MUON DAQ WORKSHOP Muon Week, CERN 17-21 February 2014 Nicoletta Garelli (SLAC)

Slides:



Advertisements
Similar presentations
Reciprocal Teaching: Session 1. Twilight Course Overview Session 1: An Introduction to Reciprocal Teaching Introduction to the 4 key strategies used in.
Advertisements

Anatoli Romaniouk, TRT IB meeting October 30 th 2013 TRT Tasks/Responsibilities/Manpow er issues. 1.
Sander Klous on behalf of the ATLAS Collaboration Real-Time May /5/20101.
Releases & validation Simon George & Ricardo Goncalo Royal Holloway University of London HLT UK – RAL – 13 July 2009.
Clara Gaspar on behalf of the LHCb Collaboration, “Physics at the LHC and Beyond”, Quy Nhon, Vietnam, August 2014 Challenges and lessons learnt LHCb Operations.
January 5 th  What benefits can you see emerging from using Peer and Self Assessment?  What do you see as the likely.
Problems with UPS racks last week... During the DSS tests on the weekend Jun 1-2 all racks connected to „interruptable“ UPS were cut by DSS at some point.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Project Management Integration in Translation Projects Birthe Mousten
1 Raw Event : ByteStream implementation Muon Workshop, April 2002 A. Nisati, for the Muon Trigger group.
1 Towards an Upgrade TDR: LHCb Computing workshop May 2015 Introduction to Upgrade Computing Session Peter Clarke Many peoples ideas Vava, Conor,
O FFLINE T RIGGER M ONITORING TDAQ Training 30 July 2010 On behalf of the Trigger Offline Monitoring Experts team.
From Olivier to commissioning team plans for the start-up of regular operations of LHCb 30/06 to 4/07 : Global commissioning week, all detectors, full.
Cotswold Medical Practice Patient Survey Results 2014.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks gLite Release Process Maria Alandes Pradillo.
Trigger Software Validation Olga Igonkina (U.Oregon), Ricardo Gonçalo (RHUL) TAPM Open Meeting – Mar. 1, 2007 Outline: Status of infrastructure Schedule.
By Edward Lim 8.7.  What?  Today we started the Cornerstone Piece and we were given a few tasks to complete. The tasks were to watch the Kurt Fearnly.
Year 13 Tutor Training – Reports Reports for Y13 are issued on 11 th February. This training is about your role in helping to ensure that the process is.
NSW SG 19 Nov Nov 2014 S. Zimmermann, NSW SG 1.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
Copyright © 2000 OPNET Technologies, Inc. Title – 1 Distributed Trigger System for the LHC experiments Krzysztof Korcyl ATLAS experiment laboratory H.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
Gnam Monitoring Overview M. Della Pietra, D. della Volpe (Napoli), A. Di Girolamo (Roma1), R. Ferrari, G. Gaudio, W. Vandelli (Pavia) D. Salvatore, P.
CERN Physics Database Services and Plans Maria Girone, CERN-IT
OFFLINE TRIGGER MONITORING TDAQ Training 5 th November 2010 Ricardo Gonçalo On behalf of the Trigger Offline Monitoring Experts team.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Muon Shift Organization Outline Class 1 Atlas Control Room Shifts Booking Present Status + Experience+ Feedback Class 2 reminder A. Polini & Z. Yan May.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
ATLAS Bulk Pre-stageing Tests Graeme Stewart University of Glasgow.
TGC Timing Adjustment Chikara Fukunaga (TMU) ATLAS Timing Workshop 5 July ‘07.
Online System Status LHCb Week Beat Jost / Cern 9 June 2015.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Online (GNAM) and offline (Express Stream and Tier0) monitoring produced results during cosmic/collision runs (Oct-Dec 2009) Shifter and expert level monitoring.
RAL, Apr H.Weerts SiD Workshop Summary, Next Steps & Life beyond the LOI H.Weerts Argonne National Lab.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
Kanban A story #LKUK14 blog.atos.net.
DQM for the RPC subdetector M. Maggi and P. Paolucci.
Prompt Calibration Loop 11 February Overview Prompt calibration loop in SCT –Provides ATLAS with conditions data used for the bulk reconstruction.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Ops Portal New Requirements.
CERN IT Department CH-1211 Genève 23 Switzerland t Migration from ELFMs to Agile Infrastructure CERN, IT Department.
Pavel Nevski DDM Workshop BNL, September 27, 2006 JOB DEFINITION as a part of Production.
March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
Detector SimOOlation activities in ATLAS A.Dell’Acqua CERN-EP/ATC May 19th, 1999.
14 th IEEE-NPSS Real Time Stockholm - June 9 th 2005 P. F. Zema The GNAM monitoring system and the OHP histogram presenter for ATLAS 14 th IEEE-NPSS Real.
ID Week 13 th of October 2014 Per Johansson Sheffield University.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
February 26 th 2013Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE Operations: Evolution of the Role of.
Marco Cattaneo, 3-June Event Reconstruction for LHCb  What is the scope of the project?  What are the goals (short+medium term)?  How do we organise.
DataGrid and CrossGrid Helpdesk CERN, 30th October 2002 EDG WP6 meeting Sophie Nicoud (CNRS-Marseille) and José Salt (IFIC-Valencia)
“Technical run experience” Gianluca Lamanna (CERN) TDAQ meeting
Marco Cattaneo, 20-May Event Reconstruction for LHCb  What is the scope of the project?  What are the goals (short+medium term)?  How do we organise.
Schedule ● External Links ● Calorimeter Signals ● Internal Tests ● System Tests ● Combined Runs ● Schedule Murrough Landon 19 April 2007 A brief update.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
M4 Operations ● Operational model for M4 ● Shifts and Experts ● Documentation and Checklists ● Control Room(s) ● AOB Murrough Landon 24 July 2007.
Calibration Operations ● Recent Changes ● Required Changes ● Calibration by Shifters Murrough Landon 23 March 2011.
MICE Computing and Software
MICE Collaboration Meeting Saturday 22nd October 2005 Malcolm Ellis
Readiness of ATLAS Computing - A personal view
Savannah to Jira Migration
Summary/Conclusions of the SuperB PID Sessions.
Online Software Status
10/month is the present production rate 2 FTE + sporadic contributions
Achieving goals. Together.
Software System Integration
Detector parameters and modelling
DQM for the RPC subdetector
Weekend Summary Friday Saturday Sunday C. Gemme, INFN Genova,
Presentation transcript:

MUON DAQ WORKSHOP Muon Week, CERN February 2014 Nicoletta Garelli (SLAC)

Workshop’s Goal LS1 Need to keep DAQ up-to-date Occasion to fix and improve specific items Few people working on DAQ for the 4 subsystems  Try to work together as a whole system Share knowledge Identify tasks and priorities Learn more about progress on specific topics How to cure the MDT saturation problem  Tiesheng TGC: How to improve the quality of the clock distribution and the noise burst  Toshi RPC: progress on the new electronics and the new RCD  Franz Discussion on some common aspects Please, stop, ask, interact! 2/20/2014 2

Muon DAQ Trying to collect information on a dedicated twiki Please, use it, update it! Collect ideas for qualification tasks Regular short meetings on Tuesday late morning since beginning of the year Is it useful? 7.8 FTE expected for 2014 A lot of work! Ask for (wo)manpower? Try to improve collaboration with Monitoring group DQ group DB experts 2/20/2014 3

Muon Loop Idea: to have it working before the new CTP To run muon system independently So far: SLC5/tdaq : MuonLoop partition with MuCTPi and TGC MuCTPi was generating 500 Hz L1A and the data were flowing from the TGC RODs to the SFIs without errors nor timeouts Lessons learned: Detector needed in order to use RODs DAQ Slice used  good start towards (non ROS-EB) stand-alone data taking Next Steps Migrate to tdaq Muon sw, L1 sw, DAQ Slice Integrate the other detectors Perform timing measurements (L1 help needed) 2/20/2014 4

Muon Loop Plans In the next months fewer big interventions on the infrastructure scheduled More time for testing/running Needed pieces Experts running the system Experts checking the timing with L1 people Experts following up the upgrade of the sw to tdaq-05 Will to make it working? If yes, by when? My guess: it could run in July 2014, if one person would work for a full day per week on it. Good opportunity for new people to learn how to make the system running 2/20/2014 5

SLC6/tdaq-05 Migration to SLC6 done by sysadmins Fine. Few problems under control Very important to use ticket system to report bugs/ask requests to sysadmins ( During_standard_working_hours ) During_standard_working_hours Migration to tdaq Release notes actually contain very valuable information Many new features offered by TDAQ not (yet) used or seriously studied/considered  we can do better Some muon participation to the TDAQ Training Was it useful? We should send feedback to TDAQ Compilation of muon sw against tdaq Done a bit at the last moment, basically more than half M1 used for this  too few people working on this? 2/20/2014 6

M1 We are basically at the first point Running standalone After this experience, will we be able to finish the integration during M2 or better aim to M3? I think it was good to have experts around (despite concurrent Muon week) and progress on the compilation/standalone but now we should be able to define better our goals for next M run Shifter assistant and automatic actions by when? 2/20/2014 7