Www.egi.eu EGI-InSPIRE RI-261323 EGI-InSPIRE www.egi.eu EGI-InSPIRE RI-261323 SA2 – Software Provisioning Michel Drescher Technical Manager EGI.eu SA2.

Slides:



Advertisements
Similar presentations
1 EGI Federated Clouds Task Force HEPiX Spring 2012 Workshop Matteo Turilli
Advertisements

EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Unified Middleware Distribution (UMD): SW provisioning to EGI Mario David.
EGI: A European Distributed Computing Infrastructure Steven Newhouse Interim EGI.eu Director.
EGI-Engage EGI-Engage Engaging the EGI Community towards an Open Science Commons Project Overview 9/14/2015 EGI-Engage: a project.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Future support of EGI services Tiziana Ferrari/EGI.eu Future support of EGI.
EMI SA2: Quality Assurance (EMI-SA2 Work Package) Alberto Aimar (CERN) WP Leader.
EGI: SA1 Operations John Gordon EGEE09 Barcelona September 2009.
EMI SA2: Quality Assurance (EMI-SA2 Work Package) Alberto Aimar (CERN) WP Leader.
EGI-InSPIRE Steven Newhouse Interim EGI.eu Director EGI-InSPIRE Project Director.
EMI INFSO-RI SA2 - Quality Assurance Alberto Aimar (CERN) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI SA2 services evolution (after the end of EGI-InSPIRE) Peter Solagna, Michel.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI Future Plans T. Ferrari/EGI.eu 1.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Vision for European DCIs Steven Newhouse Project Director, EGI-InSPIRE 15/09/2010.
European Middleware Initiative (EMI) – Release Process Doina Cristina Aiftimiei (INFN) EGI Technical Forum, Amsterdam 17. Sept.2010.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI Report Mario Reale NGI IT / GARR HEPiX f2f meeting.
This document produced by Members of the Helix Nebula Partners and Consortium is licensed under a Creative Commons Attribution 3.0 Unported License. Permissions.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI Towards H2020 Tiziana Ferrari/EGI.eu WLCG Collaboration Workshop.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Steven Newhouse Technical Director CERN.
EMI is partially funded by the European Commission under Grant Agreement RI SA2 – Quality Assurance Alberto AIMAR (CERN) SA2 Leader EMI Second EC.
RI EGI-InSPIRE RI EGI Future activities Peter Solagna – EGI.eu.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA1: Grid Operations Maite Barroso (CERN)
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI (Present and) Future of the EGI Services for WLCG Peter Solagna – EGI.eu.
EGEE-III-INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-III All Activity Meeting Brussels,
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGI Operations Tiziana Ferrari EGEE User.
EGI-InSPIRE Steven Newhouse Interim EGI.eu Director EGI-InSPIRE Project Director Technical Director EGEE-III 1GDB - December 2009.
EMI INFSO-RI EMI Roadmap to Standardization and DCI Collaborations Alberto Di Meglio (CERN) Project Director.
European Middleware Initiative (EMI) The Software Engineering Model Alberto Di Meglio (CERN) Interim Project Director.
EMI is partially funded by the European Commission under Grant Agreement RI Project Status and NA1 Alberto Di Meglio, CERN 3 rd EMI All-Hands Meeting.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI and MeDIA Steven Newhouse EGI.eu MeDIA - April
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Robin McConnell NA3 Activity Manager 28.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI on the road to Horizon 2020 Steven Newhouse EGI-InSPIRE Project Director.
European Middleware Initiative (EMI) Alberto Di Meglio (CERN) Project Director.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI strategy and Grand Vision Ludek Matyska EGI Council Chair EGI InSPIRE.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Requirements Status EGI.eu UCB
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI TS8.10 A new approach to Computing Availability/Reliability reports for EGI.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI WP5 Review Michel Drescher EGI.eu SA2 – Michel Drescher - EGI-InSPIRE EC.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Plans for PY2 Steven Newhouse Project Director, EGI.eu 30/05/2011 Future.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI WP5 Review Michel Drescher EGI.eu SA2 – Michel Drescher - EGI-InSPIRE EC.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI UMD Roadmap Steven Newhouse 14/09/2010.
EMI INFSO-RI SA2: Quality Assurance Status Report Alberto Aimar(SA2) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
EMI INFSO-RI Testbed for project continuous Integration Danilo Dongiovanni (INFN-CNAF) -SA2.6 Task Leader Jozef Cernak(UPJŠ, Kosice, Slovakia)
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Funding Global Tasks.
EGI-InSPIRE Project Overview1 EGI-InSPIRE Overview Activities and operations boards Tiziana Ferrari, EGI.eu Operations Unit Tiziana.Ferrari at egi.eu 1.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI Technology Sustainability Discussion Points DCI Sustainability Meeting.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI Services for Distributed e-Infrastructure Access Tiziana Ferrari on behalf.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI NA2: Community Engagement Steven Newhouse EGI.eu EGI-InSPIRE Review 2013.
EGI-InSPIRE EGI-InSPIRE RI The European Grid Infrastructure Steven Newhouse Director, EGI.eu Project Director, EGI-InSPIRE 29/06/2016CoreGrid.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI A pan-European Research Infrastructure supporting the digital European Research.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI Software Repository Progress Report Kostas Koumantaros et al, GRNET 7/3/2016.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI Release Process Michel Drescher, EGI Kostas Koumantaros, GRNET 7/5/2016.
EGI-InSPIRE RI EGI-InSPIRE RI EGI-InSPIRE Software provisioning and HTC Solution Peter Solagna Senior Operations Manager.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI Overview for ENVRI Gergely Sipos, Malgorzata Krakowian EGI.eu
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI.eu Service Portfolio - EGI CF’13 - Apr 2013 EGI.eu Service Portfolio.
INDICATE Final Conference, Ankara, Turkey – 15 October, INDICATE Final Conference, Ankara, Turkey EGI & eCulture The role of.
SA2 Steven Newhouse EGI-InSPIRE (INFSO RI ).
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI Sustainability & Business Models Sergio Andreozzi EGI.eu Policy Development.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI SA2 – Software Provisioning Michel Drescher Technical Manager EGI.eu SA2.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Role and Challenges of the Resource Centre in the EGI Ecosystem Tiziana Ferrari,
Sustainability of EMI Results
Steve Brewer Stichting European Grid Initiaitive
TSA2.2 QC Change Management
European Middleware Initiative (EMI)
Steven Newhouse EGI-InSPIRE Project Director, EGI.eu
Steven Newhouse Project Director, EGI.eu
SA2: Quality Assurance Status Report
Agenda Welcome Project Status (inc. Activity Reports)
EGI-Engage Engaging the EGI Community towards an Open Science Commons
Connecting the European Grid Infrastructure to Research Communities
Federated Identity Management: Status and perspectives of EGI
Steven Newhouse, EGI.eu EGI-InSPIRE Project Director
Presentation transcript:

EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI SA2 – Software Provisioning Michel Drescher Technical Manager EGI.eu SA2 - EGI-InSPIRE Review 20121

EGI-InSPIRE RI Agenda Overview Achievements Plans for PY3 Summary 2 SA2 - EGI-InSPIRE Review 2012

EGI-InSPIRE RI SA2 Overview 3 8 Countries 8 Beneficiaries 503 PMs 10.5 FTEs WPTaskBeneficiaryTotal PMs WP5-ETSA2.1EGI.eu42 WP5-ETSA2.2CSIC35 WP5-ETSA2.2LIP35 WP5-ETSA2.3CSIC35 WP5-ETSA2.3LIP35 WP5-ETSA2.4CESNET60 WP5-ETSA2.4GRNET95 WP5-ETSA2.5CESNET65 WP5-ETSA2.5KIT-G24 WP5-ETSA2.5INFN47 WP5-ETSA2.5VR-SNIC24 WP5-ETSA2.5NORDUNET6 The Netherlands Spain Portugal Czech Republic Greece Germany Italy Sweden SA2 Effort SA2 - EGI-InSPIRE Review 2012

EGI-InSPIRE RI Objectives 4 TaskObjective TSA2.1 7% O1 Establish agreements with key software providers O2 Maintain the UMD Roadmap TSA2.2 14% O3Define general and component specific quality criteria to be applied to software components TSA2.3 14% O4Verify the software components against these criteria TSA2.4 30% O5Provide a repository for the software components within UMD and the related support tools TSA2.5 35% O6Provided a distributed support unit within the EGI Helpdesk infrastructure with expertise on the deployed middleware in production use. SA2 - EGI-InSPIRE Review 2012 TSA2.1: Michel Drescher, EGI.euTSA2.4: Kostas Koumantaros, GRNET TSA2.2: Enol Fernandez, CSICTSA2.5: Ales Krenek, CESNET TSA2.3: Alvaro Simon, FCTSG

