1 WMS Report TO TAC April 2006. 2 In Brief Two Working Group reports Two Working Group reports Two Task Force Reports Two Task Force Reports BENA presentation.

Slides:



Advertisements
Similar presentations
INSULATING PRICE RESPONSIVE LOAD FROM RUC CAPACITY SHORT CHARGE Mark W. Smith J. Kay Trostle August 2008 DSWG.
Advertisements

QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
DSWG Update to WMS May 17, DSWG Goals Update.
ERCOT Load Forecast Uncertainty V2 August 2, 2006.
Loads Acting as a Resource Relationships with QSEs and LSEs
Floyd Trefny Director of Product Development Future of Demand Response In ERCOT A Presentation to the Workshop – September 15, 2006 Project Number
1 PRR 776 in the Context of the ERCOT Market Design Eric S. Schubert Regulatory Affairs Advisor BP Energy Company.
Market Based Solutions for Demand Response Providers Today and the Future Alice Jackson Occidental Energy Ventures Corp.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee September 7, 2006.
32853 Evaluation of Demand-Response Programs in the Competitive Electric Market Workshop 1 September 15, 2006 Shawnee Claiborn-Pinto.
NSRS deployment April John Adams ROS – May 12, 2005.
Special WMS Meeting PRR 525 December 3, 2004 Austin Energy Proposal Leonard Stanfield.
1 CRR Credit Policy Task Force Update TPTF July 21, 2008.
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
ERCOT Demand Side Working Group Mary Anne Brelinsky Eagle Energy Partners.
Report to TAC February In Brief Chair and Vice-Chair for 2009 Chair and Vice-Chair for 2009 Working Group Reports Working Group Reports QMWG QMWG.
1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
1 WMS Report TO TAC March In Brief Three Working Group Reports Three Working Group Reports Three Task Force Reports Three Task Force Reports EILS.
PRS - RPRS Task Force Status Summary - August 14, PRS RPRS Task Force Status Summary Prepared for WMS and PRS August 2006.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
Long Term Solution Task Force TAC Report 5/5/07 Presented by: Bob Wittmeyer - LTSTF Co-Chair.
Demand Side Working Group Chairman Slides June 27, 2008 Mary Anne Brelinsky Vice President 1.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
ERCOT Emergency Interruptible Load Program Paul Wattles Steve Krein WMS Oct. 13, 2006.
Frequency Control Task Force Report to WMS March 22, 2006.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
Resource Adequacy Task Force (RATF) Update to WMS June 12, 2013.
1 WMS Report To TAC May In Brief One Working Group Reports One Working Group Reports Two Task Force Reports Two Task Force Reports One Staff report.
Unit-Specific Bid Limits based on Modified Generic Cost.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2007.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee October 9, 2003.
RPRS TF and QSE Managers Report to PRS 1)Procurement (QSE Managers) 2)Cost Allocation (RPRS Task Force) –PRR 674 –PRR 676 –PRR 678.
Load Resources Negative RRS Bidding in the Nodal Market Credit Working Group January 30, 2008.
1 TAC Report to the ERCOT Board February 16, 2005.
Emergency Interruptible Load Task Force Report to TAC November 3, 2006.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee December 5, 2002.
Report to TAC July In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG DSWG MCWG MCWG MWG MWG QMWG QMWG VCWG VCWG Task Forces Task.
Market Credit Working Group Update to WMS Wed. Nov 18, 2009.
ERCOT Public 1 Overview of ERCOT Concept Paper on Real-Time Co-optimization of Energy & Ancillary Services & Multi-Interval Real-Time Market.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee November 2, 2006.
PRR 705 ERCOT Emergency Interruptible Load Service PRS January 22, 2007.
PRS RPRS Task Force Report from July 27 th Meeting Special PRS Meeting August 2, 2006.
WMS Update Demand Side Working Group Mary Anne Brelinsky Eagle Energy Partners.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
Frequency Control Task Force Presentation to the ERCOT Technical Advisory Committee June 1, 2006.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
1 TAC Report to the ERCOT Board November 14, 2006.
Emergency Interruptible Load Service Paul Wattles ROS Subgroup Feb. 7, 2006.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
1 Frequency Control Task Force Report to WMS July 19 th, 2006.
Demand Side Working Group March 5, 2010 Mary Anne Brelinsky EDF Trading North America.
OOMC and Local RPRS Settlement Alignment January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements.
1 WMS Report To TAC October In Brief One Working Group Report One Working Group Report One Task Force Report One Task Force Report Three Staff.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Credit Working Group Background Information Credit Aspects of Mass Transition Update – February 3, 2006.
CRR Default and the Nodal Market Wholesale Market Subcommittee February 20, 2008.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 7, 2009.
Long-term Solution Task Force Ellis Rankin & Bob Wittmeyer Co-Chairs.
WMS UPDATE CMWG n CMWG has completed their data collection and evaluation of congestion n Based on this evaluation WMS recommends that the same CSCs with.
Day Ahead Market QSE’s Credit Requirements Concerns and Solutions August 14, 2008.
DSWG Update to WMS March 22, Demand Side Working Group Goals.
PRR619 Procedural History DSWG discussed the need to reduce market exposure to default should negative bids be selected and result in negative $/MW MCPC.
Technical Advisory Committee Presentation to the ERCOT Board of Directors April 18, 2007.
TAC Report to the ERCOT Board
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Presentation transcript:

1 WMS Report TO TAC April 2006

2 In Brief Two Working Group reports Two Working Group reports Two Task Force Reports Two Task Force Reports BENA presentation BENA presentation Target Rich Environment for WMS Target Rich Environment for WMS

3 Working Group Reports CMWG Review of Transmission Planning Economic Criteria Review of Transmission Planning Economic Criteria

4 Working Group Reports CMWG Review of Transmission Planning Economic Criteria Review of Transmission Planning Economic Criteria Diagram 2 p S D q P CS PS

5 Working Group Report DSWG Credit Issue Associated With LaaR Bidding

6 LaaR Bidding Behavior Created Credit Issue

7 C B D A Long Term Solutions Evaluated Team reviewed eight potential long term solutions: 1.Revise settlement process and how defaults are processed 2.Revise credit provisions to require protection prior to bidding and create ability to monitor real time 3.Shift credit risk to Resources rather than QSEs 4.Create two separate markets, one for LaaRs and one for Gen 5.Maintain a single market clearing engine, but when LaaR is oversubscribed post separate clearing prices for LaaR and Gen 6.Pay all ancillary services as bid (both Gen and LaaR) 7.Modify current award mechanism for LaaRs; LaaRs offered at a price below MCPC are awarded 8.Eliminate sunset date on short term solution and modify system to reject negative offer prices

8 High Level Overview of Solutions Alternative Resolves Credit Issue Market Cost to Implement Time to Implement Market Participants Impacted LaaR Participation Impact A. Collateralization for Negative Bids Early 2007 C. Single RRS Bid Stack with Separate LaaR and Gen MCPCs if Oversubscribed Early 2007 D. LaaR RRS Offered Below MCPC is Prorated when Market Oversubscribed Late 2006 E. Eliminate Sunset Provision on Current Solution Late 2006 * Icon size represents relative impact when compared with other alternatives.

9 Emergency Load Response Program Update DSWG given assignment to develop ELR Program for a 1 in 10 year loss of load event (LOLE); a probabilistic approach used to determine reserve margins & resource adequacy DSWG given assignment to develop ELR Program for a 1 in 10 year loss of load event (LOLE); a probabilistic approach used to determine reserve margins & resource adequacy Proposed rule (resource adequacy) includes a “backstop” provision for emergency load response (ELR) contracts Proposed rule (resource adequacy) includes a “backstop” provision for emergency load response (ELR) contracts

10 Combined Cycle Task Force Understanding start-up payments Understanding start-up payments Getting RPRS to nominate correctly Getting RPRS to nominate correctly Uniformity in the Claw Back provisions Uniformity in the Claw Back provisions

11 Frequency Task Force Plethora of SCE related PRRs Plethora of SCE related PRRs Holistic look at frequency control Holistic look at frequency control Examination of SCE compliance (PRR525) Examination of SCE compliance (PRR525)

12 Frequency Task Force SCE and frequency control SCE and frequency control SCE and regulation deployment SCE and regulation deployment Load delta and regulation deployment Load delta and regulation deployment Obligations / incentives and frequency Obligations / incentives and frequency Obligations / incentives and regulation Obligations / incentives and regulation Wind Forecast and regulation Wind Forecast and regulation ERCOT RGS signals and SCE ERCOT RGS signals and SCE

13 Frequency Task Force Several PRR related to SCE Several PRR related to SCE Full participation of WMS and ROS Full participation of WMS and ROS Fast track to beat PRR525 market impacts Fast track to beat PRR525 market impacts Continued work on primary frequency Continued work on primary frequency

14 BENA Balancing Energy Neutrality Charge Balancing Energy Neutrality Charge WMS Goal to disaggregate in settlement WMS Goal to disaggregate in settlement

15

16 BENA Balancing Energy Neutrality Charge Balancing Energy Neutrality Charge WMS goal to disaggregate in settlement WMS goal to disaggregate in settlement ERCOT will provide QSE data ERCOT will provide QSE data ERCOT will produce report ERCOT will produce report Intent of the WMS goal is satisfied Intent of the WMS goal is satisfied