Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.

Slides:



Advertisements
Similar presentations
Draft CMP ROADMAP S-GRI Madrid 27 th February 2013.
Advertisements

Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Update on EU Tariff Framework Guideline Richard Miller UNC Transmission Workgroup 03/10/2013.
1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative VI. MIBGAS.
North / North West Region Regional Gas Initiative Regulatory Co-ordination Workshop 8 th February 2007.
Gas Regional Initiative North West Region - Short Term Capacity GRI NW SG Meeting Brussels – 26 November 2010.
1 TITRE Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11 th Stakeholder Group meeting GRI.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Framework Guideline on gas capacity allocation Stefanie Neveling, Co-Chair CAM TF 20 th Madrid Forum, 27 September 2011.
Planning for allocation rules and the auction platform NRAs propose to follow a two-steps approach:. 2013: » Based on the wish-list and within the scope.
ACER’s view on the future role of the Gas Regional Initiative Dennis Hesseling Head of the Gas Department, ACER 11 th Stakeholders group meeting of GRI.
GRI North West – RCC Meeting on 28 August Day Ahead – status and legal issues Background Day Ahead pilot project was launched within the ERGEG.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
26 th IG meeting 23 th January 2014 Enagás, REN and TIGF Issues to be discussed.
Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.
7 th IG meeting, South Gas Regional Initiative Madrid, 10 th July 2008 Consultation on Requirements for Gas Interconnection Capacity between Spain and.
European Developments: Capacity Transmission Workgroup 6th October 2011.
Gas Regional Initiative – North West Region London 14 November 2008 Chair: Joachim Gewehr Capacity Project C1 Short-Term Capacity (STC) Initial findings.
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
EU Third Package: background and recent developments 15 th April 2010 UNC Panel European Strategy team.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
Gas Regional Initiatives Getting to 2014 Steven Gordon Head of the Gas Department, ACER 8 th GRI Co-ordination Meeting Brussels, 27 th February 2012.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 24 th of April, 2009 Riga The 3 rd Package – implied changes.
EUROPEAN COMMISSION Transparency – Proposal to amend chapter 3 of the Annex of Regulation 1775/2005 EUROPEAN COMMISSION H. Hick, DG TREN C 2 NW GRI 5th.
Draft CMP ROADMAP 19 SG meeting 30 th April 2013.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Energy Infrastructure Package ERGEG preliminary.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Tom Maes, ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Transit contracts.
Walter Boltz, ERGEG Vice President 18 th Madrid Forum 28 th September 2010 Capacity allocation in natural gas transmission networks Pilot framework guideline.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Cross Border Intraday on the North Italian Borders Introduction Forum Rome, 13 th March 2012.
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28 September 2010 Pilot framework guideline on capacity allocation in natural gas transmission.
Framework Guideline on gas balancing Martin Crouch, Ofgem 20th Madrid Forum September 2011.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
David Halldearn 6 May Background Programme Board initial discussion last year at Stockholm Since then: Further analysis has been undertaken on.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
SOUTH SOUTH-EAST GAS REGIONAL INITIATIVE WORK PLAN Francesco Cariello, AEEG 20 th Madrid Forum, September 2011.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
European Developments Transmission Workgroup 1 st December 2011.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
Michael Schmoeltzer Member of ERGEG Gas Working Group GIE Annual Conference, 6/7 May 2009, Groningen ACER & ENTSOG and their interaction.
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
European Developments Transmission Workgroup 3 rd May 2012.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren 20 th Madrid Forum, 26 Sept 2011.
1 16 th February 2016 Videoconference 35 th IG Meeting South Gas Regional Initiative.
Gas Regional Initiative – North West Region Stakeholders Group meeting - London 14 November, 2008 Capacity Workshop Coordinated Open Seasons Marie-Claire.
Congestion Management
Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011
Public Consultation : main conclusions (1/2)
21st IG Meeting South Gas Regional Initiative
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
26th IG meeting 23th January 2014
Background and Process
Update on European Network Codes
Network Code on Capacity Allocation Mechanisms (Reg.984/2013)
The Incremental Proposal
ACER opinion on ENTSOG’s 2011 Ten-Year Network Development Plan
EU CAM Network Code and CMP Guideline Proposal Update
Presentation transcript:

Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011

2 Pre-Comitology Meeting Bonn – 26 May 2011 Introduction  CAM selected for the pilot project at the 16th Madrid Forum  Letter from the Commission received on 22 September 2009  Consultation on the draft framework guideline launched on 18 December 2009  Final version adopted on 10 June 2010  CAM context: need to improve the access to cross border points  Different allocation rules on the two sides of borders  Different types of capacity products  Domination of First Come First Served  More integration to the benefit of competition and security of supply  Letter from the Commission requesting improvements sent on 9 September 2010  Final version of the pilot framework guideline released on 10 December 2010

3 Pre-Comitology Meeting Bonn – 26 May 2011 Requests from the Commission  The Commission asked for a revision of the Framework Guideline according to Article 6(4) of Regulation 715/2009  “The draft FG does not in all aspects contribute to non discrimination, effective competition and the efficient functioning of the market”  Three months as from September 9  Requests  More harmonisation: market based mechanisms only  Clarification of technical points and contractual issues  Reduce the role of regulators  Issues to be further elaborated  “Technical” parameters reg. bundling of capacities (timing, loss of capacities, relation to existing contracts)  Auction design (reserve price, existing capacities)  Rules for firm vs interruptible capacities  Harmonisation of gas day

4 Pre-Comitology Meeting Bonn – 26 May 2011 Amendments: Role of NRAs and bundling 1.Highest possible degree of harmonisation and minimisation of the role of NRAs  The pilot FG was amended in that direction  NRAs will still have room for decision since the NC cannot cover all potential operational arrangements (Gas Regulation, Article 13(1)) 2.Bundled products  Clarification of ”virtual interconnection points”: capacity at two or more points connecting two adjacent entry-exit systems is integrated into one single capacity service  Virtual interconnection points should not lead to a reduction of capacity  Implementation within 5 years but  Sunset clause: how to organize the bundling of capacity within existing contracts by 5 years after the entry into force of the code: definition of a “default” rule

5 Pre-Comitology Meeting Bonn – 26 May “Sunset clause”  Mandatory bundling of all the technical capacity within five years for shippers  Priority to voluntary agreements  Default rule: if no agreement, TSOs are entitled to split the bundled capacity between original capacity holders proportionally to their capacity rights  Should not entitle contracting parties to cancel supply contracts  A specific impact assessment is going to be launched on the sunset clause and the default rule Amendments: Bundling and sunset clause

6 Pre-Comitology Meeting Bonn – 26 May Auctions as the standard allocation mechanism  Definition of a standard design with possible exemptions  Anonymous and online based auction procedures 5.Reserve price: decided by the FG on tariffs but reference to “regulated price”  Potential over revenues from auctions shall be affected to reducing tariffs, reduce congestions or to incentivise TSOs to maximise capacity offer  Interim period: alternative allocation procedures and duration to be decided by comitology Amendments: Auctions and reserve price

7 Pre-Comitology Meeting Bonn – 26 May 2011 Amendments: new capacity, interruptible, gas day 6. Allocation of capacity yet to be built: auctions not sufficient  Incremental capacity excluded from the scope of the pilot FG  However processes for allocating incremental capacities should be consistent with this pilot FG 7. Clarification of the rules that apply for firm and for interruptible capacity  Priority to firm capacity: interruptible shall not restrict the use of firm capacity  Auctions are the single target model for both  Procedures regarding interruptions will be standardized 8. Clarification of the need for a common gas day  Standard duration for the gas day starting at 6 CET  Further evaluation by ENTSOG left open

8 Pre-Comitology Meeting Bonn – 26 May 2011 Way forward  ACER consultation (completed)  Evaluation of comments (ongoing)  Launch of an impact assessment of the “sunset clause” and the default rule  Questions about the potential impact of the “sunset clause” and the associated default rule: analysis of the legal issues as well as the economic and strategic aspects  Study by an independent consultant sponsored by the regulators  ACER final decision on CAM (Summer 2011)  ENTSOG works in Network Code (until Feb 2012)  Assessment of Network Code by ACER (3 months)  Comitology Procedure (mid/end 2012)

9 Pre-Comitology Meeting Bonn – 26 May 2011 Thank You!