EGI-InSPIRE RI Software Provisioning 5 SA2 - EGI-InSPIRE Review 2012 Operations (SA1) Provisioning Infrastructure Staged Rollout Staged Rollout Criteria Verification Criteria Verification Production Criteria Definition Criteria Definition External Technology Providers Deployed Middleware Support Unit Quality Criteria Software Technology Coordination Board Operations Management Board User Community Board Prioritised Requirements Strategic Coordination

EGI-InSPIRE RI Technology Coordination Board Regular F2F and phone conferences –6 meetings in 6-week alternating cycle Top topics –Defined Requirements Process: Deal with strategic or cross-TP issues 43 requirements from EGI User Communities 18 requirements from EGI Operations –Task Forces: Accounting TF, Federated Cloud TF –Technology Providers: Software roadmaps Performance within SLA 6 SA2 - EGI-InSPIRE Review 2012

EGI-InSPIRE RI Technology Management Agreements with Technology Providers –Memorandum of Understanding Observer status on the TCB Used to build a collaborative relationship –Service Level Agreements Voting status on the TCB Focus on delivering & supporting software –2 New Technology Providers planned for PY3 Genesis II, QosCosGrid Annual Planning –EGI Technology Roadmap Includes the UMD Roadmap and other technical plans –EGI Platform Roadmap 7 SA2 - EGI-InSPIRE Review 2012

EGI-InSPIRE RI Maintaining Quality Criteria Formalising EGI’s software requirements –Aligned to UMD Capabilities 100% coverage through 204 quality criteria –Overview and review using EGI wiki Criteria change management –6 monthly revisions –2 public reviews per revision –To be adaptable and improve in comprehensiveness 8 SA2 - EGI-InSPIRE Review 2012

EGI-InSPIRE RI Software Verification Verification test-bed –Private cloud for EGI hosted at CESGA –Multi-OS infrastructure SL5, SL6, Debian6 Verification is a community effort –16 verifiers, 12 institutes, 7 countries –Documentation of process, guidelines & testbed Structured reporting forms Allows unfunded & external verification effort 9 SA2 - EGI-InSPIRE Review 2012

EGI-InSPIRE RI Software Verification in numbers 7 UMD releases were published –104 updates for 57 products (EMI, IGE) 134 verified, 20 rejected, 10 superseded 10 SA2 - EGI-InSPIRE Review 2012

EGI-InSPIRE RI Repository & Infrastructure 11 SA2 - EGI-InSPIRE Review 2012 Software Repository –Frontend for human consumption –Backend for production infrastructure access Software Provisioning Infrastructure –Re-use project IT support where applicable –Develop integration tools where necessary All services serving IPv4 and IPv6

EGI-InSPIRE RI Improvements in PY2 Public stable provisioning repositories –Maintain transient repositories for management –Initial support for multiple OS platforms Automation tools at different levels to streamline the process Stratuslab Marketplace and Appliance repository –Available for EGI Community 12 SA2 - EGI-InSPIRE Review 2012

EGI-InSPIRE RI EGI Repository Usage EGI Software repository hosts: –UMD releases, EGI releases, gLite 3.2 mirror Mirroring facility available based on rsync 13 SA2 - EGI-InSPIRE Review

EGI-InSPIRE RI Deployed Middleware SU 2 nd level SU for Deployed Middleware –Resolving middleware service requests Produce operational documentation –FAQs: Best Practices, Workarounds, etc. –Specific service documentation Support request follow-up Ticket oversight for 3 rd level expert support 14 SA2 - EGI-InSPIRE Review 2012

EGI-InSPIRE RI Deployed Middleware SU 786 tickets handled 170 requests solved 15 SA2 - EGI-InSPIRE Review 2012 MetricPQ5PQ6PQ7PQ8 Assigned Solved To TPM To 3 rd level Avg. (median) solution time 24 (4.2) 17(11)21(5.1)11(1.9) 3rd level support requests –Concern software problems, lacking documentation –Require analysis before forwarding –DMSU & TP assess ticket priority

