Improved Power Ratings for Standard Chip Resistors MIL-PRF-55342 Andrew R. Ernst Defense Supply Center, Columbus Electronics Engineer DSCC-VAT Defense.

Slides:



Advertisements
Similar presentations
Large Aircraft Survivability Initiative (LASI) Programmatic Overview Briefing for the: 4 th Triennial Aircraft Fire & Cabin Safety International Research.
Advertisements

DoD Teaming Group E2C2 FST Obsolescence Management Team May 2, 2001
DLA's Aviation Supply & Demand Chain Manager Defense Supply Center Richmond Aviation Engineering Reliability and Sustainment Programs Defense Logistics.
Defense Contract Management Agency Quality Assurance Directorate Presented By: Michael Shields Executive Director, Quality Assurance March 15 th, 2011.
Department of Defense Pest Management Measures of Merit (MoMs) FY 2013
Company Confidential Registration Management Committee (RMC) Other Party (OP) Assessor Workshop San Diego, CA January 20, AS9104/2 Oversight Process.
Time Sheets Go On-Line Web Time Entry Cabinet Review July 19, 2006.
ANSI/EIA A EIA STANDARD Earned Value Management Systems Overview May 2, 2006 NDIA Program Management Systems Committee Walt Berkey, Lockheed.
Pipeline Personnel Qualification
Parts Standardization and Management Committee (PSMC)
Office of the Secretary of Defense Defense Microelectronics Activity (DMEA) Defense Microelectronics Activity (DMEA) Doug Casanova Defense Microelectronics.
Sikorsky A United Technologies Company FAA / NASA Workshop, Chicago, IL – August 6-8, 2002 Review of FAA Material Specification Guidelines Document John.
R·I·T Kate Gleason College of Engineering Design of a Tensile Load Frame for a Scanning Electron Microscope Senior Design Project Project Manager.
0 The Rule-Making Process How It Works and How You Can Get Involved First Annual FAR/DFARS Conference October 24, 2006.
Innovate, Educate, and Transform Linda Fischer, Ed.D., Doctoral Support Center January 2014 Navigating the Dissertation.
Naval Organization Chapter 6 BMR
IEEE Fellow Program E.Panayırcı IEEE Fellow Committee Member.
1 COMBAT VEHICLES SUPPORT INITIATIVE (CVSI) Industry Day Briefing Defense Supply Center Columbus 16 Oct 2007.
Operation Tomodachi Individual Radiation Monitoring LCDR Thad Sharp, USN Joint Forces Land Component Command (JFLCC) – III MEF(F)
Leaders in Technology & Innovation ISO 9001:2000 & AS9100 Certified.
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
Responsible Conduct of Research (RCR) Farida Lada October 16, 2013
State of Maine NASACT Presentation “Using the Business Case to Guide a Transformation Procurement” 1 Using the Business Case to Guide a Transformation.
Phoenix Convention Center Phoenix, Arizona ANDREA L. KINCAID DLA Energy Integrated Energy TrackIntegration of the Energy Industry.
OEM SCR Expectations in a Zero Defects Environment Leading Edge Ceramic and Tantalum Capacitors May 22-24, 2007 Perspectives from you Supply Base Automotive.
UNCLASSIFIED 1 Partnership Opportunities Catalog United States Joint Forces Command Joint Warfighting Center Joint Warfighting Center Partnership Opportunities.
Phoenix Convention Center Phoenix, Arizona ANDREA L. KINCAID DLA Energy Track 5 Project FinanceSession 6 Renewables Through Private Financing.
The High Level Architecture Introduction. Outline High Level Architecture (HLA): Background Rules Interface Specification –Overview –Class Based Subscription.
Business Practices Subcommittee Update Executive Committee Meeting February 24, 2015.
