WLTP Informal document No. GRPE-62-13 (62nd GRPE, 6-10 June 2011, agenda item 3(a) 62nd GRPE agenda item 3 (a) WLTP WLTP secretary – Noriyuki Ichikawa.

Slides:



Advertisements
Similar presentations
8 th IG-Meeting Coordinated Auctioning, Auction Office and Organisational Issues Christian Todem Vienna
Advertisements

WLTP Phase 1b Organization WLTP Informal Group Chair : S. Redmann Vice Chair : K. KOBAYASHI co-TSs : K. Kolesa / N. ICHIKAWA Drafting Coordinator : from.
17/1/2008 NRMM WG GRPE1 NRMM GTR Draft Technical procedure (chapters 7-9) As informal document to GRPE GRPE working group on the emissions from Non- Road.
Report from IWG on Environmental and Propulsion Performance Requirements for Light vehicles (EPPR) 70 th GRPE th January 2015 Geneva Chair: Petter.
Worldwide Harmonised Test Procedure for Light Duty Vehicles WLTP EVE 2nd Session 13 of September Per Öhlund Co-chair Subgroup EV.
WLTP-DTP DTP Meeting 1 Wrap-up Reviewed general considerations, methodology and timing Reviewed proposals Created initial working subgroups Preparations.
WLTP GTR 15 WLTP-10-34e Report by Drafting Coordinator, Serge Dubuc
Starting note for WLTP phase 2 working items WLTP-08-41e Kazuki KOBAYASHI Vice chair of WLTP.
Starting note for WLTP phase 2 working items WLTP rev1e Kazuki KOBAYASHI Vice chair of WLTP.
REPORT TO GRPE 68 TH SESSION EVE IWG 1 Electric Vehicles and the Environment (EVE IWG) Informal document No. GRPE (68 th GRPE, 9-10 January, 2014,
MACTP MOBILE AIR-CONDITIONING TEST PROCEDURE Status report 63th GRPE January 2012 Informal document No. GRPE (63th GRPE, January 2012, agenda.
Report from IWG on Environmental and Propulsion Performance Requirements for Light vehicles (EPPR) 69 th GRPE 5-6 th June 2014 Geneva Chair Petter ÅSMAN.
GRPE 70th session PMP INFORMAL GROUP progress report TO GRPE
Submitted by the Chair of the WLTP Informal Group Informal document No. GRPE (68th GRPE, Jan. 2014, agenda item 3(a)) Status report of the WLTP Informal.
Informal Group on Gaseous Fuelled Vehicles (GFV) Report 64th GRPE June 2012 Informal document No. GRPE (64th GRPE, June 2012, agenda item 8 (a))
Brief Report to GRPE about the progress made by EFV Informal Group during its 6 th meeting held at Geneva on 15 th January, By Mr. Ambuj Sharma Chairman.
Informal document GRPE (69th GRPE, 5 – 6 June 2014, agenda item 3(a))
WLTP-DTP Test Procedure Development Methodology The DTP subgroup will undertake the following tasks: –Devise a methodology for the development of.
1 GRPE Informal Working Group on Heavy Duty Hybrids UNITED NATIONS Report to GRPE 66 Geneva, 06 June 2013 Informal document No. GRPE (66th GRPE,
Project management Topic 8 Quality Review. Overview of processes Prepare for Quality Review Questions list Meeting Agenda Review Meeting Sign-off Product.
REPORT TO GRPE 69 TH SESSION EVE IWG 1 Electric Vehicles and the Environment (EVE IWG) Informal document GRPE th GRPE, 5-6 June 2014 Agenda item.
Summary of 4 th Informal Group on WLTP 14 January 2010 Palais des Nations, Geneva Informal document No. GRPE (59th GRPE, January 2010, agenda.
WLTP GTR 15 WLTP-11-09e Monday, April 06, Report by Drafting Coordinator, Serge Dubuc.
17/1/2008 NRMM WG GRPE1 NRMM GTR Draft Technical procedure (chapters 7-9) As informal document to GRPE GRPE working group on the emissions from Non- Road.
Federal Department of the Environment, Transport, Energy and Communications DETEC Federal Office for the Environment FOEN DTP12 Report to GRPE 17th January.
Summary of 3 rd Informal Group on WLTP 11 June 2009 Palais des Nations, Geneva Informal document No. GRPE (58th GRPE, 9-12 June 2009, agenda item.
Federal Department of the Environment, Transport, Energy and Communications DETEC Federal Office for the Environment FOEN Welcome to the 7th Meeting of.
2013 年 6 月 12 日 所内フォーラム nd half1 st half2 nd half1 st half2 nd half1 st half2 nd half1 st half2 nd half WLTP-gtr.
Document No. WLTP-17-14e (WLTP IWG #17 – Geneva January 2017 )
Electric Vehicles and the Environment (EVE IWG)
REPORTING SDG INDICATORS USING NATIONAL REPORTING PLATFORMS
Electric Vehicles and the Environment (EVE IWG)
WLTP Informal Working Group
Note by the secretariat
Electric Vehicles and the Environment (EVE IWG)
DTP12 Report to GRPE 17th January 2013 Palais des Nations
Air Pollution Control and NIR Division
Welcome to the 10th Meeting of WLTP DTP 6th June 2012 UNOG Geneva
Informal document GRPE-75-18
WLTP - Validation Phase 2 - Analysis of results
Informal document No. GRPE (70th GRPE, January 2015, agenda item 3(b))
Electric Vehicles and the Environment (EVE IWG)
Informal document GRPE-77-21
Informal document GRPE-74-20
DTP 7th meeting – Bern September 2011
Air Pollution Control and NIR Division
Report of 6th DTP Meeting to GRPE 9th June 2011 UNECE, Geneva (CH)
Note by the secretariat
Report of 6th DTP Meeting to GRPE 9th June 2011 UNECE, Geneva (CH)
WLTP Informal Working Group
Correlation Improvements
Electric Vehicles and the Environment (EVE IWG)
Informal document GRPE-78-23
Background During last GRPE meeting, EU, Japan and Korea requested the creation of an RDE IWG The GRPE accepted the proposal during its June 2018 meeting.
Chair: Petter ÅSMAN Secretary: Thomas VERCAMMEN
WLTP GTR 15 WLTP-09-18e Report by Drafting Coordinator, Serge Dubuc
Review of the 1958 Agreement
Drafting Group: Final Meeting Drafting Group: 1st Meeting
A.1 to 3: Statement of technical rational and justification
Air Pollution Control and NIR Division
WLTP Informal Working Group
WLTP-DTC Air Pollution Control and NIR Division
Informal document GRPE-79-19
Status Report Cop Taskforce
Note by the secretariat
Establishment of Subgroup “Drafting”
Note by the secretariat
Palais des Nations, Geneva
WLTP - Validation Phase 2 - Analysis of results
UNECE IWG on EPPR for L-category vehicles
Presentation transcript:

