Ninth Synthesis Imaging Summer School Socorro, June 15-22, 2004 Proposal Writing Joan Wrobel.

Slides:



Advertisements
Similar presentations
Preparing a Competitive Radio Proposal Ed Fomalont NRAO Charlottesville, VA.
Advertisements

Proposing for VLA and VLBA Time Lorant Sjouwerman National Radio Astronomy Observatory, Socorro NM.
Line Efficiency     Percentage Month Today’s Date
WW 2 History Club 7 April Meeting Agenda 1.Club organization discussion 2.Germany’s advance through Europe from Poland to the fall of Crete  Covers.
HOW TO MAKE A CLIMATE GRAPH CLIMATE GRAPHING ASSIGNMENT PT.2.
NRAO Proposal Tool (PST) Gustaaf van Moorsel NRAO Community Day 1/13/2012.
Users' Committee, 25 Oct 2010 Chandra Director’s Office Cycle 12 Peer Review  June 2010, Hilton, Logan Airport  No major changes in Cycle 12 
Your Presentations Fall 2005 Software Engineering Computer Science and Engineering Qatar University.
Array Design David Woody Owens Valley Radio Observatory presented at NRAO summer school 2002.
J.M. Wrobel - 25 June 2002 PROPOSALS 1 PROPOSAL WRITING TUTORIAL Outline 30 minutes: Lecture on Generic Issues 60 minutes: Small Groups Write Proposals.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
ALMA Proposal Preparation and Submission Liz Humphreys European ALMA Regional Centre ESO, Garching Thanks to Andy Biggs, Paola Andreani, Eelco van Kampen.
National Radio Astronomy Observatory May 17, 2006 – Legacy Projects Workshop VLA/VLBA Large Projects Jim Ulvestad Assistant Director, NRAO.
EVLA Early Science: Shared Risk Observing EVLA Advisory Committee Meeting, March 19-20, 2009 Claire Chandler Deputy AD for Science, NM Ops.
November 2009, Lunch talk The most compact E configuration for the EVLA. L. Kogan, G. Stanzione, J. Ott, F. Owen National Radio Astronomy Observatory Socorro,
Ninth Synthesis Imaging Summer School Socorro, June 15-22, 2004 Sensitivity Joan Wrobel.
IEEE /r3 Submission September 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
Designing Experiments T. Venturi Istituto di Radioastronomia, Bologna, INAF ERIS, Manchester, 9 September 2005.
EVLA Software Bryan Butler. 2007May22EVLA SAGE Meeting2 Requirements and Goals of EVLA Software Maximize scientific throughput of the instrument At a.
Radio Interferometers’ Data Archives how to find, retrieve, and image radio data: a lay-person’s primer Michael P Rupen (NRAO)
SAGE meeting Socorro, May 22-23, 2007 EVLA Science Operations: the Array Science Center Claire Chandler NRAO/Socorro.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Observing with NRAO.
Tenth Summer Synthesis Imaging Workshop University of New Mexico, June 13-20, 2006 Proposal Writing Joan Wrobel.
An Early Release Science Program Janice C. Lee STScI Science Mission Office JWST Science Working Group Meeting 29 April 2015.
Doc.: IEEE /1394r0 Submission November 2008 Jose Puthenkulam (Intel)Slide 1 Summary of m Development Process Date: Authors:
Twelfth Synthesis Imaging Workshop 2010 June 8-15 Proposal Writing and PST Demo Joan Wrobel, EVLA Scheduling Officer.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing End-to-end (E2e) software.
Eleventh Synthesis Imaging Workshop Socorro, June 10-17, 2008 Proposal Writing Joan Wrobel.
Atacama Large Millimeter/submillimeter Array Karl G. Jansky Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Short Spacing.
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
FY17 Flying Plan Training for Wing and Region Staff Officers Colonel Carlton Sumner HQ CAP/DOT Civil Air Patrol CITIZENS SERVING COMMUNITIES.
Jan 2016 Solar Lunar Data.
Olathe South ACT Timeline

Q1 Jan Feb Mar ENTER TEXT HERE Notes
Project timeline # 3 Step # 3 is about x, y and z # 2
Average Monthly Temperature and Rainfall
Science Policies and Timeline

