Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)

Slides:



Advertisements
Similar presentations
Trigger Validation Board PVSS panels tutorial 1. TVB components 2 FPGA controls :  FPGA HCAL hadron trigger  FPGA EPPI electron, photon, pi0, Global.
Advertisements

Alice EMCAL Meeting, July 2nd EMCAL global trigger status: STU design progress Olivier BOURRION LPSC, Grenoble.
Status of the digital readout electronics Mauro Raggi and F. Gonnella LNF Photon Veto WG CERN 13/12/2011.
1 L0 Calorimeter Trigger LHCb Bologna CSN1 Assisi, 22/9/04 U. Marconi INFN Sezione di Bologna.
FPGA IRRADIATION and TESTING PLANS (Update) Ray Mountain, Marina Artuso, Bin Gui Syracuse University OUTLINE: 1.Core 2.Peripheral 3.Testing Procedures.
RPC PAC Trigger system installation and commissioning How we make it working… On-line software Resistive Plate Chambers Link Boxes Optical Links Synchronization.
Laboratoire d’Annecy-le-vieux de Physique des Particules, France Cyril Drancourt Tuesday 16 September 2003 Optical link in Calorimeter DAQ: Link FEE(CROC)
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
Local Trigger Unit (LTU) status T. Blažek, V. Černý, M. Kovaľ, R. Lietava Comenius University, Bratislava M. Krivda University of Birmingham 30/08/2012.
08/10/2007Julie Prast, LAPP, Annecy1 The DHCAL DIF and the DIF Task Force Julie Prast, LAPP, Annecy.
Dec. 19, 2006TELL1 commissioning for Calorimeters 1 TELL1 commissioning for calorimeters ■ Reminder ■ TELL1 status ■ ECS for TELL1- PVSS panels ■ Firmware.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
SPD Control Board 16th February SPD Control Board (VFE control and SPD multiplicity) VFE’s control (I2C communication: SDA,SCL; clock; reset/trigger.
Laurent Locatelli LHCb CERN Calo commissioning meeting 16th April 2008 Trigger Validation Board PVSS control status 1.
Preshower Front-End Boards News LHCb group / LPC Clermont  News  TRIG-PGA Bit Flip Behaviour  Bit Flip Simulations  Conclusion.
PS/SPD Electronics Installation and Commissioning 17 July 2007 Valentin Niess On behalf of LPC Clermont.
The L0 Calorimeter Trigger U. Marconi On behalf of the Bologna Group CSN1, Catania 16/9/02.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Laboratoire d’Annecy-le-vieux de Physique des Particules, France Cyril Drancourt Tuesday 3 June 2003 Common L1 Workshop Use in Calorimeter Old design with.
Ideas about Tests and Sequencing C.N.P.Gee Rutherford Appleton Laboratory 3rd March 2001.
PS FE Board Tests LHCb - LPC Group R. Bonnefoy, G. Bohner, C. Cârloganu, E. Conte, R. Cornat, E. Delage, J. Lecoq, M-L. Mercier, P. Perret, L. Royer Electronic.
TGC Timing Adjustment Chikara Fukunaga (TMU) ATLAS Timing Workshop 5 July ‘07.
CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
SPD Very Front End Electronics Sonia Luengo Enginyeria i Arquitectura La Salle (EALS) Barcelona (SPAIN)
CERN, 18 december 2003Coincidence Matrix ASIC PRR Coincidence ASIC modifications E.Petrolo, R.Vari, S.Veneziano INFN-Rome.
Slide 1 / 14 PSFEB Status Report LHCb Clermont Production Test preview of the PreShower Front-End Boards February the 1 rst, 2007.
PS VFE & PS/SPD FE Electronics Status and Plans 16 January 2008 LPC Clermont.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
1 Preshower Front-End Electronics Status LHCb group, LPC Clermont OUTLINE PRODUCTION TESTS PRESERIE I PGA ISSUES: ~SOLVED PRESERIE II (…) CALORIMETER MEETING.
Trigger Tests Patrick Robbe, LAL Orsay, 8 Feb 2012.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
ALIBAVA system upgrade Ricardo Marco-Hernández IFIC(CSIC-Universidad de Valencia) 1 ALIBAVA system upgrade 16th RD50 Workshop, 31 May-2 June 2010, Barcelona.
S.MonteilPRS timing1 November Clermont team - Calorimetry meeting Preshower timing / The cosmics and TED results / Collection of plots. 1. Overview.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Olivier Callot 4 July 2002 The L0 Calorimeter Trigger Basic principles Overall organization.
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)STATUS SUMMARY. 2)PLANS AND OPERATIONS FOR THE NEXT MONTH. 3)CONCLUSION. COMMISSIONING MEETING – NOVEMBER 2007.
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
SKIROC ADC measurements and cyclic ADC LPC Clermont-Ferrand Laurent ROYER, Samuel MANEN Calice/Eudet electronic meeting Orsay June.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
M.N Minard Trigger Validation Board Status Cyril Drancourt, Pierre-Yves David,Victor Coco, M.N Minard - Production status - TVB tests on Cryo side.
Upgrade: Calo Trigger Calorimeter detector 20 Link = 4 copper wire Serial LVDS 280Mhz 32
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)PROGRESS REPORT. 2)PLANS. 3)CONCLUSION. COMMISSIONING MEETING – JUNE 2008.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
S.MonteilPS COMMISSIONING1 MaPMT-VFE-FE ELECTRONICS COMMISSIONING AND MONITORING. OUTLINE 1)Ma-PMT TEST BENCHES MEASUREMENTS 2)VFE AND FE ELECTRONICS FEATURES.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
CALO News Pascal Perret LPC Clermont 23 October 2011.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
1 L0Calo ECS. 2 Introduction L0Calo consists in several boards: –In the cavern: Front-End Boards, Trigger Validation Boards and SPD Multiplicity Boards.
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
13 June 2006 R. Bonnefoy, C. Carloganu, E. Conte, R. Cornat, E. Delage, J. Lecoq, M.-L. Mercier, S. Monteil, P. Perret LPC Clermont PS Front-End Electronics.
M.N Minard Trigger Validation Board Tests and Implantation Cyril Drancourt, Pierre-Yves David,Victor Coco, Thomas Chouvion,M.N Minard - Production status.
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
PS Timing & Alignement Progresses 17 April 2008 LPC Clermont.
2 Dec 1998F Harris LHCb Trigger Meeting L0 Trigger - ‘Real Estate’ Considerations Current thinking for the size and location of L0 trigger electronics,
Barcelona Group Clermont Ferrand 11/12/2003 FunctionsFunctions Boards location and distributionBoards location and distribution CB block diagram CB block.
Update on ‘Real estate’ for Level-0
Calorimeter Upgrade Meeting - News
LHCb calorimeter main features
Overview of the LHCb Calorimeter Electronics … focus in the ECAL/HCAL
The LHCb L0 Calorimeter Trigger
Front-end Electronics for the LHCb Preshower Rémi CORNAT, Gérard BOHNER, Olivier DESCHAMPS, Jacques LECOQ, Pascal PERRET LPC Clermont-Ferrand.
PID meeting Mechanical implementation Electronics architecture
Presentation transcript:

Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)

Outline 1. Reminder : L0 calorimeter boards (ECAL Board + HCAL Board + PreShower FE Boad + Trigger Validation Board + SPD Control Board) 2. Choice and description of the experimental setup 3. Common tests achieved 4. Summary and perspectives Slide 2 / 14 Barcelona + LAL + LAPP + LPCCommon Test for L0 calorimeter

1. Reminder : L0 calorimeter overview studied system Slide 3 / 14 Barcelona + LAL + LAPP + LPCCommon Test for L0 calorimeter

ECAL board PreShower FE board HCAL board SPD Control Board Trigger Validation Board SPD-CB BCID, SPD multiplicity (sum of the 8 PS boards) PS BCID, SPD multiplicity ECAL BCID, E T max, total E T, address HCAL BCID, E T max, address 8x HCAL analogic data ECAL analogic data PS analogic data SPD numeric data (from SPD VFE) 1. Reminder : Interactions between the different devices 8x The system is represented for only one SPD Control Board : ECAL board 8x ECAL BCID, E T max, address PS BCID, ECAL address, PS & SPD neighbours cells 2x Slide 4 / 14 Barcelona + LAL + LAPP + LPCCommon Test for L0 calorimeter TVB BCID Highest electron cluster, highest photon cluster, highest local pi 0 cluster, highest global pi 0 cluster, 4 hadron candidates optic links

1. Reminder : phasing and synchronisation options Putting in phase the input signals Putting in phase the input signals - Preshower : possibility to change the phase of each ECAL input - SPD Control Board : no delay chip (data are coming from the backplane) - Validation Board : the ECAL-PS-SPD input signals and HCAL input signals can be phased independently. Each input can be read on the rising or falling clock edge. Data synchronisation Injection and acquisition of each board can be synchronised by a calibration signal (TTC Calibration Pulse). Some pipe-line registers allow to delay data : - PreShower : one common delay for the 2 ECAL inputs - Validation board : all data flows can be delayed (one common delay for all data coming from a same board) BCID alignment - BCID alignment can be achieved by a BCID reset signal. - Delay options are present on PS, Validation and SPD Control Board for offsetting the latencies between their proper BCID and the BCID inputs. Slide 5 / 14 Barcelona + LAL + LAPP + LPCCommon Test for L0 calorimeter

