DCP Command Status Oct 2009. DCP Command Update Phase 2 SBIR completed in June 2009. Successful Tests conducted on both GOES East and GOES 14 Satellites.

Slides:



Advertisements
Similar presentations
Audit. Types Scheduled Audits Programmatic Assurance >Field Monitoring, Annual Reviews Reviews of Partners Financial Records > Spot Checks > Special Audits.
Advertisements

UNIT-V DEFECT PREVENTION Defect prevention (Arun).
AMI Home Area Network Update SAG Meeting March 18, 2014.
Beta Testing: The Contractor’s Perspective Trns·port User Group Meeting October 2005.
Enav.it Session 3 Steps towards the SESAR deployment and the ATM system modernisation.
The FCC’s Healthcare Connect Fund January 30, 2013 Christianna Barnhart Linda Oliver Mark Walker Chin Yoo Federal Communications Commission Wireline Competition.
1 © 2006 Cisco Systems, Inc. All rights reserved. Session Number Presentation_ID Using the Cisco Technical Support & Documentation Website for Voice Issues.
DTC AOP GSI October 1, FY09 Funding Resource/Tasks AFWA (February January 2010): – GSI code management and support (1.1FTE)
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
1 Technology Readiness Maryland /2015 Admin Schedule 2 AssessmentOnline/CBT Testing Dates PARCC - PBAMarch 2 – May 8 MSA ScienceApril 13.
IS&T Project Management: Project Management 101 June, 2006.
1 © 2006 Cisco Systems, Inc. All rights reserved. Session Number Presentation_ID Cisco Technical Support Presentation Using the Cisco Technical Support.
Static Routing Last Update Copyright Kenneth M. Chipps Ph.D.
Colorado’s Surface Water Monitoring System Colorado Division of Water Resources.
1 GOES DCS Status and Information Dan Schwitalla – th Meeting of the STIWG– 18 – 20 May 2009.
DCP COMMAND …bringing two-way communications to your DCPs.
1 © 2006 Cisco Systems, Inc. All rights reserved. Session Number Presentation_ID Using the Cisco Technical Support & Documentation Website for Security.
Damian Leibaschoff Support Escalation Engineer Microsoft Becky Ochs Program Manager Microsoft.
GTRInewFormat.ppt-1 Electronic Systems Laboratory TMC Operator Requirements and Position Descriptions, Phase 2, Kickoff Meeting Presented by Dennis J.
RUDAK DSP Experimentation June & July 2002 Contributions to this presentation by: KK7P, WD0E, 4X1KX.
OFC 200 Microsoft Solution Accelerator for Intranets Scott Fynn Microsoft Consulting Services National Practices.
Web Trnsport – Beta Testing and Implementation TUG Roundtable Discussion Elizabeth Rodgers Info Tech, Inc. October 9, 2007.
Module CC3002 Post Implementation Issues Lecture for Week 2 AY 2013 Spring.
©2004 Deloitte Drop Shipment and Back to Back Order Processes in Oracle 11i July 19, 2004.
1 DCPR Power Ranges Proposed for CS v.2.0 DCS Manufacturers Meeting June 13, 2007 Peter Woolner Noblis
EMI INFSO-RI SA2 - Quality Assurance Alberto Aimar (CERN) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
Three State Data Warehouse 1 Cassie Archuleta Shawn McClure Tom Moore June 20,
1 PETER WOOLNER MITRETEK SYSTEMS KAY METCALF NOAA GOES DCS PROGRAM MANAGER NOAA DECISION BRIEFING STIWG AND TWG NOVEMBER 7-8, 2006 ASHEVILLE, NC.
NESDIS Report Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager May 2, 2012.
LRIT Testing at NOAA/CO-OPS STIWG Oct CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES CO-OPS operates a DOMSAT system at its two regional.
Support for GOES Data Collection System Presentation to the Advisory Committee on Water Information by Charles Kazimir, Chairperson of the Satellite Telemetry.
Project 2003 Presentation Ben Howard 15 th July 2003.
World Community Grid Volunteer Study. World Community Grid Rationale for Study  World Community Grid has been around since 2004  Last significant changes.
Western Air Quality Study (WAQS) Intermountain West Data Warehouse (IWDW) Revisions to WAQS Phase 2 SoW: September 2015 – March 2016 University of North.
A Proposal to Update LRIT to Provide Reliable Rebroadcast Tool for GOES DCS Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager May 12,
2 DCS MANAGEMENT ACTIVITIES UPDATES ON ALL OUR ONGOING PROJECTS OTHER INFORMATION HELPFUL TO USERS ALL ITEMS MAY BE CONSIDERED WORKS IN PROGRESS QUESTIONS.
Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System.
…bringing two-way communications to your DCPs DCP COMMAND.
OHTrac Patient Tracking Carol Jacobson, RN March 31, 2010 EMA Directors Spring Conference 3/31/10EMA 1.
© 2006 DTP PMC; made available under the EPL v1.0 | July 12, 2006 | DTP Enablement Project Creation Review Creation Review: Eclipse Data Tools Platform.
Sprint 108 Review / Sprint 109 Planning June 3 rd, 2013.
Project to Develop GOES DCS User Requirements TWG Presentation By Ernest Dreyer October 28, 2009.
Project management Topic 1 Project management principles.
Installing MySQL BCIS 3680 Enterprise Programming.
NESDIS MANAGEMENT REPORT TO THE TECHNICAL WORKING GROUP (TWG) MAY 19, 2009.
Sprint 107 Review / Sprint 108 Planning May 20, 2013.
1 THE EMWIN TRANSITION April 27, 2004 Angelo Wade, NESDIS Ground Systems.
GOES Data Collection System Status of Version II Transmitter Implementation Information Brief for TWG Kay Metcalf NOAA GOES DCS Program Manager May 12,
Objectives: Define and implement a website layout that enables users to find key information efficiently Develop a process to ensure the sustainability.
1 Emergency Managers Weather Information Network in the GOES-N Era: a Status Report WMO ISS September 2002.
Joint Research Centre the European Commission's in-house science service JRC Science Hub: ec.europa.eu/jrc 38th UNECE IWG PMP MEETING Non- exhaust particle.
DADDS Report Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager May 6, 2014.
TargetProcess - AGILE Project tracking tool Shashwat Gupta CS
Open Source Solutions for Education all materials ©2004 the rsmart group Open Source Applications for Higher Education.
1 Emergency Managers Weather Information Network in the GOES-N Era: a Status Report Satellite Direct Readout Conference for the Americas Miami, Florida.
For Presentation at 28 th APEC Transportation Working Group Meeting Vancouver, Canada Walter Kulyk Director, Office of Mobility Innovation Federal Transit.
NESDIS Report Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager November 17, 2010.
National Aeronautics & Space Administration European Space Agency & 1 Modulation and Coding: Draft IOAG Resolutions to CCSDS September 9, 2008 Les Deutsch.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco PublicITE I Chapter 6 1 Cisco Routers.
Open Educational Resources (OER) Collaborative December 18, 2014.
1 © Charles Schwab & Co., Inc. All rights reserved. Member SIPC ( ). Electronic Trading The Charles Schwab Corporation (Schwab) provides services.
Project Outline I A New CRM database must accomplish the following:  Deliver support resources for internal IT  Integrate all data from existing CRM.
Installing git In Linux: sudo apt-get install git In Windows: download it from run the setuphttp://git-scm.com/download/win.
NESDIS MANAGEMENT REPORT TO THE TECHNICAL WORKING GROUP (TWG) DECEMBER 5, 2008.
Microsoft FastTrack & FY16 Cloud PBX Adoption Offer
How to use the SAP Model Company service
Gemini Re-platforming Project; External User Participation July 2012
EEB 2017 report ‘BURNING: THE EVIDENCE’
Cisco Routers Presented By Dr. Waleed Alseat Mutah University.
Presentation transcript:

DCP Command Status Oct 2009

DCP Command Update Phase 2 SBIR completed in June Successful Tests conducted on both GOES East and GOES 14 Satellites. Release of RF and Framing Technical Details have been done to enable User and GOES Community Review as well as permitting the development of their own receiving platforms. See Sutron’s website under downloads for DCP Command. Funding for Phase 1 Uplink almost complete. Begin on Phase 1 Uplink with completion by late Spring 2010.

Performance Bench testing with noise sources gave the following performance. This showed that the system performs as designed and expected on a simulated link. What was needed next was to run live satellite tests that would add in real world contributions of the satellite and other factors.

Cont’d Performance over the Satellite. A quick check over the satellite was done and preliminary data showed that the system performed well over the satellite with some performance drop (around 1.25 dB) as expected due to the satellite and other contributions such as the above interfering signals. Over the next several weeks, more detailed testing will be done to quantify the performance.

What's Next Deliver Phase 1 uplink in late spring Run detailed over the air Satellite Testing. A Signal Generator was installed several days ago to permit testing of the link. Plan to test over current East and West satellites and the GOES 14 (while available) to compare the different transponders.

Purpose of ‘Phase 1’ Uplink System The Main purpose of the ‘Phase 1’ uplink system is to allow Key Users (STIWG funding partners) to get hands on experience with the operation and performance of DCP Command. Help build interest in the user community to request NESDIS to fast track an operational DCP Command system.

Funding for ‘Preliminary’ System Currently the following STWIG members have either placed a PO or have committed (in some way) to the preliminary test system: NOS USGS USACE USBR NDBC NESDIS

Discussions on Receiver Serial Port Definition Following the last TWG meeting, manufacturers were invited to participate in discussion regarding a ‘recommended’ port connector on the receiver. Discussions led to retain a DB-9 connector with DCE configuration.

HOW TO ACCELERATE DCP COMMAND SYSTEM DEVELOPMENT Implement the ‘Phase 1’ uplink and get STIWG users convinced and excited about DCP Command. Encourage NESDIS to begin Operational Command Uplink System. Encourage other vendors to develop receivers to operate on DCP Command.

Questions?