PRR 705 ERCOT Emergency Interruptible Load Service PRS January 22, 2007.

Slides:



Advertisements
Similar presentations
1 Generation Adequacy Task Force Report to TAC April 7, 2005.
Advertisements

February 25, 2011 Demand Side Working Group EILS Update Mark Patterson ERCOT, Manager Demand Integration.
Tiered Frequency Response Service Workshop On Demand-Response Programs in the ERCOT Market September 15, 2006 Mark W. Smith Smith Trostle LLP.
ERCOT Emergency Load Response Sam Jones Paul Wattles Steve Krein PUC Demand Response Workshop Sept. 15, 2006.
Enhancing Interruptible Rates Through MISO Demand Response: WIEG Annual Meeting June 19, 2008 Presented by: Kavita Maini, Principal KM Energy Consulting,
Loads Acting as a Resource Relationships with QSEs and LSEs
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
Floyd Trefny Director of Product Development Future of Demand Response In ERCOT A Presentation to the Workshop – September 15, 2006 Project Number
Intermittent Resources and Demand Response Integration 2007–2016 Long-Term Reliability Assessment Workshop Bill Bojorquez VP, System Planning August 16,
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee September 7, 2006.
32853 Evaluation of Demand-Response Programs in the Competitive Electric Market Workshop 1 September 15, 2006 Shawnee Claiborn-Pinto.
Presented By: Mark Patterson ERCOT Manager, Demand Integration November 29, Minute ERS Pilot update to TAC 1.
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2006.
ERCOT Demand Side Working Group Mary Anne Brelinsky Eagle Energy Partners.
Report to TAC February In Brief Chair and Vice-Chair for 2009 Chair and Vice-Chair for 2009 Working Group Reports Working Group Reports QMWG QMWG.
1 WMS Report TO TAC March In Brief Three Working Group Reports Three Working Group Reports Three Task Force Reports Three Task Force Reports EILS.
EILS Update DSWG ERCOT Staff October 9, EILS Update to DSWGOctober 9, 2009 Contents Procurement results: Current & historical Price comparison:
PRS - RPRS Task Force Status Summary - August 14, PRS RPRS Task Force Status Summary Prepared for WMS and PRS August 2006.
Section 5.9 – added export language Each ERS Generator site must have an interconnection agreement with its TDSP prior to submitting an ERS offer and must.
Long Term Solution Task Force TAC Report 5/5/07 Presented by: Bob Wittmeyer - LTSTF Co-Chair.
ERCOT Emergency Interruptible Load Program Kent Saathoff Ken Donohoo Paul Wattles Mark Patterson Steve Krein PUC Demand Response Workshop Oct. 2, 2006.
ERCOT Emergency Interruptible Load Program Paul Wattles Steve Krein WMS Oct. 13, 2006.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
EECP External Communications ERCOT Governmental Relations & Communications COPS June 27, 2006.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
Resource Adequacy Task Force (RATF) Update to WMS June 12, 2013.
DR issues in California discussed last year in March Historical DR in California: some background issues –Twenty years of programs/tariffs I/C and AC cycling.
EILS Cost Comparison WMS Jan. 28, Background ERCOT procures Emergency Interruptible Load Service three times annually by Contract Period –February-May.
ERCOT Emergency Interruptible Load Service Customer & Stakeholder Workshops July 2007.
1 Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 12, 2006.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2007.
Load Resources Negative RRS Bidding in the Nodal Market Credit Working Group January 30, 2008.
ERS Update – DSWG Presentation September 21, 2012.
Operations Report Kent Saathoff System Operations ERCOT.
Emergency Interruptible Load Task Force Report to TAC November 3, 2006.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee December 5, 2002.
Technical Advisory Committee Presentation to the ERCOT Board of Directors March 21, 2007.
Report to TAC July In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG DSWG MCWG MCWG MWG MWG QMWG QMWG VCWG VCWG Task Forces Task.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee November 2, 2006.
Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates.
1 WMS Report TO TAC April In Brief Two Working Group reports Two Working Group reports Two Task Force Reports Two Task Force Reports BENA presentation.
1 TAC Report to the ERCOT Board January 17, 2006.
WMS Update Demand Side Working Group Mary Anne Brelinsky Eagle Energy Partners.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
Frequency Control Task Force Presentation to the ERCOT Technical Advisory Committee June 1, 2006.
Operations Update ERCOT Board Meeting March 18, 2003.
1 TAC Report to the ERCOT Board November 14, 2006.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
Resource Adequacy Task Force (RATF) Update to WMS October 8, 2013.
Emergency Interruptible Load Service Paul Wattles ROS Subgroup Feb. 7, 2006.
Operations Update Kent Saathoff TAC Meeting March 6, 2003.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Demand Side Working Group March 5, 2010 Mary Anne Brelinsky EDF Trading North America.
Update: 30-Minute Emergency Response Service (ERS) Pilot Project Mark Patterson, ERCOT October 7, 2013.
H.B. “Trip” Doggett President and Chief Executive Officer Review of February 2, 2011 Energy Emergency Alert (EEA) Event Emergency Event Coordination Workshop.
1 WMS Report To TAC October In Brief One Working Group Report One Working Group Report One Task Force Report One Task Force Report Three Staff.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
Jan 22, TAC Report to the ERCOT Board January 22, 2003.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Energy Emergency Alert (EEA) UPDATE F EBRUARY 8, 2011.
Weather-Sensitive ERS Pilot Project Proposal March 7, 2013 TAC Meeting.
Draft NPRR Weather Sensitive ERS Loads December 2012.
Long-term Solution Task Force Ellis Rankin & Bob Wittmeyer Co-Chairs.
Technical Advisory Committee Presentation to the ERCOT Board of Directors April 18, 2007.
TAC Report to the ERCOT Board
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Intermittent Resources and Demand Response Integration 2007–2016 Long-Term Reliability Assessment Workshop Bill Bojorquez VP, System Planning August.
Presentation transcript:

