Commercial Operations Subcommittee Meeting April 13, 2010 Update to RMS April 14, 2010.

Slides:



Advertisements
Similar presentations
Retail Market Subcommittee Update to TAC Kathy Scott January 28,
Advertisements

QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
Technical Advisory Committee COPS Update to TAC Debbie McKeever COPs Chair 2010.
COPS Update to TAC January 6, Voting Items Three voting items: COPMGRR015, Creating Section 8, ERCOT Settlement and Invoice Process 2. 2.
Protocol Revision Subcommittee Sandy Morris August 5, 2010.
CCWG March 30 th Meeting CCWG Update to COPS April 13,
Profiling Working Group January xx, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting January ??, 2006.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee April 8, 2010.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 4, 2009.
1 Commercial Operations Sub-Committee Update to TAC October 5, 2007.
Market Mitigation Concept Group Update Jim Galvin April 26, 2004.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
Retail Market Subcommittee Update to COPS Kathy Scott July 16,
1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/ Hour.
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
Presentation to House Regulated Industries Committee Chairman Phil King Trip Doggett Chief Operating Officer The Electric Reliability Council of Texas.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Demand Response Status Report Calvin Opheim October 9, 2007.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
SEWG R EPORT TO COPS Jim Galvin- Chair, Settlements and Extract Working Group.
August 28, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 9, 2014 TAC Update to RMS 1.
Resource Adequacy Task Force (RATF) Update to WMS June 12, 2013.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
Profiling Working Group October 16, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting October 16, 2003.
Commercial Operations Subcommittee Update to TAC September 7, 2012 Harika Basaran, COPS Chair 2012 Jim Lee, COPS Vice Chair 2012.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Commercial Operations Subcommittee Update to TAC November 5, 2009.
January 29, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott February 3, 2015 TAC Update to RMS 1.
1 TAC Report to the ERCOT Board February 16, 2005.
MCWG Update to WMS 11/13/2013. MCWG Update to WMS General Update - October 30 th Joint MCWG/CWG Meeting Review September 25 Meeting Minutes - Approved.
1 Business Integration Update to PRS Troy Anderson ERCOT Enterprise Project Portfolio Management May 19, 2011.
N ODAL P ROGRAM U PDATE TO C OPS Jim Galvin.
October 3, 2013 Technical Advisory Committee (TAC) Update to RMS Kathy Scott October 16, 2013TAC Update to RMS 1.
Harika Basaran 11/05/2014 TAC October 23, 2014 Meeting Update to Commercial Operations Subcommittee.
CCWG April 28 th Meeting CCWG Update to COPS May 12,
DAM Self-Commitment Issues & Solutions, Part 2 Shams Siddiqi, Ph.D. (512) April 21, 2008.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
COPS DECEMBER 2013 UPDATE TO RMS 12/18/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Commercial Operations Subcommittee Update to TAC Debbie McKeever COPs Chair 2011.
COPS SEPTEMBER 2014 UPDATE TO TAC 9/25/2014 Harika Basaran, Chair Tony Marsh, Vice Chair.
1 Project Prioritization Review May 14, Approved Revision Requests “Not Started” – Planned to Start in Future Months Revision Request Target Start.
Retail Workshop ERCOT Nodal Update October 06, 2010.
Commercial Operations Sub-Committee Update to TAC January 8, 2009 Lee Starr, BTU.
Lead from the front Texas Nodal 1 TPTF Update for TAC August 2, 2007 Trip Doggett.
COPS JULY 2013 UPDATE TO TAC 07/02/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
NPRRs 705NPRR Provides Consistency for References to the End Date of the Generation Interconnection Process. In the Resource Interconnection Handbook,
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Lead from the front Texas Nodal 1 Texas Nodal EDS4 - Approach 11/28/2007.
Profiling Working Group September 26, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting September 26, 2003.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 7, 2009.
Commercial Operations Subcommittee (COPS) 4/15/2015 Update to RMS 5/5/2015.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
Technical Advisory Committee Commercial Operations Subcommittee Update to TAC Debbie McKeever COPs Chair 2011.
Commercial Operations Subcommittee (COPS) Update to TAC 4/28/2016
Market Trials Update NATF March 2,
Commercial Operations Sub-Committee Update to RMS
Nodal Program Update to Cops
Profiling Working Group
COPS MAY 2014 UPDATE TO TAC 5/29/2014
Presentation transcript:

Commercial Operations Subcommittee Meeting April 13, 2010 Update to RMS April 14, 2010

Voting Items One voting item. Guiding Principles of the Nodal Market Approved with AEP comments and minor changes from COPs.

Guiding Principles of the Nodal Market Does the proposed Nodal Protocol Revision Request (NPRR) or market change proposal do one or more of the following:  Improve price signals – Provide or enhance more granular pricing to encourage additional generation and/or transmission invest­ment in the proper locations.  Improve dispatch efficiencies – Enhance or increase efficiency of dispatch to yield a lower overall cost of power supply.  Directly assign local congestion – Enhance or improve settlements and related systems for pricing based on locational marginal costs.  Improve or enhance key components of the Nodal Market:  Congestion revenue rights (CRR)  Day-ahead energy and ancillary services co-optimized market (DAM)  Day-ahead reliability unit commitment (DRUC)  Hourly reliability unit commitment (HRUC)

