Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.

Slides:



Advertisements
Similar presentations
The Optimus Signature Boutique Offices, India AE Senior Thesis 2013 Punit G. Das | Structural Option Faculty Advisor: Dr. Linda Hanagan.
Advertisements

Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
Pennsylvania College Of Technology Dauphin Hall Williamsport, Pennsylvania Aubert Ndjolba Structural Option AE Senior Thesis Thesis Advisor: Dr.
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
Daniel Bellay Lancaster County Bible Church Structural Option Lancaster County Bible Church.
3711 Market Street 3711 Market Street Philadelphia, PA Zachary Yarnall l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Professor.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
LOCKWOOD PLACE BALTIMORE, MARYLAND Monica Steckroth- Structural Option.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
UNC Imaging Research Building UNC Imaging Research Building Chapel Hill, NC Daniel R. Hesington, LEED AP l Structural Option AE Senior Thesis l Spring.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Senior Thesis Structural Option Ryan Friis Spring Morgan St. Chicago, IL 111 Morgan St. Chicago, IL Ryan Friis Structural Option.
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Structural System Redesign Existing Conditions Proposal Gravity Design Lateral Design Cost Comparison Schedule Impact Conclusions.
Final Thesis Presentation Washingtonian Center Lee ResslerApril 15, 2008 Faculty Advisor: Dr. Memari.
Duquesne University Forbes Expansion
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.
300 North La Salle Liam McNamara BAE / MAE Senior Thesis April 13 th, 2010.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Dan Donecker BAE/MAE – Structural Option Senior Thesis Project 35 West 21 st Street New York, New York.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Whiteland Village Mary Longenecker Structural Option Senior Thesis August 7, 2007.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Senior Thesis 2006 The Pennsylvania State University
Rensselaer, NY Meral Kanik Structural Option Advisor: A.M. Memari April 14, 2008.
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
T IMOTHY H P ARK – S TRUCTURAL O PTION. Building Summary Current Systems Proposal Description Gravity Lateral Other Structural Factors Breadth Options.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Jon Hill – Structural OptionSpring 2005 Senior Thesis Structural Analysis and Redesign of Lynde and Harry Bradley School of Technology & Trade Milwaukee,
Justin Purcell Structural Option Advisor: Dr. Hanagan.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
Computer Associates International, Regional Office
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
 Building Background  Building Structural System  Problem Statement  Proposed Solution  Structural Investigations  Architectural Impact  Sustainability.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
Nijad Rudy Boukhalil structural option spring’05.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
Adam Kaczmarek Structural Option Spring 2011, Hanagan Cambria Suites CONSOL Energy Center Pittsburgh, PA Cambria Suites Hotel Pittsburgh, PA Adam.
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
Arlington Gateway Hotel 801 North Glebe Road Arlington, Virginia Michael Gray Penn State University AE Senior Thesis Presentation 2005.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
Hunter Woron Spring 2012 Structural Professor Parfitt.
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
Mountain State Blue Cross Blue Shield Headquarters
Pearl Condominiums Philadelphia, PA
Advisor: Professor M. Kevin Parfitt
Introduction James W. & Frances G. McGlothlin Medical Education Center
Outline Introduction Structural Redesign Gravity System
Ryan Johnson - Structural Option
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
North Shore at Canton The Pennsylvania State University
Mitre III Building McLean VA Debra Schroeder Structural Option.
Presentation transcript:

Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona

Presentation Outline Building Background Schedule Comparison Cost Analysis Structural Design Proposal Existing Structural System Conclusion Acknowledgements & Questions

Design Professionals Owner: Northern Arizona University Architect: Carter Burgess Inc. Structural Engineer: Caruso Turley Scott Inc. M/E/P Engineer: ARUP General Contractor: Ryan Companies Civil Engineer:Carter Burgess Inc.