WLTP Informal document No. GRPE (62nd GRPE, 6-10 June 2011, agenda item 3(a) 62nd GRPE agenda item 3 (a) WLTP WLTP secretary – Noriyuki Ichikawa GRPE chair - Christoph Albus

WLTP Informal document No. GRPE (62nd GRPE, 6-10 June 2011, agenda item 3(a) 1.WLTP – organisational issues 2.1.DHC – test cycle development 2.2.DHC – validation phase 1 3.1DTP – measurement procedure development 3.2DTP – validation phase 2 4.Next steps 5.Miscellaneous Discussion points – agenda item 3 (a) - WLTP

WLTP Informal document No. GRPE (62nd GRPE, 6-10 June 2011, agenda item 3(a) 1.WLTP – organisational issues 2.1.DHC – test cycle development 2.2.DHC – validation phase 1 3.1DTP – measurement procedure development 3.2DTP – validation phase 2 4.Next steps 5.Miscellaneous Discussion points – agenda item 3 (a) - WLTP

WLTP Informal document No. GRPE (62nd GRPE, 6-10 June 2011, agenda item 3(a) In June 2010 (GRPE & WP.29) it was decided to proceed further under the framework of the 1998 agreement (GTR development), but to undertake a re-assessment in June 2011 It was also decided to freeze the activities of the WLTP informal group, to concentrate on the work of the sub groups DHC and DTP, and to deal with heading and coordinating issues during the proper GRPE sessions in 2011 WLTP – organisation & coordination

