June 3, 2004G.W.Foster - Proton Driver Proton Driver Project Development, Tactics & Strategy G. W. Foster Fermilab User’s Meeting June 3, 2004.

Slides:



Advertisements
Similar presentations
Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
Advertisements

Plans for a Proton Driver Bob Kephart January 12, 2004.
Muon Collider 2011 Workshop Jun 27-July 1 in Telluride, CO Gollwitzer & Nagaitsev presented Attending: Ankenbrandt, Lebedev, Pasquinelli, Popovic, and.
Here’s What I Won’t Talk About Enrico Fermi’s (1954) Space-Based World Machine Bill Foster Sulak Festschrift October 22, 2005.
1 M. Popovic NFMC Collaboration Meeting IIT Muon (Pre)Acceleration for 8 GeV Proton Driver Linac Milorad Popovic FNAL 14-March.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
Nufact09-IIT 107/24/2009 Project X and a Muon Facility at Fermilab Milorad Popovic FNAL.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
Fermilab I. Terechkine1 RF Phase Shifter R&D Proton Driver Review March 15, 2005 T. Barrak, B. Foster, I. Gonin, M. Huening, V. Kashikhin, T. Khabiboulinne,
Project X: A multi-MW Proton Source at Fermilab Steve Holmes Extreme Beam Lecture Series June 11, 2009.
High Power RF Systems, Control and Distribution in the HINS Alfred Moretti, Brian Chase, Chris Jensen and Peter Prieto Fermilab Accelerator Advisory Committee.
Proposal to DST/DAE to support Indo-US Collaboration on Accelerator and Detector R&D International Linear Collider: Accelerator International Linear Collider:
ANL-FNAL Collaboration on High Intensity Neutrino Source Activities G. Apollinari Introduction Collaboration Activities ‘05-’07 Achievements ’07-’10 Plans.
F Project X Overview Dave McGinnis October 12, 2007.
Fermilab High Intensity Neutrino Source R&D Program - Mission, Status, Plans, and Support Needs - For AD Department Heads March 2007 Bob Webber.
Proton Driver Status Bob Kephart August 25, 2004.
Proton Driver Main Linac Parameter Optimization G. W. Foster Proton Driver General Meeting Jan 19, 2005.
F Project X Overview Dave McGinnis August 8, 2007.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
ESS RF System Design Stephen Molloy RF Group ESS Accelerator Division SLHiPP2 4-May-2012.
Proton FFAG Accelerator R&D at BNL Alessandro G. Ruggiero Brookhaven National Laboratory Alessandro G. Ruggiero Brookhaven National Laboratory.
Fermilab Proton Driver Project Weiren Chou for Bill Foster Fermilab, U.S.A. October 20, 2004 Presentation at the Proton Driver Session ICFA-HB2004, Bensheim,
Jan 12, 2005G.W.Foster - Proton Driver General Meeting Proton Driver General Meeting Kick-off Presentation G. W. Foster PD General Weekly Meeting Jan 12,
Fermilab Proton Driver and Muons David Johnson Fermilab Neutrino Factory Muon Collider Collaboration Meeting March 14, 2006.
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
Design Optimization of MEIC Ion Linac & Pre-Booster B. Mustapha, Z. Conway, B. Erdelyi and P. Ostroumov ANL & NIU MEIC Collaboration Meeting JLab, October.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
Proton Driver Resources & Schedule (R&D Plan) Rich Stanek May 10, 2005.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
Proton Driver / Project X Keith Gollwitzer Fermilab August 30, 2012.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
F DOE Annual Program Review High Intensity Neutrino Source R&D in the Meson Detector Building Bob Webber & Giorgio Apollinari September 26, 2007.
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
WP3: The Neutrino Factory Costing Status Ajit Kurup CERN Costing Workshop 8 th December 2011.
Proton Driver Status Bob Kephart Proton Driver Physics Workshop Oct 6, 2004.
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
Protons for Neutrinos: Mid-Term and Project-X Bob Zwaska Fermilab Intensity Frontier Neutrino Working Group Meeting October 24, 2011.
Current Proton Driver Activities in the Accelerator Division Accelerator Physics and Technology Seminar Bob Webber February 2, 2006.
Project X: Accelerators Sergei Nagaitsev September 2, 2011.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Fermilab SRF Linac Development Steve Holmes Workshop on High Intensity Proton Accelerators October 19, 2009.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
HISTORY OF SNS DESIGN AND TECHNOLOGY CHOICES PROJECT X WORKSHOP NOVEMBER 12-13, 2007 R. KUSTOM.
8 GeV Injector Linac G. W. Foster 14 Nov‘031 8 GeV Multi- Mission Injector Linac (SCRF Proton Driver) G. William Foster.
U.S. Plans for High Power Proton Drivers Steve Holmes Fermilab Workshop on Physics with a Multi-MW Proton Source CERN May 25, 2004.
The Fermilab Roadmap, Project X, and Muon Facilities Steve Holmes NFMCC Meeting March 17, 2008.
Project X High Power 325 MHz RF Distribution and Control Alfred Moretti, Nov 12, 2007 Project X Workshop.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Summary Vyacheslav Yakovlev Fermilab, USA.
High Intensity Neutrino Source HINS Linac Front-End R&D --- Systems Integration, Beam Diagnostics Needs, and Meson Lab Setup Bob Webber.
UK Neutrino Factory Conceptual Design
Uppsala Commitment to ESS and FREIA Planning
Plans for a Superconducting Proton Linac at CERN
Accelerator Layout and Parameters
Muon Acceleration using 8 GeV Proton Driver Linac
Superbeams with SPL at CERN
XFEL Project (accelerator) Overview and recent developments
CEPC RF Power Sources System
High Intensity Neutrino Source R&D Overview
Electron Source Configuration
ILC - Global Design Effort
Presentation transcript:

June 3, 2004G.W.Foster - Proton Driver Proton Driver Project Development, Tactics & Strategy G. W. Foster Fermilab User’s Meeting June 3, 2004

G.W.Foster - Proton Driver This is supposed to be a non-technical talk … I’ll do my best….

June 3, 2004G.W.Foster - Proton Driver Some Developments 1 st Round of PD Design Studies Completed PD Recommendation by FLRPC New Design Iteration Started –Goal: CD-0 Documentation by End of ’04 –Both Synchrotron and SCRF Linac (emphasized) US SCRF Collaboration enthusiasm for PD ITRP Decision Pending

June 3, 2004G.W.Foster - Proton Driver Proton Driver Synchrotron & Linac SYNCHROTRON –Sited West of the existing booster –Re-uses existing linac enclosure 8 GeV LINAC –Baseline Site injects at MI-30 straight section –Others possible

June 3, 2004G.W.Foster - Proton Driver Q: WHAT IS THE SIGNIFICANCE OF THIS NUMBER ? A: this is the number of vacuum tubes required to accelerate beams to 8 GeV in Fermilab’s current Proton Source. 451

June 3, 2004G.W.Foster - Proton Driver 8 GeV Superconducting Linac New idea incorporating concepts from both the Spallation Neutron Source (SNS) and TESLA. –Copy SNS Linac design up to 1.3 GeV –Use “TESLA” Cryomodules from GeV –H - Injection at 8 GeV in Main Injector ==> “Super-Beams” in Fermilab Main Injector: – 2 MW Beam power at BOTH 8 GeV and 120 GeV – Small emittances ==> Small losses in Main Injector – Minimum (1.5 sec) cycle time – MI Beam Power Independent of Beam Energy ==> (flexible neutrino program)

June 3, 2004G.W.Foster - Proton Driver 8 GeV Superconducting Linac With X-Ray FEL, 8 GeV Neutrino & Spallation Sources, LC and Neutrino Factory ~ 700m Active Length 8 GeV Linac X-RAY FEL LAB 8 GeV neutrino Main MW Anti- Proton SY-120 Fixed- Target Neutrino “Super- Beams” NUMI Off- Axis & Long-Pulse Spallation Source Neutrino Target Neutrinos to “Homestake” Short Baseline Detector Array Target and Muon Cooling Channel Bunching Ring Recirculating Linac for Neutrino Factory VLHC at Fermilab Damping Rings for FNAL With 8 GeV e+ Preacc. 1% LC Systems Test