Building Background 110,000 Sq. ft., 5 Story University Building Completed January 2006 Estimated Overall Project Cost: $24 Million LEED Certified – Sustainability Measurement Signature Building for NAU

Building Description Building Features 14 Classrooms 56 Faculty Offices 200 Seat Auditorium 5 Computer Labs Café with outdoor plaza Student lounges Career Exploration Office

Presentation Outline Building Background Schedule Comparison Cost Analysis Structural Design Proposal Existing Structural System Conclusion Acknowledgements & Questions

Structural System Overview Superstructure:Precast Concrete Floor Framing:Hollow-Core Plank Foundation:Deep – Caissons Shallow – Grade Beams Lateral System:Moment Frames Braced Frames Shear Walls

Floor Framing 10” Hollow-Core Plank – span 36 ft. 3” Cast-in-place concrete topping Inverted T-Beams – 34” x 27” most common – span up to 38 ft psi Concrete Plank and Beams 3” Topping 10” Hollow-Core Plank Inverted T-Beam

Vertical Framing Caissons with 2’-0” Minimum Penetration into Bedrock Sizes: from 2’-6” to 7’-0” Diameter All Columns are 24” Square

Typical Floor Plan 4’ wide, 10” deep Plank 24” Square Column Inverted T-Beam N

Lateral System Combination of: 1.Concrete Moment Frames 2.Concrete Shear walls 3.Concrete Frames w/ Steel Braces

Lateral System Layout Blue = Moment Frame Red = Shear Wall Green = Braced Frame N

Presentation Outline Building Background Schedule Comparison Cost Analysis Structural Design Proposal Existing Structural System Conclusion Acknowledgements & Questions

Problem Statement Complicated Lateral System Combination of Braced frames, Moment frames, and Shear Walls Seismic Loads control design – Lower Weight = Lower Loads A lot of Moment Connections Efficiency of System Is there a system which is Cheaper? Faster to Construct? Weight of Existing System is high High Loads & Longer Spans

Solution Method Design Gravity System using Steel Members Develop new Seismic Loads using ASCE 7-02 Design Lateral System using Braced Frames Compare Construction Time of redesign to Existing System Compare Cost of redesign to Existing System

Presentation Outline Building Background Schedule Comparison Cost Analysis Structural Design Proposal Existing Structural System Conclusion Acknowledgements & Questions

Structural Design Design Criteria: Design Loads: Dead Loads Slab on Deck68 psf Steel Framing 8 psf Other14 psf Total 90 psf Live Loads All Floors 100 psf IBC 2003 LRFD 3 rd Edition ASCE 7-02

Gravity System Typical Floor Plan 1-½” Composite Steel Deck + 4” Concrete Slab Beams 9’-0” O.C., Spans – 11’ to 38’ Beam Sizes: W8X10 to W16X31 Girders E-W direction, span 36’ Girder Sizes: W16X31 to W21X62 N

RAM Model

Lateral System Steel Braced Frames No Moment Connections Required Building weighs less so lower Seismic Loads Limit Story Drift to L/600

Plan with frames East-West Direction – 3 Frames North-South Direction – 4 Frames Torsion effects minimal due to layout N

East-West Frame All Braces W 10 X 77 Lower Columns W 12 X 96 Upper Columns W 12 X 87 W 21 X 62 W 18 X 60 W 18 X 40

North-South Frame All Braces W 10 X 77 Lower Columns W 12 X 96 Upper Columns W 12 X 87 W 21 X 48 W 216X 26

Presentation Outline Building Background Schedule Comparison Cost Analysis Structural Design Proposal Existing Structural System Conclusion Acknowledgements & Questions

Cost Analysis

Presentation Outline Building Background Schedule Comparison Cost Analysis Structural Design Proposal Existing Structural System Conclusion Acknowledgements & Questions

Schedule Comparison

Presentation Outline Building Background Schedule Analysis Cost Analysis Structural Design Proposal Existing Structural System Conclusion Acknowledgements & Questions

Conclusions Based on Analysis, the Proposed Steel framing effectively carries Gravity Loads Proposed Steel Lateral System limits story drift to less than L/600. The Cost Analysis showed the Proposed system to cost about 8% less than the Existing System. A Comparison of construction times, showed the Proposed system would take 2 weeks longer to construct. The Proposed Steel System is comparable to the Existing Precast System.

Acknowledgements AE Faculty and Staff My thesis Advisor, Professor Parfitt Dave Melfi & Chris Glinski Mary Reik - NAU Craig Porter – Caruso Turley Scott, Inc. My Family and Friends THANK YOU!

QUESTIONS?