PRR 705 ERCOT Emergency Interruptible Load Service PRS January 22, 2007

2 2 PRS PresentationJanuary 22, 2007 Background May 2005At TAC request, WMS asks Demand Side WG (DSWG) to work on the issue of an emergency load program to address 1-in-10-year Loss of Load Event (LOLE) 2005ERCOT staff & DSWG subgroup research emergency demand response programs in other ISOs Aug. 2005TAC rejects new Ancillary Service for alternative fuels; cites ongoing consideration of ‘demand-side services for emergency curtailments’ as one alternative Oct. 2005DSWG presents emergency Load proposal to WMS; WMS defers decision in light of PUC rulemaking Oct. 2005PUC resource adequacy draft rule includes Emergency Load Response (ELR) section; numerous parties submit comments July 2006ELR section dropped from proposed rule; deferred to Demand Response project (32853) Sept./Oct. 2006ERCOT proposes Emergency Interruptible Load (EIL) program at PUC Demand Response Workshop & presents to TAC and WMS Oct. 2006Commissioners propose parallel rulemaking & Protocol development; WMS instructs EIL Task Force to deliver PRR by 12/06

3 3 PRS PresentationJanuary 22, 2007 Recent History Dec. 2006WMS votes to consider energy-only versions of the EIL Service program & endorses PRR draft proposed by Reliant/TXU At same meeting, ERCOT expresses concern that none of the PRR drafts can be implemented in time for April 2007 procurement, and states intention to file its own version as an interim alternative Dec. 2006Reliant/TXU draft is filed as PRR703 with EIL TF as sponsor Dec. 2006PRR702 filed by Oxy, Eagle Energy, & EnerNOC Jan. 2007PRR704 filed by steel mills Jan. 2007ERCOT alternate/interim version filed as PRR705

4 4 PRS PresentationJanuary 22, 2007 Emergency Interruptible Load Service Purpose: To provide ERCOT Operations with an additional emergency tool to lessen the likelihood of involuntary firm Load shedding (a.k.a. rolling blackouts) Description: Service provided by Loads willing to interrupt immediately prior to the need for involuntary firm Load shedding, in exchange for a payment –Deployed only in emergency situations, when no more Resources are available at any price from the market or other sources in real time –New Step 3 of Emergence Electric Curtailment Plan (EECP)