EGI-InSPIRE RI rd level support follow-up High-priority requests –Deadline agreed with TP –Monitored and reported to TCB Enforced in PY3 Low-priority requests –All tickets >6 months are assessed –Feasible tickets are scheduled for next release –All others closed as unsolved by TP –All remaining closed as unsolved by DMSU after 2 weeks grace period 16 SA2 - EGI-InSPIRE Review tickets solved – 157 still open12 tickets solved – 5 still open

EGI-InSPIRE RI EMI ticket turnover in PY2 17 SA2 - EGI-InSPIRE Review 2012 High priority tickets are being promptly solved Policy of closing old low-priority tickets to reduce backlog

EGI-InSPIRE RI Federated Clouds Task Force Objectives –Integrate virtualised resources into EGI –Elicit requirements for community facing services –Provide technical feedback to Technology Providers –Work with interested research communities –Provide recommendations for the EGI ecosystem Blueprint –How to set up integration-ready virtualised resources –How to utilise the federated Cloud infrastructure Standards orientated –Facilitate choice while retaining interoperability 18 SA2 - EGI-InSPIRE Review 2012

EGI-InSPIRE RI Federated Clouds Task Force Community driven testbed activity –61 individuals, 23 institutions, 13 countries –Diverse stakeholders 15 Resource Providers, 7 Technology Providers, 4 Research Communities –Many Cloud management solutions 7 OpenNebula, 5 OpenStack, 3 StratusLab, … Prototype demonstration in March 2012 –7 Resource Provider participating –4 services: Information System, Marketplace, Monitoring and Accounting –2 Management interfces: OCCI and CDMI 19 SA2 - EGI-InSPIRE Review 2012

EGI-InSPIRE RI EGI’s Cloud Strategy SA2 - EGI-InSPIRE Review PaaS IaaS NGI VM Mgmt Data Information Monitoring Accounting Notification NGI VM Mgmt Data Information Monitoring Accounting Notification EGI-wide message bus NGI VM Mgmt Data Information Monitoring Accounting Notification Commercial VM Mgmt Data Information Monitoring Accounting Notification Personalised environments for individual research communities in the European Research Area SaaS gLite UNICORE dCache ARC Globus Community Platform Community Services Globus Genesis II EGI.eu Coordination Core software and support

EGI-InSPIRE RI Use of resources in SA2 21 SA2 - EGI-InSPIRE Review 2012 Project Period 2Project Period 1Project Period TaskPartner Worked PM Funded Committe d PM Achieved PM % Worked PM Funded Committe d PM Achieved PM % Worked PM Funded Committe d PM Achieved PM % TSA2.11-EGI.EU % % % TSA2.212A-CSIC % % % TSA2.229-LIP % % % TSA2.312A-CSIC % % % TSA2.329-LIP % % % TSA2.49-CESNET % % % TSA2.416A-GRNET % % % TSA2.59-CESNET % % % TSA2.510B-KIT-G % % % TSA2.521A-INFN % % % TSA2.538-VR-SNIC % % % Total: % % % 12A-CSIC over reporting in PY2 –Under control, trend is going down (101% in PQ8) 16A-GRNET under reporting in PY2 –Reduced salaries are translated into reduced effort in PPT –Hiring stop in Greece 9-CESNET under reporting in PY2 –Proposing merging DMSU into TSA1.7 with expanded software support

EGI-InSPIRE RI Plans for next year Quality Criteria consolidation –Publication roadmap Provisioning consolidation –Review effort spending per product –Provision Grid middleware as Cloud appliances Expanded provisioning support –Multiple UMD repositories (UMD-1, UMD-2) –Expand support for multiple OS (SL5, SL6, Debian 6) Provisioning infrastructure consolidation –Define an IaaS to be provided to research communities Federated Cloud activities consolidation –Propose a new task SA2.6 for integrating institutional private clouds into EGI –Begin the migration to production instances of existing services (e.g. Monitoring, Accounting, Information Services) 22 SA2 - EGI-InSPIRE Review 2012

EGI-InSPIRE RI Summary All objectives for SA2 have been achieved All implemented processes work as designed –Mature enough to facilitate routine work –Flexible enough to allow for change Alignment with EGI’s 2020 Strategy –Provisioning technology for the EGI now –Cloud Infrastructure Platform for EGI future 23 SA2 - EGI-InSPIRE Review 2012