June 3, 2004G.W.Foster - Proton Driver 8 GeV SC Linac Proton Driver A Bridge Program to the Linear Collider Near Term Physics Program (neutrinos+) Multiple HEP Destinations & Off-Ramps A seed project for Industrial Participation 50 cryomodules, 12 RF stations, ~1.5% of LC

June 3, 2004G.W.Foster - Proton Driver New Proton Driver Charge Letter

June 3, 2004G.W.Foster - Proton Driver Proton Driver Charge (machine) Goal: CD-0 Documentation by End of ’04 Both Synchrotron and SCRF Linac (emphasized) –Common Performance Specs and Cost Basis External Review of Accelerator Physics Investigation of Outside Collaboration

June 3, 2004G.W.Foster - Proton Driver PD Work in Progress … Weekly meetings in specific technical areas (four) Visits from experts Prototype key components Develop Collaborations

June 3, 2004G.W.Foster - Proton Driver Linac Technical Strategy TESLA compatible frequency chosen –Prototypes & vendors exist for 7/8 of linac –Complete overlap with LC test facility Staging Stand-Alone Linac Beam Power –Cut Klystron count from 42  12 –Preserve 2 MW beam power in MI Adopt “Pulsed RIA” SCRF front end

June 3, 2004G.W.Foster - Proton Driver Cost Driver: Klystrons per GeV

June 3, 2004G.W.Foster - Proton Driver 0.5 MW with TESLA Frequencies & SCRF F.E.

June 3, 2004G.W.Foster - Proton Driver COLLABORATION Will be key to the success of – the SCRF Proton Driver – the LC test facility … and can speed up both if they are the same project.

June 3, 2004G.W.Foster - Proton Driver

June 3, 2004G.W.Foster - Proton Driver JHF 325 MHz 3 MW Klystron JHF 325 MHz RF Quad JHF 325 MHz RFQ and Klystrons for TESLA-Compatible* Front End * TESLA frequency = 1300 MHz = 4*325 MHz

June 3, 2004G.W.Foster - Proton Driver LANL (APT)ANL (RIA)

June 3, 2004G.W.Foster - Proton Driver End-to-End Beam Physics of TESLA-Compatible Linac (P. Ostroumov, ANL)

June 3, 2004G.W.Foster - Proton Driver 8 GeV Superconducting Linac TECHNICAL SUBSYSTEM DESIGNS EXIST AND WORK SNS Cavites (JLAB) FNAL/TTF Modulators “TTF Style” Cryomodules Civil Const. Based on FMI TESLA RF Distribution * w/ phase shifters

June 3, 2004G.W.Foster - Proton Driver Advanced RF Distribution (Coaxial Phase Shifter Option) DIRECTIONAL COUPLER (POWER SPLIT) MAGIC TEE AND CAVITY RF POWER COUPLER CIRCULATOR AND LOAD COAXIAL FERRITE STUB TUNER AND WAVEGUIDE TRANSITION RF FROM KLYSTRON E / YET!

June 3, 2004G.W.Foster - Proton Driver THE NEXT STEP There is a 100% overlap in the plans for the next step of the SCRF Proton Driver and the SCRF Linear Collider: Set up 1 GeV of TESLA linac – At Fermilab – With as many US-built components as possible

June 3, 2004G.W.Foster - Proton Driver Fermilab’s Assets Cryogenics Beamlines Near-term project: SCRF Proton Driver MESON AREA CRYOGENICS TRANSFER LINES MESON CRYO PLANT M-East And M-P Beamlines Immediate Support for (1) TESLA RF Station and (4) TESLA Cryomodules

June 3, 2004G.W.Foster - Proton Driver Recognize the Handwriting? time cryomodules Helen Edwards

June 3, 2004G.W.Foster - Proton Driver Final Questions Is the LC / PD decision point 2008? Impact of LC Technology decision – on collaboration – on US HEP Funding Profile & Schedule depending on whether BTeV does / does not survive reviews…