1 15 April 2010: Post Mortem Analysis by M.Zerlauth Automated analysis of Powering Events – Progress update.

Slides:



Advertisements
Similar presentations
André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
Advertisements

6 th April 2010 MP3 weekly summary – issues and follow-up 0v1 M. Zerlauth for the MP3-CCC shift crew.
MP3 report – week 17 19/4/2010 – 25/04/ interventions MP3/QPS team in CCC Monday Morning Meeting : 26th of April 2010.
1 15 April 2010: Post Mortem Analysis by M.Zerlauth Automatic POWERING EVENT Analysis Adam, Arek, Gert-Jan, Ivan, Knud, Hubert, Markus, Nikolai, Nikolay,
PIC configuration (maskable/unmaskable circuits) I. Romera MPP meeting –
Operating Systems.
TE/MPE/MI OP section meeting 29 th September 2009 HCC 2009 Frequently Asked Questions 0v1 M. Zerlauth.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
Powering Group of Circuit Doubts and proposals of the procedure reviewing team (Gianluigi, Rob, Sandrine, Matteo, Boris) Ref document: LHC-MPP-HCP-071.
MP3 report : W49 (6 slides, 6’) J.Ph Tock for the MP3 team Since oral report last week (24 th of November) 1JPhT – LMC 1st of December 2010.
Report on problem in opening the 13kA EE system (issue recently found during last CSCM) Bozhidar Panev
Operational tools Laurette Ponce BE-OP 1. 2 Powering tests and Safety 23 July 2009  After the 19 th September, a re-enforcement of access control during.
TE-MPE-EP, RD, 06-Dec QPS Data Transmission after LS1 R. Denz, TE-MPE-EP TIMBER PM WinCC OA Tsunami warning:
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
1 Copper Stabilizer Continuity Measurement Project Copper Stabilizer Continuity Measurement Status & Plans – May 2011 MPE-TM – 12 May 2011 M. Koratzinos,
Session 1 Introduction  What is RADE  Technology  Palette  Tools  Template  Combined Example  How to get RADE  Questions? RADE Applications EN-ICE-MTA.
Training LHC Powering R. Denz Quench Protection System R. Denz AT-MEL.
MP3 recommendations from June 2013-Feb 2014 Arjan Verweij on behalf of the MP A. Verweij, LSC meeting 7/2/2014 One of the tasks of the MP3 is.
Recent cross-wiring issue and implication for circuits protection Bozhidar Panev TE-MPE-CP
M. POJER, ON BEHALF OF THE USUAL BUNCH OF SUSPECTS… S UPERCONDUCTING CIRCUITS RE - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
NQPS commissioning …a long way to go. Topics nQPS component overview Enhancements in Firmware Commissioning diagram Detailed task list Summary.
MP3 List of main Issues during March 2010 MP3 - Team.
OVERVIEW OF THE NEW FEATURES PVSS SCADA SYSTEMS USED DURING HCC MP3 - Frédéric BERNARD.
MA PM performance, Adriaan Rijllart Post Mortem data handling and performance Adriaan Rijllart, Beno î t Pannetier, Boris Khomenko, Greg Kruk,
1 15 April 2010: Post Mortem Analysis by M.Zerlauth MP3.1 Markus, Adriaan, Odd, Zinur and many others…
Quench Detection System R. Denz TE-MPE-EP on behalf of the QPS team.
1 J. Mourao (TE/MPE/CP) Enhanced DQHDS functionality  Status for 2011  Increase Magnet diagnostic capabilities  Our proposals.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
16-17 January 2007 Post-Mortem Workshop Logging data in relation with Post-Mortem and archiving Ronny Billen AB-CO.
HWC with nQPS Splice Monitoring Zinur Charifoulline & Bob Flora Real Time (~10 sec) BUS Voltage Energy Extraction Trip 300 µV threshold on Un-bypassed.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
QPS high level controls LabView tools, an overview.
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