5 5 PRS PresentationJanuary 22, 2007 ERCOT Emergency Operations under PRR 705 A new tool for the ERCOT toolbox Event/ActionTrigger Operating Condition Notice Physical responsive reserve below 3300 MW ADVISORY Physical responsive below 3000 MW ALERT: Start RMR units, suspend unit testing, deploy RPRS & NSRS Physical responsive below 2500 MW Emergency Electric Curtailment Plan Step 1: Dispatch all generation, public media appeal, DC Ties Physical responsive below 2300 MW Step 2: Deploy LaaRs Physical responsive below 1750 MW Step 4: Instruct transmission owners to shed firm load Frequency below 59.8 hz New Step 3: Deploy EMERGENCY INTERRUPTIBLE LOAD

6 6 PRS PresentationJanuary 22, 2007 ERCOT Firm Load Shed Events December 22, 1989 –“12 Days of Christmas” – extended sub-freezing weather –500 MW of firm Load shed at approx. 7 AM April 17, 2006 –100 degrees with 20% of generation fleet down for planned maintenance –1,000 MW of firm Load shed approx. 4 PM Neither case was related to summer peaking In both cases, firm Load shedding preserved the system In both cases, EIL Service could have avoided the need for firm load shedding if program was adequately subscribed and Loads performed

7 7 PRS PresentationJanuary 22, 2007 PRR 705: ERCOT Proposal ERCOT’s EIL proposal (PRR705): –Can be implemented in time for April EIL procurement assuming Urgent approval –Can serve as an interim proposal –Could also serve as a full-time solution if other PRRs are either not approved or fail to attract subscribers –Is designed to keep overall cost consistent with low risk of actual deployment –Is designed to balance low cost with flexibility for Loads

8 8 PRS PresentationJanuary 22, 2007 PRR 705: EIL Procurement Black Start-style bid solicitation –Load Resources or QSEs bid to provide service Procured for 4-month blocks built around 4CP months Loads may bid to provide service during business hours (8-8 M-F on ERCOT Business Days) or non-business hours, or both Loads are paid a capacity payment as bid to be available for interruption through contract period –Loads may schedule downtime (i.e., for maintenance) of up to 2% of committed hours in contract period at no penalty –Maximum of 2 deployments or 8 hours of deployment per contract period Cost of service is capped at $___ per year –Amount purposely left blank to obtain market feedback on the appropriate cost of the service

9 9 PRS PresentationJanuary 22, 2007 Cost/Value Matrix

10 PRS PresentationJanuary 22, 2007 PRR 705: Operations EILS deployed to maintain frequency after all market-based Resources have been exhausted (i.e., after RRS depleted) Dispatched through single VDI hotline call to QSEs 10-minute response required Deployed as a block, similar to LaaRs –500 MW floor on procurement –1,000 MW cap on procurement ERCOT may instruct firm Load shed even if 10-minute response period has not yet expired if conditions warrant Recalled after all RRS restored and LaaRs have been recalled –EILs have up to 10 hours to return to service

11 PRS PresentationJanuary 22, 2007 PRR 705: Performance & Payment Default baseline & event compliance method: –Loads are assigned to their own unique baseline, based on historical meter data, weather & calendar factors Uses ERCOT’s existing industry-standard Load profiling tools –Baseline will validate size of load’s MW bid, and establish Load’s expected level at time of deployment –EILS Resource required to deploy contracted amount from that baseline level Alternate baseline: –Some Loads (e.g., highly fluctuating or batch process Loads) cannot be accurately profiled in the default method –Loads in alternate baseline will be permitted to bid their average (not peak) Load over prior 12 months, and must shed to declared minimum during an event

12 PRS PresentationJanuary 22, 2007 PRR 705: Performance & Payment Payment for availability: –QSEs are paid no later than 60 days after end of contract period –Payment adjusted based on availability factor: 100% payment if 95% of load was available 95% of hours If below 95% of hours, payment is adjusted pro-rata Payment for performance in an EIL deployment event: –Loads must shed 95% of committed capacity within 10 minutes –Successful performance guarantees a minimum of 50% of capacity payment Compliance & Testing: –ERCOT may conduct unannounced Load shed tests at any time –ERCOT may suspend or revoke an EIL’s qualification for lack of availability, failure to perform in an event, or failing a test

13 PRS PresentationJanuary 22, 2007 Questions?