SSC Support for Sim #3 Archived MOC Data Products, and distributed via web. –Level-0 telemetry files organized by year and month –SPICE orbit and attitude.

Slides:



Advertisements
Similar presentations
National History Day National website Class website National website Class website.
Advertisements

National History Day National website National website.
STEREO SPICE Tutorial It’s been the intention of the STEREO Science Center to make the use of SPICE kernels by the instrument teams as simple as possible.
Title: ICON L0 from MOC to SOC automation Author: MOC/SOC Resides: SOC Description: This is a script that copies the ICON L0 files from the MOC to the.
Navigation and Ancillary Information Facility NIF Motivation for Developing SPICE November 2014.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG #22 (via telecon)
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center Phase E Kickoff Meeting February 23, 2007.
RHESSI and OVSA Data Base Organization J. McTiernan OVSA expansion project kickoff meeting 25-Oct-2010.
GLAST LAT ProjectManager’s Face to Face - ISOC, 17 March GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Manager’s Face.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
IMPACT Report SSMO Receiving Review– January 23, 2007.
GLAST LAT ProjectISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.1 Requirements 1 Gamma-ray Large Area Space Telescope GLAST Large.
RFA 18 – Automation of Operations Software Specific Request –Specify plans and requirements for automation of operations software, and describe the software.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 4.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 21 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
09 May 2014page 1 ROCC to PPL ICD Initial Definition ExoMars Rover Operations Control Center ROCC.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 SEP and LET GSE Software Presenter: Andrew Davis Contact:
XMM-Newton EPIC OCB, 6-Nov-2007 EPIC OCB, 6-Nov XMM-Newton Future Instrument Operations Mallorca, 6 th -7 th November 2007 M. Casale, J.R. Muñoz.
March 2004 At A Glance ITOS is a highly configurable low-cost control and monitoring system. Benefits Extreme low cost Database driven - ITOS software.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Pre-Environmental Review May , 2012 Flight Software Peter R. Harvey Mars Atmosphere and Volatile.
STEREO Science Center SWG – Dec 2004 William Thompson NASA Goddard SFC Code Greenbelt, MD
STEREO Science Center SWG – May 2005 William Thompson NASA Goddard SFC Code Greenbelt, MD
STEREO Science Center William Thompson NASA Goddard SFC Code Greenbelt, MD
MASSACHUSETTS INSTITUTE OF TECHNOLOGY NASA GODDARD SPACE FLIGHT CENTER ORBITAL SCIENCES CORPORATION NASA AMES RESEARCH CENTER SPACE TELESCOPE SCIENCE INSTITUTE.
Data Management Subsystem Jeff Valenti (STScI). DMS Context PRDS - Project Reference Database PPS - Proposal and Planning OSS - Operations Scripts FOS.
Aquarius Project Status 7 th Aquarius/SAC-D Science Team Meeting 11 April 2012.
STEREO - Solar Terrestrial Relations Observatory Mission STEREO STEREO Science Team Meeting May 2, 2005 Presented by Edward Reynolds APL STEREO Project.
SECCHI Consortium Meeting, July 2001 SECCHI Ground Data Systems and Data Processing Nathan Rich NRL/Interferometrics
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
PDS Geosciences Node Page 1 Archiving Mars Mission Data Sets with the Planetary Data System Report to MEPAG Edward A. Guinness Dept. of Earth and Planetary.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG April 2008 Meudon, France.
GLAST Science Support CenterAugust 9, 2004 Users’ Committee Meeting GSSC USER SUPPORT David Band – GSSC.
GLAST Science Support CenterNovember, 2005 GSSC User Committee Meeting Tools for Mission and Observation Planning Robin Corbet, GSSC
Swift HUG April Swift data archive Lorella Angelini HEASARC.
THEMIS PROJECT NAS UCB, June 2003 Science Operations Tim Quinn 4 June 2003.
22 March 2007 Science Simulator Overview and Status ICDS Susie Kennison.
GIST 19: GGSPS status Status of GGSPS development and operations Andy Smith GGSPS software project manager.
Control & Data Handling, Operator Control, Aircraft Interface to C&DH Steve Musko Space Physics Research Laboratory University of Michigan Ann Arbor, MI.
IMPACT Data Plans May 2006 Peter Schroeder UC-Berkeley
06-1L ASTRO-E2 ASTRO-E2 User Group - 14 February, 2005 Astro-E2 Archive Lorella Angelini/HEASARC.
William Thompson L-3 Communications NASA Goddard Space Flight Center STERE The STEREO Science Center.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG March 27-28, 2007.
1/15/02Bowman/Harch1 CONTOUR Science Ops Update Ann Harch Cornell University (607) Alice Bowman Applied Physics.
Sequencing The most simple type of program uses sequencing, a set of instructions carried out one after another. Start End Display “Computer” Display “Science”
Telemetry Constraints during Early Operations The STEREO telemetry rate is restricted during the phasing orbits due to S/C RF interference with each other,
1 November 17, 2009 Jim Russell - EOPM Review GATS AIM Data Accessibility John McNabb, AIM Project Data Center Manager Hampton University.
Michael L. Kaiser STEREO Project Scientist NASA/Goddard Space Flight Center STEREO May 2, 2008 STEREO at 1.25 years.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG November 2007 Pasadena, California.
SSC Data Access Plans All data will be available through web –Also setting up anonymous ftp site –SECCHI images will be password protected during embargo.
1 SUZAKU HUG 12-13April, 2006 Suzaku archive Lorella Angelini/HEASARC.
March 2004 At A Glance ITPS is a flexible and complete trending and plotting solution which provides user access to an entire mission full-resolution spacecraft.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
IMPACT Conjunction and Sidelobe Operations Janet Luhmann, Dave Curtis, Peter Schroeder, Dick Mewaldt and the IMPACT Team July 2, 2014.
EOVSA Data and Database System J. McTiernan EOVSA Technical DesignMeeting 7-Nov-2011.
STEREO Science Center SWG – November 2005 William Thompson NASA Goddard SFC Code Greenbelt, MD
SSC Preflight Status Tested during Sim #3: –Telemetry ingest –Beacon processing –Science planning –Archiving of MOC data products, including level-0 telemetry.
15th CAA Cross-calibration workshop CIS archiving activities report University College of London 2012, April
PLASTIC Post Launch Data Flow Lynn Kistler & Lorna Ellis May 2006.
Solar Probe Plus FIELDS MEP iPSR SOC Marc Pulupa April 10, 2017
I&T&C Organization Chart
Cluster Active Archive – Wideband data BM2 mode
SEP and LET GSE Software Presenter: Andrew Davis caltech
ECT data sharing plan Which products do you intend to make available for use by other teams in their data analysis? When will these products be available?
Soteria Capacity Building Workshop
GLAST Large Area Telescope
Launch and On-orbit Checkout
The STEREO Space Weather Broadcast
LAT Operations Scenario Subsystem Meetings
GLAST Large Area Telescope
Presentation transcript:

SSC Support for Sim #3 Archived MOC Data Products, and distributed via web. –Level-0 telemetry files organized by year and month –SPICE orbit and attitude files processed, organized, and put into SolarSoft Archived processed instrument data –Served on web as organized by instrument teams Processed beacon data and served on web –Produced plots and images on web in real-time Practiced science planning process –Served current plans, DSN schedule summary, and minutes from planning telecons

SSC Beacon Processing Beacon telemetry ingested from MOC –Setting filter parameters to “ALL” led to duplicated packets during DSN passes—affected SECCHI beacon processing –Have updated software to overcome this problem Beacon processing software delivered by instrument teams –Single IDL program processes IMPACT, PLASTIC, and SWAVES telemetry from both Ahead and Behind observatories –Separate multistep process for SECCHI images ITOS (C) program collects together packets forming an image IDL procedure with C subroutines decompresses telemetry and generates FITS files Separate processing strings for Ahead and Behind Web displays of data are generated by IDL programs in real time from processed data files Recordings of beacon telemetry during the simulation will be used to develop and test antenna partner software

SSC Beacon During Sim #3 Realtime beacon images and in-situ plots processed and on the web within seconds of telemetry receipt.

SSC Sim #3 Science Planning Practice of science planning process during Sim #3. Maintained online page of current science plans based on input from advanced planning, and weekly planning telecons. Generated minutes of weekly telecons, distributed, and put on web. Included replanning to meet changing instrument needs.

SSC Sim #3 Sample Science Plan

Telemetry and Attitude History Files Attitude history files produced for Sim #3 had gaps in them, with durations of several hours. Upon investigation, it turned out that S/C C&DH Level-0 telemetry files had the same gaps in them, at least for most APIDs. Have the instrument teams noticed any missing telemetry in the Level-0 files from Sim #3? –No several-hour gaps evident from looking at APIDs.

Sim #3 Discussion Items Realtime telemetry Level-0 telemetry files MOC data products –Mirroring by instrument teams SSC planning pages Fresh start of databases for launch