NCSX Interface Control Management Plan and Implementing Procedure 003 Peer Review December 19, 2002.

Slides:



Advertisements
Similar presentations
Software Quality Assurance Plan
Advertisements

TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
1 Software Requirement Analysis Deployment Package for the Basic Profile Version 0.1, January 11th 2008.
Elisati Hulu. Definition  “a deliverable-oriented hierarchical decomposition of the work to be executed by the project team to accomplish the project.
MARE 105 MOP Proposal Lecture. A proposal is a plan for a project. In science and industry, it generally is written in such a way as to convince an employer.
Verification “Auditability” Can Be “Free” James H. Jones Optants Documented Decision Support Company (ODDSCO)
Systems Engineering Management
Project Tracking and Scheduling Infsy 570 Dr. R. Ocker.
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
LSU 10/09/2007System Design1 Project Management Unit #2.
LSU 07/24/2004Defining Project Tasks1 Defining the Project Tasks Project Management Unit, Lecture 4.
Module 9 Session 9.2 Visual 1 Module 9 Designing Control and Reporting Systems (Time, Cost, Resources and Scope (Performance and Quality)) Session 9.2Managing.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
What is Business Analysis Planning & Monitoring?
Typical Software Documents with an emphasis on writing proposals.
Software Configuration Management
BSBPMG503A Manage Project Time Manage Project Time Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
T. Dawson, TASC 9/11/13 Use of a Technical Reference in NASA IV&V.
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
Project Management April 28, 2008 Eric Verzuh Project Management April 28, 2008 Eric Verzuh.
Proposal Development Sample Proposal Format Mahmoud K. El -Jafari College of Business and Economics Al-Quds University – Jerusalem April 11,2007.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
GNET PROPOSAL EVALUATION. GNET BACKGROUND OF THE PRESENTER Dr. Vijay Vaidyanathan.
IT 499 Bachelor Capstone Week 4. Adgenda Administrative Review UNIT three UNIT Four Project UNIT Five Preview Project Status Summary.
BSBPMG405A Apply Human Resource Management Approaches Apply Human Resource Management Approaches Unit Guide C ertificate IV in Project Management
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Configuration Management Non Government Std: EIA Standard-649 “A management process for establishing and maintaining consistency of a product’s performance,
Research & Technology Implementation TxDOT RTI OFFICE.
Machine to Machine Interface Update 1 Machine-to-Machine Interface Update January 10, 2007 Daryl Shing.
New Developments in IT Project Management Policy at NASA Robert Benedict Lara Petze August 18, 2010.
BSBPMG405A Apply Human Resource Management Approaches Apply Human Resource Management Approaches Unit Guide C ertificate IV in Project Management
Project Management All projects need to be “managed” –Cost (people-effort, tools, education, etc.) –schedule –deliverables and “associated” characteristics.
12/2/04Module 2D1 The NCSX Engineering Web – An Overview Part IV Engineering Management & Systems Engineering and Other.
BLISS Problem Statement Jonathan Rosenberg Cisco.
EGEE is a project funded by the European Union under contract IST WBS/ Execution Plan Alistair Mills Grid Deployment Group
NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
AutoDESA Presentation Project Documentation October 2005.
How the NCSX Project Does Business
1 Project Management C13PM Session 2 Project Initiation & Definition Russell Taylor Business Department Staff Workroom
September 10, FY 2003 Plans Bob Simmons. September 10, Introduction Overview of Project and Engineering Plans Project Plans Engineering Plans.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Copyright © 2007, Oracle. All rights reserved. Managing Items and Item Catalogs.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
1 WBS 1 Preparation for FDRs NCSX WBS 1 Engineering Meeting March 17, 2003 What establishes the plan? What are near term deliverables? How will we status.
DOCUMENTATION ISO/IEC 17025:2005 Documentation.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
Problem Management for ITSD “Getting to the root of it” Thatcher Deane Feb 28, 2013.
Configuration Control (Aliases: change control, change management )
1 Project Integration Using MS Project PMI Scheduling Forum June 2, 2009 Presented by: Ric Albani.
Principal Investigator ESTCP Selection Meeting
Software Project Configuration Management
Procurement Management
Principal Investigator ESTCP Selection Meeting
Driver Diagram Definitions:
How does a Requirements Package Vary from Project to Project?
Defining the Activities
TPF-5(181) Research Management Database Business Analysis
Informal document No. GRPE (70th GRPE, January 2015, agenda item 3(b))
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
Information session SCIENTIFIC & TECHNICAL NEGOTIATIONS Call FP7-ENV-2013-WATER-INNO-DEMO "Environment (including climate change)" Brussels 24/06/2013.
Sponsor Ballot Comment Resolution
Principal Investigator ESTCP Selection Meeting
Omnibus IV Contracting Strategy Michael D’Alessandro
Soft System Stakeholder Analysis
Principal Investigator ESTCP Selection Meeting
Soft System Stakeholder Analysis
Proposal for Nendica Study Item: New Managed LAN
Presentation transcript:

NCSX Interface Control Management Plan and Implementing Procedure 003 Peer Review December 19, 2002

ICMP & Procedure 0032 Background An interface is a common boundary between activities or WBS elements Interface Control is the process of developing a technical agreement between two or more activities or WBS elements that documents the functional and physical characteristics required to exist at a common boundary As the design evolves, increasing more detailed interfaces will also evolve and be documented.

ICMP & Procedure 0033 Responsibility NCSX Engineering Manager responsible for the NCSX Interface Control and Management (ICM) Program Systems Engineering Support Manager responsible for implementation and administration of the ICM Program WBS Managers and Project Engineers responsible for identifying and agreeing on interfaces

ICMP & Procedure 0034 Definition of Interfaces Primary Interfaces Primary interface exists between two separately deliverable items when the mutual boundary is not controlled by a single developmental or “design to” specification ICMP controls and manages primary interfaces only Secondary interfaces Secondary interfaces can be defined by a single developmental or “design to” specification Methods for controlling secondary interfaces left to WBS managers

ICMP & Procedure 0035 Physical and Functional Interfaces and Design Studies Physical interface – defines the physical envelope and will eventually be reflected in an ICD Functional interface – defines performance requirements and will eventually be reflected in analyses and developmental or “design to” specifications Design studies – will probably not immediately impact interfaces, but should demonstrate that we have done enough “homework” to consider the potential impact on either physical or functional interfaces.

ICMP & Procedure 0036 ICM Process Scope sheet agreements are the precursors to ICDs or “design to” specifications Really only a planning document (can be in form of , excel spreadsheet, or work table) Defines the proposed interface in general terms, who is responsible for taking the lead, what WAF tasks these items are needed to support, and specific references to WAF tasks Needed early in the design process to organize effort ICDs and “Design to” specs are the deliverables for a PDR

ICMP & Procedure 0037 Scope Sheet

ICMP & Procedure 0038 ICD Identification Scheme

ICMP & Procedure 0039 ICD Title & Approval Page

ICMP & Procedure ICD Details Page (Sections 1 & 2)

ICMP & Procedure ICD Details Page (Sections 3 & 4)

ICMP & Procedure ICD Tracking Log

ICMP & Procedure Partial Resolution of Comments Question whether there is a need for a separate ICMP outside the CMP => ICMP is a subset of the CMP Question about the number of acronyms => NCSX Procedure 001 now captures all acronyms and terms Question about physical interfaces that could exist between two components not yet designed – envelope needs to be reserved => facility model will accomplish this Question about the capability to sort interfaces individually and by WBS => tracking log is an excel spreadsheet with the capability for multiple sorts Remainder of comments incorporated in current draft (dD)