Shared Risk Observing Claire Chandler EVLA SSS Review, June 5, 2009

VLA to EVLA Transition Plan

Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE



Observatory Science Operations
IEEE IMT-Advanced Review Process
Work plan and next steps – RDE-LDV working group
IEEE IMT-Advanced Review Process
Observatory Science Operations
IEEE IMT-Advanced Review Process
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Project timeline # 3 Step # 3 is about x, y and z # 2

Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Proposed core price & service spec L1 product milestone 31 Dec 2019
Presentation transcript:

Ninth Synthesis Imaging Summer School Socorro, June 15-22, 2004 Proposal Writing Joan Wrobel

2 Ninth Synthesis Imaging Summer School, Socorro, June 15-22, 2004 Outline 30 minutes: Lecture –Generic –VLA and VLBA 60 minutes: Practical –Small groups write proposals –Group selects either VLA or VLBA case –Textbook, Observational Status Summaries provided –Scientific justification, target list provided –Group completes proposal, compares with “real” one

3 Ninth Synthesis Imaging Summer School, Socorro, June 15-22, 2004 Generic Start with nifty scientific idea, target list Specify required … –Angular resolution –Largest angular scale –Observing frequency –Observing bandwidth –Stokes parameters Select trial array Arp220 FOV 6’x6’ HI plus optical Image courtesy of NRAO/AUI and M. Yun & J. Hibbard

4 Ninth Synthesis Imaging Summer School, Socorro, June 15-22, 2004 Generic Evaluate Trial Array - 1 Special needs Geometry –Target above elevation limits? –Snapshot or full u-v coverage? –Adequate range of angular scales? Interferometer sensitivity –Adequate signal-to-noise to self-calibrate target? Image sensitivity –Adequate signal-to-noise on target? –Compare to dynamic-range limitations

5 Ninth Synthesis Imaging Summer School, Socorro, June 15-22, 2004 Generic Evaluate Trial Array - 2 Adequate undistorted field of view? –Primary beam attenuation –Bandwidth smearing –Time-average smearing –Non-coplanar baselines Optimal timeframes? –Time of day –Season –Year If trial array … –Fails evaluation, pick another –Passes evaluation, write and submit observing proposal

6 Ninth Synthesis Imaging Summer School, Socorro, June 15-22, 2004 VLA and VLBA Regular Proposals - 1 Cover information –Go to –Download, fill in LaTex file Scientific justification, technical matters –Add up to 1000 words: be clear, specific, concise –Science: provide motivation, state goals (eg) –Technical: give observing strategies, consult archives (eg) Staff collaborator optional but welcomed –See Submission method – PostScript file to

7 Ninth Synthesis Imaging Summer School, Socorro, June 15-22, 2004 VLA and VLBA Regular Proposals - 2 Proposal handling steps –Received by for deadlines 1 Feb, 1 Jun, 1 Oct For trimesters T2, T3, T1 For VLA configurations (see latest NRAO Newsletter) –Classified by scientific categories –Distributed to category’s referees –Referees return grades, comments –Proposal Selection Committee receives grades, comments –Proposal Selection Committee meets early Apr, Aug, Dec –Results ed to proposers by 1 May, 1 Sep, 1 Jan Details at

8 Ninth Synthesis Imaging Summer School, Socorro, June 15-22, 2004 VLA and VLBA Regular Proposals - 3 Hints for students –Consider submitting proposal a trimester early Use referee feedback to prepare, submit improved proposal –Tell us your graduation year Helps us understand your time constraints –Tell us if proposed observations are for your thesis –Consider supplementing proposal with your dissertation plan See NRAO Newsletter of Oct 1999 Plea to graduating students –Please donate thesis copies to NRAO library –See NRAO Newsletter of Jul 2003

9 Ninth Synthesis Imaging Summer School, Socorro, June 15-22, 2004 VLA and VLBA Other Proposal Types and Routes NRAO Rapid Response Science –Exploratory: quick follow-up of recent discovery (eg) –Target of opportunity: unpredicted phenomenon (eg) –See NRAO Large Proposals –Requests more than about hours in total –See Joint Chandra/NRAO Proposals –Chandra and VLA/VLBA essential for science goals –See NRAO Newsletter of Oct 2003