Keck Next Generation AO Next Generation Adaptive Optics Meeting #2 Caltech November 14, 2006 P. Wizinowich for NGAO Executive Committee.

Slides:



Advertisements
Similar presentations
Proposal / Request For Proposal Proposal / Request For Proposal Initiation Control Planning Close-down Execution.
Advertisements

NGAO Construction Project Cost Estimation: Initial Thoughts Richard Dekany NGAO Team Meeting #12 December 13, 2007.
ClosingExecuting/ Controlling ControllingPlanningInitiatingOpportunityAssessment Client AcceptancePlanning ApprovalInitiating ApprovalOpportunity Assessment.
Sixth Hour Lecture 10:30 – 11:20 am, September 9 Framework for a Software Management Process – Artifacts of the Process (Part II, Chapter 6 of Royce’ book)
W. M. Keck Observatory Keck Next Generation AO Next Generation Adaptive Optics Irvine Meeting September 14, 2006 P. Wizinowich for NGAO Executive Committee.
NGAO Controls Team Meeting August 29, 2008 Erik Johansson.
NGAO System Design Review Response Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team SSC Meeting June 18, 2008.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max, Sean Adkins for NGAO Team SSC Meeting February 20, 2008.
Build to Cost Meeting: Goals, Agenda & New Directions Peter Wizinowich NGAO Team Meeting September 11-12, 2008.
1 NGAO Instrumentation Studies Overview By Sean Adkins November 14, 2006.
WMKO Next Generation Adaptive Optics: Build to Cost Concept Review Peter Wizinowich et al. ~ March 20, 2009 February 5, 2009 DRAFT.
NGAO Control Systems Group Status, Plans & Issues NGAO Team Meeting August 19, 2008 Erik Johansson Jimmy Johnson, Doug Morrison, Ed Wetherell.
Observing Operations Concept Document Elizabeth McGrath NGAO PD Team Meeting #6 March 19, 2009.
Functional Requirements Status and Plans Christopher Neyman W. M. Keck Observatory Viswa Velur California Institute of Technology Keck NGAO Team Meeting.
NGAO Report February 18, 2009 Waimea NGAO Report February 18, 2009 Waimea P. Wizinowich for the NGAO Team.
Project Management Module 3. Keep focused on the timeline Week Prepare for Kick-off Meeting Assign teams Team forming Review and execute.
1 Keck NGAO Proposal: Management Overview Presenter: P. Wizinowich SSC Meeting June 21, 2006.
NGAO System Design: AO System (WBS 3.2) & Laser Facility (WBS 3.3) Design Inputs & Outputs Peter Wizinowich NGAO Team Meeting #9 August 24, 2007.
Science Operations Update NGAO - Meeting 11 D. Le Mignant, E. McGrath & C. Max W. M. Keck Observatory 11/05/2007.
California Association for Research in Astronomy W. M. Keck Observatory KPAO Keck Precision Adaptive Optics Keck Precision AO (KPAO) SSC Presentation January.
Build to Cost Directions & Guidelines Peter Wizinowich SSC Meeting November 3, 2008.
NGAO Meeting #3 Introduction NGAO Meeting #3 Peter Wizinowich December 13, 2006.
Planning “Science Operations” tasks for the PD phase NGAO PD Phase D. Le Mignant W. M. Keck Observatory 08/19/2008.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
NGAO Management Update Peter Wizinowich NGAO Meeting #11 November 5, 2007.
WBS 3.3 Laser Facility Jim Bell, Jason Chin, Erik Johansson, Chris Neyman, Viswa Velur Laser Architecture Meeting Oct 1 st, 2007.
Science Operations Replan NGAO - Meeting 6 D. Le Mignant W. M. Keck Observatory 04/25/2007.
NGAO System Design Phase Management Report - Replan NGAO Meeting #6 Peter Wizinowich April 25, 2007.
NGAO interface control documents: Christopher Neyman W. M. Keck Observatory Keck NGAO PD phase Meeting #6 March 19, 2007 Videoconference.