WLTP Informal document No. GRPE (62nd GRPE, 6-10 June 2011, agenda item 3(a) Conclusions from the last 12 month: Very good progress in work of the two sub groups DHC and DTP Lack in organisation and coordination of WLTP work (e.g. definition of responsibilities, drafting of the gtr text, planning of validation, preparation of GRPE and WP.29 decisions, …) WLTP – organisation & coordination

WLTP Informal document No. GRPE (62nd GRPE, 6-10 June 2011, agenda item 3(a) WLTP – organisation & coordination Three options: 1)No change 2)Reactivation of the WLTP informal group 3)Establishment of a steering group

WLTP Informal document No. GRPE (62nd GRPE, 6-10 June 2011, agenda item 3(a) WLTP sponsor Japan(Kazuyuki Narusawa) WLTP sponsor EU(Klaus Steininger) WLTP secretary(Noriyki Ichikawa) Chris Parkin) DHC chair(Hajime Ishi, (Chris Parkin)) DTP chair(Giovanni D’Urbano) OICA(William Coleman) Drafting coordinator(tbd) Validation 2 coordinator(Alessandro Marotta) GRPE chair(Christoph Albus) WLTP – steering group - members

WLTP Informal document No. GRPE (62nd GRPE, 6-10 June 2011, agenda item 3(a) No chair – everybody can start activities and initiatives Transparency Preparation of WLTP documents  UNECE website Clarification of responsibilities (who, what, deadlines) Organisation of the WLTP project process (timing, information flow, coordination) WLTP – steering group - ToR

WLTP Informal document No. GRPE (62nd GRPE, 6-10 June 2011, agenda item 3(a) The role of DTP and DHC will not change. The steering group should not be understood as an additional level between GRPE and DTP/DHC. The main purpose is to supervise and support all WLTP activities and all sub groups permanently WLTP – steering group - ToR

WLTP Informal document No. GRPE (62nd GRPE, 6-10 June 2011, agenda item 3(a) WLTP – overall structure WP.29 GRPE DTP incl. validation 2 coordination DHC drafting manager / group steering group 5 DTP sub groups

WLTP Informal document No. GRPE (62nd GRPE, 6-10 June 2011, agenda item 3(a) Three options: 1)No change no 2)Reactivation of the WLTP informal group no 3)Establishment of a steering group yes Confirmation by GRPE ?

WLTP Informal document No. GRPE (62nd GRPE, 6-10 June 2011, agenda item 3(a) GRPEworking & informal documents steering groupWLTP – UNECE website drafting groupWLTP – UNECE website TFVWLTP – DHC – DTP – UNECE website DHCDHC – UNECE website DTPDTP – UNECE website 5 DTP subgroupscirca website (European Commission) link on UNECE website WLTP – Documents

WLTP Informal document No. GRPE (62nd GRPE, 6-10 June 2011, agenda item 3(a) Very urgent to find a person, responsible for the coordination of the gtr drafting (including drafting of the Technical Report) Many text modules for draft gtr already exists Definitions – a consistant and suitable system needs to be developed Status: European Commission is preparing a contract, but time delay because of administrative problems WLTP – drafting coordinator (manager)

WLTP Informal document No. GRPE (62nd GRPE, 6-10 June 2011, agenda item 3(a) It was discussed by the steering group whether we need an overall coordination of validation phase 1 & 2, confirmation testing and round robin For the time beeing it was decided that there is a need for coordination only for validation phase 2, in close cooperation with DTP group Possible candidate is Alessandro Marotta (JRC), but final confirmation from the European Commission is outstanding Establishment of a validation 2 task force (VTF) WLTP – coordination of the validation process

WLTP Informal document No. GRPE (62nd GRPE, 6-10 June 2011, agenda item 3(a) 1.WLTP – organisational issues 2.1.DHC – test cycle development 2.2.DHC – validation phase 1 3.1DTP – measurement procedure development 3.2DTP – validation phase 2 4.Next steps 5.Miscellaneous Discussion points – agenda item 3 (a) - WLTP