoir Project

Never Put Matting On Deeply Rutted Slopes Runoff will find those gullies and continue to erode the soil Slopes must be smooth prior to applying matting Obviously re-grading was not going to occur in January Case Study 1: Thirty Seven Acre Reservoir Project

Rainy Season #2 Let’s Try Hydroseeding Those Hills Case Study 1: Thirty Seven Acre Reservoir Project

Don’t Use Hydroseed Alone on Long Steep Slopes! It’s Risky! Must be used in conjunction with other BMPs What BMPs work best with hydroseed on steep slopes? Case Study 1: Thirty Seven Acre Reservoir Project

July 2001 ACLC $60K (6 days of observed discharge violations, no estimate of volume discharged) Discharger wished to perform supplemental environmental project (SEP) in lieu of a portion of the fine May ACLC re-issued with SEP language Fines bumped to $70K due to another observed discharge Case Study 1: Thirty Seven Acre Reservoir Project

Late Spring 2002 Everyone Gets Religion Case Study 1: Thirty Seven Acre Reservoir Project

High Flow Drainage Ditches Cannot be left unprotected Cannot be controlled with haybales Must be armored before the start of the rainy season Should be a top construction priority Case Study 1: Thirty Seven Acre Reservoir Project

What Lessons are to be Learned Regarding this Site? Owner employed all the right controls for a steep sloped fill site —Matting —Wattles —Hydroseed Unfortunately they were all employed at different times! Using all three methods together, at the beginning of the first rainy season, may well have prevented, or at least greatly minimized, the mental anguish, money, environmental damage and frustration that this site brought Case Study 1: Thirty Seven Acre Reservoir Project