NGAO Status R. Dekany January 31, Next Generation AO at Keck Nearing completion of 18 months System Design phase –Science requirements and initial.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team (with input from Sean Adkins, Matthew Britton, Ralf.
Don Gavel: Keck NGAO meeting April 25, Keck NGAO Project Replan: AO and Laser Systems Donald Gavel NGAO Team Meeting 6 April 25, 2007.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
NGAO System Design Phase System & Functional Requirements Documents NGAO Meeting #6 Peter Wizinowich April 25, 2007.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
WBS 3.3 Laser Facility Jim Bell, Jason Chin, Erik Johansson, Chris Neyman, Viswa Velur Design Meeting (Team meeting #10) Sept 17 th, 2007.
Design Team Report: Laser Facility Chris Neyman Jim Bell, Erik Johansson, Jason Chin W. M. Keck Observatory Viswa Velur Caltech Optical Observatories Keck.
Encouraging “System Level” Thinking Christopher Neyman, Erik Johansson, David Le Mignant W. M. Keck Observatory Viswa Velur California Institute of Technology.
System Architecture WBS 3.1 Mid-Year Replan Richard Dekany NGAO Team Meeting #6 April 25-26, 2007 UCSC.
Functional Requirements Status and Plans Christopher Neyman & Erik Johansson W. M. Keck Observatory Viswa Velur California Institute of Technology Keck.
NGAO High-Contrast Performance Budget (WBS aka Companion Sensitivity) Initial WFE budget and status report NGAO Team meeting #4, WMKO Kamuela.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team SSC Meeting January 24, 2007.
Major Management & Systems Engineering Ideas for Reducing Costs Peter Wizinowich NGAO Team Meeting September 11-12, 2008.
NGAO Meeting #5 Introduction NGAO Meeting #5 Peter Wizinowich March 7, 2007.
WMKO Next Generation Adaptive Optics: Build to Cost Concept Review Peter Wizinowich et al. December 2, 2008 DRAFT.
Functional Requirements for NGAO Christopher Neyman W. M. Keck Observatory NGAO Team Meeting #9 August 24, 2007.
Trade Study Report: NGAO versus Keck AO Upgrade NGAO Meeting #5 Peter Wizinowich March 7, 2007.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max, Sean Adkins for NGAO Team SSC Meeting November 6, 2007.
Development plan and quality plan for your Project
Project Management Process Overview
Module 1 Session 1.1 Visual 1 Managing the Implementation of Development Projects Course Overview and Introduction.
Recap from last week Understand organizations, including the four frames, organizational structures. Explain why stakeholder management and top management.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
The Project Plan IT Project Management COSC
Project Management for Special Events
Project Scope Management Project management Digital Media Department Unit Credit Value : 4 Essential Learning time : 120 hours.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck NLSL II Deputy Director (Project Management)
Management & Development of Complex Projects Course Code - 706
SacProNet An Overview of Project Management Techniques.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems The Integrated Master Plan (IMP) and the Integrated Master Schedule.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
LIGO-G M Advanced LIGO Cost, Schedule and Management Gary H Sanders NSF Review of Advanced LIGO Caltech, June 11, 2003.
P r o j e c t : from INITIATING to CLOSING ( 1 ).
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
NGAO System Design Project Plans and Schedule
Project Overview.
Presentation transcript:

Keck Next Generation AO Next Generation Adaptive Optics Meeting #2 Caltech November 14, 2006 P. Wizinowich for NGAO Executive Committee

Keck NGAO 11/14/06 NGAO Meeting #2 2 Welcome - Participants In-Person Participants –NGAO Executive Committee: Rich Dekany, Don Gavel, Claire Max, Peter Wizinowich –Sean Adkins, Antonin Bouchez, Ian Cameron, Mike Ireland, Anna Moore, Chris Neyman, Viswa Velur Telecon Attendees: –Brian Bauman, Ralf Flicker, Erik Johansson, Franck Marchis, David Le Mignant, Mike Liu

Keck NGAO 11/14/06 NGAO Meeting #2 3 Goals of Today’s Meeting Introduce team structure & responsibilities Review System Requirements document Review key drivers for NGAO performance budgets Review Keck Interferometer requirements Review instrumentation study strategy

Keck NGAO 11/14/06 NGAO Meeting #2 4 Meeting Agenda 08:30 Welcome & Introductions 09:00 Management Report (Wizinowich) 09:30 Science Requirements Document (Max) 10:30 Break 10:45 Key Performance Drivers (Dekany) 12:15 Lunch 13:00 LGS Asterism Geometry & Size (Flicker) 13:30 Fixed vs Variable LGS Asterism (Velur) 14:00 Keck Interferometry Requirements (Neyman) 14:30 NGAO Instrument Study Strategy (Adkins, Moore) 15:45 Break 16:00 Discussion: Upcoming tasks & milestones (Wizinowich) 16:30 General Discussion 17:30 Adjourn

Keck Next Generation AO NGAO System Design Phase Management Report P. Wizinowich for NGAO Executive Committee

Keck NGAO 11/14/06 NGAO Meeting #2 6 Presentation Sequence System Design (SD) Phase Systems Engineering Management Plan (SEMP) + Approval Status + Budget Management Tools –WBS & tracking –Milestones –Work scope planning & approval –Document management –Science Requirements & Performance Budget Process

Keck NGAO 11/14/06 NGAO Meeting #2 7 Systems Engineering Management Plan Document describing how the Executive Committee (EC) plans to manage the SD phase – AO/SystemDesignPhasePlanning AO/SystemDesignPhasePlanninghttp:// AO/SystemDesignPhasePlanning

Keck NGAO 11/14/06 NGAO Meeting #2 8 System Design Phase Approval Status SEMP submitted to the Observatory Directors on 9/29/06 for approval Official response not yet received (has been requested) –Major issue is how many $ can be made available in FY07 Direction from WMKO management to proceed while decision is being made –Contracts (effective 10/1/06) to COO & UCSC need to be worked out

Keck NGAO 11/14/06 NGAO Meeting #2 9 NGAO SD Phase: Budget WBSName Cost ($k) FY07FY08Total 1 SD Phase Management System Requirements System Design Systems Engineering Management Plan Travel/Procure Contingency (10%) Total ($k) = Institute Work (hours) FY07FY08Total COO UCSC WMKO Students Total = $163 increase in cost of labor. Total work same as in proposal.

Keck NGAO 11/14/06 NGAO Meeting #2 10 SD Phase - Work Breakdown Structure Each major WBS produces one of the 4 major deliverables of the SD Phase: 1 System Design Phase Management  System Design Report 2 System Requirements  System Requirements Document 3 System Design Approach  System Design Manual 4 Systems Engineering Management Plan  Systems Engineering Management Plan WBS dictionary defines each element in WBS

Keck NGAO 11/14/06 NGAO Meeting #2 11 WBS 1 SD Phase Management 1.1 Planning & Contracting 1.2 Meetings 1.3 Tracking & Reporting 1.4 Proposals & Fundraising 1.5 System Design Report & Review

Keck NGAO 11/14/06 NGAO Meeting #2 12 WBS 2 System Requirements 2.1 Science Requirements 2.2 Observatory Requirements 2.3 System Requirements Document

Keck NGAO 11/14/06 NGAO Meeting #2 13 WBS 3 System Design Approach 3.1 Systems Engineering 3.2 AO System 3.3 Laser Facility 3.4 Operations Tools 3.5 Science Instruments 3.6 System Design Manual

Keck NGAO 11/14/06 NGAO Meeting #2 14 WBS 4 System Engineering Management Plan 4.1 Project Plan 4.2 Risk Assessment & Management Plan 4.3 Preliminary Design Phase Plan 4.4 Integration & Test Plans 4.5 Configuration Management Plan 4.6 Project Management Plan 4.7 Systems Engineering Management Plan