Defense Acquisition University Defense Logistics Agency Diminishing Manufacturing Sources & Materiel Shortages (DMSMS) Training for the DoD Workforce Mr.
Electric Transmission Lines and Utility Corridors.
1 Pesticide Program Dialogue Committee Meeting State Lead Agency Presentation Chuck Andrews, Chair AAPCO Worker Protection Committee California Department.
Fax: (703) DoD BIOMETRICS PROGRAM DoD Biometrics Management Office Phone: (703)
NDIA PMCS May Rosslyn, VA Earned Value Management System Acceptance Working Group Buddy Everage Working Group Lead.
Performance Transformation Culture STANDARDIZATION OF ENHANCED PLASTIC MICROCIRCUITS FOR MILITARY APPLICATIONS Thomas Hess DSCC Chief, Active Devices Team.
Dale Roberts Sustainment Engineering Branch Defense Supply Center Richmond Defense Logistics Agency March 2005 Defense Logistics Agency Standardization.
Date: 25 Sep 12 Presented by: Steve Watts Team Leader Aviation and Missile Research, Development and Engineering Center Presented to: MRL Government /
Industry Day DoD Parts Management Reengineering LMI McLean, VA May 8, 2007 Parts Standardization and Management Committee (PSMC )
NYS Department of Environmental Conservation Flow Standard Amendment to New York’s Water Quality Standards Regulations Scott J. Stoner Chief, Standards.
DoD Qualification Database DoD Standardization Conference March 18, 2004 Briefer: Donna McMurry, DSPO.
DoD Qualification Program Update 2004 DoD Standardization Conference March 17, 2004 Briefer: Donna McMurry, DSPO.
Best Practices Performance Measurement for Governing Boards and Commissions Prepared for training presented in April 2008.
BUS OPERATOR WORKSTATION PROCUREMENT TEAM TRAINING T O ENHANCE BUS OPERATOR ERGONOMICS, HEALTH, AND SAFETY A TRAINING TEMPLATE FOR TRANSIT AGENCIES [ADD.
PCB Assembly. INTRODUCTION  PCB abbreviation is a printed circuit board,also known as a printed wiring board.  For electronics PCB is used to build.
Environment, Safety, and Occupational Health Opportunities in DoD Business Transformation May 4, 2006.
Bio Diesel Update Green Ship Initiative – B100 Inter Agency Task Force Army Corps of Engineers – B100 Navy – HR-D 2 nd Generation Bio Diesel.
DoD Procurement Conference and Training Symposium May 13, 2010 Peer Reviews Dick Ginman Deputy Director, DPAP.
Program Compliance Review Committee
Parts Management Plan Builder 26 July 07
Presented By: John Gierlach, Senior Advisor Ontario Power Generation
TAP eForm & Enterprise Database Training
Internship orientation: Research module basics
Architecture Tool Vendor’s Day
Presentation Title Goes Here
CTMA Investment - $2.3M; Industry Cost Share - $4.8M
City-wide LED Street Light Conversion Program
Sourcing and Qualifications Division DLA Land and Maritime - VQE
Committee of Small Arms Producers (CSAP) National Small Arms Technology Center (NSATC) and Consortium Overview 5 February 2004.
Sourcing and Qualifications Division DLA Land and Maritime - VQ
Quality management standards
TEAM NAME. TEAM NAME Additive Manufacturing Business Model Workshop Day 2 Outbrief 31 May 2018.
Responsive Strategic Sourcing for Services (RS3) Overview
Russell Center Small Research Grants Program
Single-Phase Qualification of Microcircuits in ESCC 9000
Workshop Session I.
OMNIBUS PROGRAM OVERVIEW
Dennis Harwig and Bill Mohr, EWI
2019 Additive Manufacturing Workshop DoD AM Policy Development Working Group Co Leads: Greg Kilchenstein Steve Linder.
Sourcing and Qualifications Division DLA Land and Maritime - VQ
Presentation transcript:

Improved Power Ratings for Standard Chip Resistors MIL-PRF Andrew R. Ernst Defense Supply Center, Columbus Electronics Engineer DSCC-VAT Defense Standardization Program Conference 4-6 March 2008 Performance Transformation Culture

2 Team members: Jeff Carver - US Army CECOM Life Cycle Management Command AMSEL-LC-LEO-E-AV, (Army-CR – PA/Custodian) Andrew Ernst - Operations Support Group, Document Standardization Unit, Electronics Devices Team, DLA- DSCC-VAT (DLA-CC - Agent (Standardization)) Jeff Zern – Operations Support Group, Sourcing and Qualifications Unit, Passive Devices Team, DLA-DSCC- VQP (DLA-CC - Agent (Qualification)) Performance Transformation Culture

3 Overview Specification Background vs. Penny Impact of the Specification. Non-Standard Chip Resistors. Standardization Challenges. - Acceptable Transition of New Power Ratings. - Testing Sample and Protocol. - Evaluation of Data. - Military/Industry Coordination. Results of Coordination. - Sample of New Power Ratings. Benefits. Performance Transformation Culture

4 Specification Background Originated 1971 to cover subminiature chip type electronic resistors in hybrid microcircuit applications. The scope of the specification increased significantly in the 1990s with the move to surface mount applications. “Chips mounted on printed circuit boards”. Performance Transformation Culture

Courtsey of Bob Sutterlin State of the Art, Inc vs. Penny Performance Transformation Culture

6 Impact of the Specification Large Inventory Impact - Currently around 2,600 NSNs assigned to MIL-PRF standard parts in the DoD inventory system. Affects Critical Weapons Systems - Over 200 weapons system (Nimitz carriers, F/A-18, B-2, Patriot and TOW missile, etc.). Performance Transformation Culture

7 Nonstandard Chips Received feedback that OEM designers were wanting to use nonstandard chips with a higher power rating in their new design. SCDs were being created on these nonstandard parts and were entering the inventory system. Original power ratings were conservatively based on hybrid microcircuit applications. An upgrade of the power rating for the standard parts was needed. Performance Transformation Culture

8 Standardization Challenges The standardization of new power rating that would better reflect the capability of the standard parts. Options: - Develop 13 new specification sheets with the new power ratings. - Thousands of new standard part numbers would be required. - The original power rating becoming obsolete. - Still support those parts in the inventory system. Performance Transformation Culture

9 Standardization Challenges Or - Increase the power rating in the existing 13 specification sheets. - Using the same material, design, and construction of the existing chips. - No new standard part numbers would be needed. - Would require support of the military departments, OEMs and all QPL manufacturers. Performance Transformation Culture

10 Standardization Challenges Develop a test protocol for consistency and evaluation. Samples for life testing 3 sizes from thick film (2512, 1005, 0502) 3 sizes from thin film (same sizes) Each size would have 102 pieces (34 high, 34 critical, 34 low resistance values) 612 total chip resistors for test. Timeframe for testing - 2 years to complete testing. Performance Transformation Culture

11 Standardization Challenges Evaluation of the new ratings test data. After completion of the testing the QPL Manufacturers sent their data to DSCC-VQP for evaluation against the ER failure rate system criteria. No problems and approval was granted. Based on the test data, drafts with the proposed changes to the existing power rating were distributed for coordination. Performance Transformation Culture

12 Military/Industry Coordination Military & other Agencies - Air Force – 11, 19, 99 - Army – CR, AR, AT, AV, CR4 - Navy – EC, AS, CG, MC, OS - NASA – NA Industry - OEMs: Boeing, Lockheed-Martin, Raytheon & EIA G-11 Committee - QPL manufacturers: State of the Art, Mini-Systems, Vishay Dale, Vishay Thin Film, Vishay Israel, IRC, and Piconics. Performance Transformation Culture

13 Results of the Coordination Broad based support in the military and industry for the standardization template developed by the Army and DSCC. The dating of MIL-PRF-55342H, Amendment 1, and 13 specification sheets of 15 October New power ratings that are reflective of the capability of the existing design. - No need to established a new cadre of standard part numbers. - No changes to existing part lists, NSNs and inventories of millions of parts that have been produced. Performance Transformation Culture

14 Sample of New Power Ratings MIL-PRF PREVIOUS MIL-PRF-55342H PROPOSED MIL-PRF-55342H Amendment 1 FINAL DISPOSITION MIL-PRF-55342H Amendment 1 pwr (mW) pwr (mW) pwr (mW) ThickThin /1 (0502) /3 (1005) /9 (2512) 750 (fb) 500 (fb) 1.0W 1W (cb) 500 (cb) Performance Transformation Culture

15 Benefits Over $8 million in cost avoidance by avoiding new standard part introductions. Multiple sources were maintained for all 13 specification sheets. All 7 QPL manufacturers made the transition. Thousands of existing QPL products in distributors inventories that are capable of the new improved power ratings. Precludes costly SCDs on nonstandard parts. Performance Transformation Culture