Cont. - Guiding Principles of the Nodal Market  Resource-specific offers  Security constrained economic dispatch (SCED) generally every five minutes –All congestion management will be resource-specific –Enhanced load frequency control –Actual shift factors for resources  Nodal locational marginal pricing (LMP) for generation  Improve reliability – Provide or enhance reliability of grid operations, information technology infrastructure or commercial settlement.  Improve the Retail Market – Enhance or increase efficiency of systems or processes to support retail customer choice.  Compliance with rules - Directly address new legislation, Public Utility Commission of Texas (PUCT) rules or North American Electric Reliability Corporation (NERC) standards.  Address recommendations of the Independent Market Monitor (IMM), PUCT or ERCOT Board

Nodal Update – Key Items  Jim Galvin, Chair of SEWG presented the Nodal update  Market Trials Phase 4 – Very successful!  Basic Nodal Training has been scheduled and can be found at the following link for updated available training  Market Trails 5.0 is back on schedule. –Integrated Credit Management targeted for May-June timeframe  No new Risk or Issue items added to the Nodal Program Risks and Issues list

NODAL PROGRAM STATUS  Qualification of Market Participants- 95% of MPs qualified: –81 of 84 QSEs with resources qualified –181 of 192 QSEs without resources qualified  Full Functionality testing to begin in May will result in push to get remaining QSEs qualified  Market Trials: –2-CRR Auctions now completed –Three DAM markets simulated with two additional this week –Strong participation in DAM trials (over 150 QSEs)

CCWG Working Group Update –RSS Feeds on ERCOT.com – in place on – select “ feeds” –CCWG Completed modifications to COPMG Section 5 and Appendix A for Market Participants Notifications – currently in 21 day comment period –Continued development of Creating Section 8.1 Settlement Statements and Invoices (currently tabled at CCWG)

SEWG Update   SEWG  Focused on Nodal  Reviewing Extract issues  Completed review of UFE analysis as requested by MP. Additional analysis will be completed as ongoing work.  Nodal Settlement Algorithms – guide to be created

NODAL SETTLEMENT ALGORITHMS- SAMPLE VariableUnitDescription Interv al Freque ncy Source Shado w-able DAESAMT q, p $ Day-Ahead Energy Amount per QSE per Settlement Point  The payment to QSE q for the cleared energy offers at Settlement Point p for the hour. 1 / hour Yes DASPP p $/M Wh Day-Ahead Settlement Point Price per Settlement Point  The DAM SPP at Settlement Point p for the hour. 1 / hour DAES q, p MW Day-Ahead Energy per QSE per Settlement Point  The total amount of energy represented by QSE q’s cleared Three-Part Supply Offers in the DAM and cleared DAM Energy-Only Offer Curves at Settlement Point p, excluding the offers submitted for RMR Units at the same Settlement Point, for the hour. 1 / hour Yes DAESAMTQ SETOT q $ Day-Ahead Energy Amount QSE Total per QSE  The total of the payments to QSE q for its cleared energy offers at all Settlement Points for the hour. 1 / hour Yes Calculate Day-Ahead Energy Sale Amount QSE Total per QSE by QSE for each Operating Hour of the Operating Day. Calculations Calculate Day-Ahead Energy Sale Amount by QSE and Settlement Point for each Operating Hour of the Operating Day. Description The Day-Ahead Energy Payment is made for all cleared offers (excluding offers submitted for the RMR Units) to sell energy in the DAM, whether through three part supply offers or DAM Energy-Only Offer Curves. The payment to each QSE for each settlement point is calculated on an hourly interval.

SEWG – UFE, UPCOMING DISCUSSIONS  Significant cold weather events in February with high prices as well –Average temperature compared to in 2009 and year average  Cost and percentage statistics will be provided in April SEWG meeting  SEWG and PWG will continue to discuss and analyze UFE as part of joint sessions in the SEWG meetings  Discussions may continue on the allocation factors for UFE, however, it does not appear that consensus from one particular group (SEWG or PWG) will bring the issue to a PRR

PWG Update  As part of PWG Goals for 2010, PWG has removed “Review Weather Sensitivity Correlation and Proxy Day Method in Lieu of AMS” – ERCOT resources, system changes needed to complete. –Cannot be completed until after Nodal.

12 PWG Update – New Load Profile Model implementation  PWG needs feedback from REPs on incremental cost of updating round 2 models vs. benefits; a.No model updates at all are needed, or b.Re-estimate existing load profiling model coefficients, or c.Build models with new structures to address weather transitions per UFE presentation “profile discontinuity”, or d.New round 3 samples in TDSP areas that are not installing AMS or have later timelines, and e.Profile model transition likely to be needed due to difference in round 2 sample population mean to current profile models just like the last model implementation? f.Is ERCOT forecast of load profiles needed after AMS implementation? No feedback was provided by MPs prior to the 3/24 PWG Mtg. Further discussions for next PWG Mtg.

13 A draft PRR was presented by Direct Energy proposing that both IDR and NIDR distribution metered premises have an equal allocation factor of 0.5 A draft PRR was presented by Direct Energy proposing that both IDR and NIDR distribution metered premises have an equal allocation factor of 0.5 a. No consensus b. Discuss about the relative allocation of transmission vs. distribution c. AMIT stakeholders discussed and decided no action d. PWG and SEWG discussions continue. PWG Update - UFE Allocation – Status!

Other Business  Calvin and Don Tucker, transitioning roles…  2011 PPL – ERCOT is now accepting non-nodal projects for consideration on the 2011 PPL to These projects will be presented for review and discussion at upcoming COPs (and other subcommittee) meetings  API File Size Constraints – 3 megabyte limit for any attachment submitted (see “API Specs for Nodal” on Nodal.com)  AMS data – samples being analyzed for Board presentation

Questions ?