Keck NGAO 11/14/06 NGAO Meeting #2 15 System Design Phase Tracking Tracked version of the plan posted at k/NGAO/SystemDesignPhasePlanning k/NGAO/SystemDesignPhasePlanning k/NGAO/SystemDesignPhasePlanning

Keck NGAO 11/14/06 NGAO Meeting #2 16 NGAO SD Phase Milestones MILESTONEDATEDESCRIPTION SD SEMP Approved 10/9/06 Approval of this plan by the Directors. Initial SEMP version released to Directors for comment on 9/12 & final version on 9/29/06. SD phase contracts in place 10/27/06 Contracts issued to Caltech & UCSC for the system design phase. Science Requirements Summary v1.0 Release 10/27/06 Initial Release of the Science Requirements as input to trade studies and performance budgeting System Requirements Document (SRD) v1.0 Release 12/8/06 Initial release of System Requirements with emphasis on the science requirements Performance Budgets Summary v1.0 Release 2/27/07 First round of all performance budgets complete & documented SRD v2.0 Release 3/22/07 Second release of System Requirements Doc Trade Studies Complete 5/25/07 All trade studies complete & documented (as a series of Keck Adaptive Optics Notes) SRD v3.0 Release 7/12/07 Third release of System Requirements System Design Manual (SDM) v1.0 Release 8/31/07 First release of System Design Manual Technical Risk Analysis v1.0 Release 11/13/07 First round of project risk analysis complete & documented Cost Review Complete 11/30/07 Project cost estimates complete, documented & internally reviewed SDM v2.0 Release 1/8/07 Second release of System Design Manual System Design Review Package Distributed 3/4/08 SDR documents sent to reviewers System Design Review 3/31/08 SDR meeting SDR Report & Project Planning Presentation at SSC meeting 4/14/08 Final SD phase report including results of SDR & project plans

Keck NGAO 11/14/06 NGAO Meeting #2 17 Team Meeting Calendar

Keck NGAO 11/14/06 NGAO Meeting #2 18 Work Scope Planning & Approval Template posted at k/NGAO/WebHome under “Systems Engineering” k/NGAO/WebHome k/NGAO/WebHome To be prepared by WBS element lead & approved prior to performing significant work on a WBS element –In general these should be submitted at least 1 week prior to the MS Project start date Approvals & document control by Dekany & Wizinowich –We will endeavor to provide approvals within 5 working days of submittal

Keck NGAO 11/14/06 NGAO Meeting #2 19 Document Control All materials to be posted on Twiki site All significant items should be made Keck Adaptive Optics Notes & will also be archived on Keck’s docushare site (Wizinowich to provide KAON numbers) –Simple documents can use “Work Scope” template with “Keck Adaptive Optics Note XXX” at top of title block –SD phase deliverable documents should use SEMP document as a template

Keck NGAO 11/14/06 NGAO Meeting #2 20 NGAO SD Phase: Science Requirements & Performance Budget Process

Keck Next Generation AO NGAO System Design Phase Upcoming Tasks & Milestones P. Wizinowich for NGAO Executive Committee

Keck NGAO 11/14/06 NGAO Meeting #2 22 Upcoming Tasks Work Scope planning sheets –These should be submitted for all WBS elements that need to start in CY06 by 12/8 –These include WBS elements under: 2.1 Science cases 2.2 Observatory requirements 2.3 System requirements Performance budgets Trade Studies 3.5 Science Instruments Work on the scheduled WBS elements for CY06

Keck NGAO 11/14/06 NGAO Meeting #2 23 Upcoming Meetings & Milestones Meeting #3 is a Dec. 13 telecon – AO/061213_Remote_NGAO_Meeting_3 AO/061213_Remote_NGAO_Meeting_3http:// AO/061213_Remote_NGAO_Meeting_3 -Will need % complete for WBS elements prior to meeting Milestones: –SD phase contracts in place was due 10/27 –Science requirements summary v1.0 was due 10/27 –System Requirements document v1.0 due 12/8