2. Choice and description of the setup running the different boards in the electronics installations of the LHCb experiment checking the connectivity between the boards ( production boards ) checking the synchronization and alignment options of data and BCID values verifying all functionalities of the system by long term tests set up an automated procedure to check the cabling Main goals of these common tests This common test is a preparation of the calorimeter trigger electronics commissioning phase. Slide 6 / 14 Barcelona + LAL + LAPP + LPCCommon Test for L0 calorimeter

2. Choice and description of the setup Summary of the first campaign : 20 November – 1rst December 2006 Slide 7 / 14 Barcelona + LAL + LAPP + LPCCommon Test for L0 calorimeter Begin of the second campaign : 2 April 2007 … ECAL FE – PS/SPD FE combined system : algorithm and communication extensively tested synchronization OK PS/SPD FE – SPD CB : synchronization problems  new test performed in Clermont (see Xavier’s talk) ECAL/HCAL FE – PS/SPD FE – Trigger Validation Board diagnosis of data corruptions in TVB spy RAMs Check that the problems are fixed Set up an automated procedure for checking the cabling

2. Choice and description of the setup Calorimeter boards used : Cable length : A complete crate of ECAL FE boards (16 boards) Some of them do simulate HCAL FE Boards 7 PreShower FE boards (all from preserie – final design) 2 validation boards receiving all ECAL data. One of the 2 boards receives HCAL and PreShower data (see Victor’s presentation) 1 SPD Control Board from preserie (see Alvaro’s presentation) Possibility to generate Top neighbours, Right neighbours and Top-Right corner neighbours Slide 8 / 14 Barcelona + LAL + LAPP + LPCCommon Test for L0 calorimeter We used cables with the lengths as defined for the experiment. were prototypes in the November common test

2 CROC-v2 boards used  one SpecsMaster board (4 ports) is needed for the test. Necessity to have only one software for steering the devices  the CAT codes of each board are merged into one. An important effort, prior to AND during the test, has been made aiming at developing common software between the devices to handle automated tests. 2. Choice and description of the setup Software considerations : Slide 9 / 14 Barcelona + LAL + LAPP + LPCCommon Test for L0 calorimeter

2. Choice and description of the setup Slide 10 / 14 Barcelona + LAL + LAPP + LPCCommon Test for L0 calorimeter Building 156 ECAL crate 16 ECAL boards 2 Trigger Validation Boards PreShower crate 7 Preshower boards 1 SPD Control Board

3. Common tests : ECAL - PreShower Automatic determination of the allowed phase range for ECAL to PS data  checking the connectivity of the ECAL inputs of the PreShower board  checking the ECAL address order  determining the interval of phase  OK, but found ranges between 3 and 6 ns for the seven boards. Not very comfortable. To be scrutinized further. Slide 11 / 14 Barcelona + LAL + LAPP + LPCCommon Test for L0 calorimeter ECAL board PreShower FE board ECAL injected by RAM PS, SPD injected by RAM ECAL board ECAL BCID, E T, address Outputs are acquired by RAM Data alignment : All checks from the previous common test were successfully reproduced. Checking cabling process essentially written (consistently with PVS control). Still to be tested.

3. Common tests : SPD CB - PreShower Clermont test has been reproduced successfully An automated process checks now the correctness of data at the SPD Control Board level Left to check the SPD CB response when PS/SPD FE board data are desynchronized (today) Slide 12 / 14 Barcelona + LAL + LAPP + LPCCommon Test for L0 calorimeter PreShower FE board SPD Control Board PS BCID, SPD multiplicity Outputs are acquired by RAM SPD data injected by RAM Barcelona – Clermont collaboration

Common tests : ECAL – HCAL – PreShower - Validation Slide 13 / 14 Barcelona + LAL + LAPP + LPCCommon Test for L0 calorimeter The connectivity with ECAL and HCAL boards has been checked.  Problems of SPY RAMS seen in December have been fixed by the new firmware version of the HCAL FPGA. See Victor’s talk for details. Preshower to be added today In these tests, ECAL, HCAL and PreShower data are injected by RAM. The acquisition is made by the spy RAMs of the Trigger Validation Board.

Summary and perspectives Slide 14 / 14 Barcelona + LAL + LAPP + LPCCommon Test for L0 calorimeter This second campaign of common tests has begun the 2 th april … L0 Calorimeter mainly ready for global commissioning tests. November test reproduced successfully for all the boards with ECAL, HCAL, PreShower, SPD Control and Validation boards. The major problems diagnosed last time are fixed. The automated process for checking the cabling system is not generalized yet to all boards of the L0 chain. Final implementation in PVSS software not clear (interaction with ODIN, …) Preparation of a document describing the cable test procedures (including optical cables) of the calorimeter trigger. Preparation of one document summarizing the tests (already written for the first campaign).