TE/MPE-MS MPE-TM meeting 14/06/2012, Richard Mompo Updated ELQA test procedure Co-authors: Nuria Catalan Lasheras Mateusz Bednarek Giorgio D’Angelo Richard.
LHC circuit modeling Goal: Create a library of electrical models and results for each circuit Useful and usable for the next 20 years…… Web site cern.ch/LHC-CM.
MPE Workshop for LS1 Summary of Global Activities Thanks to Speakers Arjan Verweij Hugues Thiesen Zinur Charifoulline Kajetan Fuchsberger.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
MPP Workshop Status of Powering Interlocks I. Romera on behalf of MPE-MS MPP Workshop, 12 June 2015, I. Romera (TE-MPE)1.
HWC Review – Sequencer Vito Baggiolini AB/CO, with the team: Carlos Castillo, Daniele Raffo, Roman Gorbonosov.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
Systems, their relations & information. Concepts and Status of the new central service for tracking relations between CERN accelerator systems TE/MPE TM.
An invitation to an open discussion We are team reviewing its performance globally We want to help each other to reach the objectives We know the other.
July 11, 2007 HC WorkshopG.J. COELINGH - AT / MEL 1 Energy Extraction.
Training LHC Powering Robin Lauckner Software Tools for Commissioning Robin Lauckner 28 th March, 2007.
CSCM (Thermal Amplifier) Sequence and detailed planning 07/10/2011 M.Solfaroli Thanks to: K.Brodzinski, G.D’Angelo, M.Koratzinos, M.Pojer, R.Schmidt, J.Steckert,
Industrial Control Engineering Session 1 Introduction  What is RADE  Technology  Palette  Tools  Template  Combined Example  How to get RADE 
 Automation Strategies for LHC System Tests and Re-Commissioning after LS1 Kajetan Fuchsberger TE-MPE LS1 Workshop On behalf of the TE-MPE-MS Software.
AB-CO Review September Session on circuit commissioning Session on circuit commissioning Post-Mortem requirements F. Rodríguez-Mateos on behalf.
TE-MPE-CP, RD, 28-Sep Problems with QPS DAQ Systems During LHC Operation, 1 st Results from 2010 CNRAD Tests R. Denz TE-MPE-CP.
PGC tests Test procedure and acceptance criteria for the Powering of Group of Circuits EDMS No
MPE Workshop 14/12/2010 Post Mortem Project Status and Plans Arkadiusz Gorzawski (on behalf of the PMA team)
Update on the automation of quench heater analysis Zinour Charifoulline 18/06/2015TE/MPE-PE, ZCh1 Automation team: Odd Oyvind Andreassen, Jean-Christophe.
H2LC The Hitchhiker's guide to LSA Core Rule #1 Don’t panic.
LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 1/52) AB-CO Measurement & Analysis Present status of the individual.
Main MPE Activities during YETS/EYETS/LS2 and the Provision of Resources Andrzej Siemko Andrzej Siemko TE-MPE1.
R. Denz, A. Gomez Alonso, AT-MEL-PM
Ideas and design concepts, and challenges
MP3 Review Software tools
Recommissioning of sector 12 after a short warm-up during eYETS 2016/17 QBT, MP3 – May 2017 S. Le Naour.
Powering from short circuit tests up to nominal
Powering Interlocks Quench back of corrector magnets vs revised ‘Global Powering Subsector OFF’ functionality M.Zerlauth, W.Venturini, R.Wolf, G.Kirby.
Re-Commissioning (IST) of Electrical Systems: QPS, EE & PIC
A/N 26 16:00 Access finished problem with the BLM test. one crate is failing the beam permit test. Fixed. Access required in sector 78 for QPS to fix a.
+ many slides from various colleagues (KH, Rudiger, Paul, …)
(damaged board on RQD/F)
Brief report of the hardware commissioning activities
Review of hardware commissioning
Presentation transcript:

1 15 April 2010: Post Mortem Analysis by M.Zerlauth Automated analysis of Powering Events – Progress update

2 15 April 2010: Post Mortem Analysis by M.Zerlauth Outline  Implementation is progressing well (even if not yet fully visible), will need few weeks more to tie together all pieces and release a 1 st ONLINE version (including interlocking of circuits)  Regular meetings taking place to follow the progress, workload shared between JAVA and LV developments  Currently focusing on most frequent tasks, e.g. EE openings, 600A trips, converter faults, etc… more elaborate use cases to follow later…  Reminder: Approach is purely data driven, no PM data -> potentially no analysis and no circuit locking

3 15 April 2010: Post Mortem Analysis by M.Zerlauth POWERING analysis servers up and running  POWERING event building and analysis servers are defined and up and running (ONLINE + OFFLINE) -> See later demo..  POWERING version of PMA GUI (1 st version only), only few modules included yet… – Including 1 st version of PM basket (Viewer part to be completed) – Dedicated summary screen defined but to be implemented by CO-AP

4 15 April 2010: Post Mortem Analysis by M.Zerlauth Interlocking and DB upload  (Super-)Locking mechanism on PIC via CMW implemented and deployed – Possibility to send additional comment for lock (analysis result description)  DB table + APEX interface (for web-access to DB contents and statistics) defined but to be implemented by CO-DM

5 15 April 2010: Post Mortem Analysis by M.Zerlauth Agreed minimum requirements for 1 st ONLINE version  JAVA modules: – Single Circuit Event module, to identify event source and failure type – DONE – Automatic Event Recognition Module, final module for determination of machine protection features, event summary for DB upload, circuit locking, etc…– DONE, (needs input of additional modules when available) – 600A EE/13kA verification to check switch opening – DONE – 600A EE/13kA verification to check switch opening – In progress by Arek (similar module and GUI structure as for 600A EE)  LV modules: – QH Discharge module: Mostly completed for MB and MQ magnets. To come: IPQ, IPD and IT (needs configuration DB/look-up table for discharge time, heater #, etc…) -> Zinur and Nuria – 600A quench (exclusion) module : Module to determine whether a 600A circuit really quenched or not + provide a potential fault cause (e.g. zero- voltage crossing, feedback, didt/acceleration,…) -> ongoing by Odd ? – FGC Faults + Discharge analysis to validate discharge curve + reveal the possible failure of the power converter (water fault, fan fault, etc..) -> Discussion started with Hubert

6 15 April 2010: Post Mortem Analysis by M.Zerlauth Some examples which are being developed but not yet released …

7 15 April 2010: Post Mortem Analysis by M.Zerlauth Some examples which are being developed but not yet released …

8 15 April 2010: Post Mortem Analysis by M.Zerlauth Demo – how a typical MP3 day looks in the PMA server

9 15 April 2010: Post Mortem Analysis by M.Zerlauth Demo – how a typical MP3 day looks in the PMA server – ctd…

10 15 April 2010: Post Mortem Analysis by M.Zerlauth Conclusions  Basic infrastructure mostly in place, needs some tying up (locking mechanism, DB upload), will be finished in 1-2 weeks  Module development well on it’s way, still loads of work to be done (anyone interested to contribute)?  Servers are available for playing here: postmortem/ postmortem/  First operational (and reliable) release hopefully in 4-5 weeks

11 15 April 2010: Post Mortem Analysis by M.Zerlauth

12 15 April 2010: Post Mortem Analysis by M.Zerlauth Examples where we might want to improve… (from our MP3 logbook)  Sector 3-4 SOC : - Feb 2010 CIRCUIT : many COMMENT : This concerns a provoked quench on dipole A19R3 a few days ago (on 20/2/2010 at 23h11) at a current of 6 kA. It did not cause secondary quenches in other dipoles but caused trips in many other circuits. Nothing is mentioned in the MP3 logbook about this (neither in QPS or OP logbooks)!!?? Circuits concerned: - RB.A34 - RQS.L4B1 - ROD.A34B2 - RCO.A34B2 - RSS.A34B1 - RQTD.A34B2 - RQTL11.R3B2 - RCS.A34B2 - RQTL9.R3B2 - RSD2.A34B2 - RQT13.R3B2 - RQ6.R3B2 - bus RQD.A34 - bus RQF.A34 Maybe a point of discussion for MP3. Do we have to analyze all trips/quenches (I think yes) or not. Quench signals on A19R3 look normal. I did not look at the others.  Major trip (All sectors but 56&81. - Feb kV failure in Meyrin Seen by the PC as external FPA About 400 PM files!! No heater discharged for the main circuits Could be interesting to have a check list for similar cases. Temperature of RB, RQF, RQD resistors not increasing (<50 deg) There are QPS files for many circuits (In 600 A QPS1 (2), 600 A QPS2 (2), 600 A QPS4 (about 50)) and also for dipole ; checked some of them and they are not quenches