Cesar Lugo November 7, 2002 Progress Report (October 17 - 23, 2002) Observed how the eye diagram was affected by changing the bias current of the VCSEL.

Slides:



Advertisements
Similar presentations
Gigabit Ethernet PMD Opto-Link, Inc. – Status Report 9 Vinh Nguyen April 14, 2005.
Advertisements

ECE 135 – The Three Presentation 10 Bryan Chavez with Pat Cleary & Kevin Parker April 14 th, 2005 April 14 th, 2005.
Presenter: Kenny Haulk
Total Power Consumed by an Entire Opto-electronic Link.
Optical Link Budget ECE 4006 Gb Ethernet Optoelectronic Links.
Gigabit Ethernet – IEEE 802.3z The Choice of a New Generation ECE 4006c G2- Gigabit Ethernet Intel/Agilent TX Javier Alvarez, gte006r Astou Thiongane,
Gigabit Ethernet EE 164 Group 2 – Presentation 7 Ungtae Lee April 8th 2004.
Project GabE ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Rahmin Sarabi Adam Durity.
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1 Presentation 5 – Yashar Pirzadeh.
ECE 135 – The Three Presentation 8 Pat Cleary with Kevin Parker & Bryan Chavez March 24 th, 2005 March 24 th, 2005.
Presenter: Curtis Grens. 2 This Week’s Highlights The optical link budget completed and reviewed Financial budget in place Initial VCSELs and PDs ordered.
ECE4006 – Final Presentation Group 6, Spring 2003 Gigabit Ethernet Vikas Parekh.
Optical Gigabit Ethernet Group 4 Presentation 3 February 10, 2005 David Larado.
Optical Gigabit Ethernet Group F.O.R.E. Final Presentation Chris Abbott, Ronen Adato, David Larado 4/21/2005.
ECE 135 Final Presentation The Three … aka Pat Cleary with Kevin Parker & Bryan Chavez April 21 st, 2005 April 21 st, 2005.
Gigabit Ethernet Design ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
Group 2 - Project Update April 1, 2004 Tyler Helble.
1394b Gigabit Ethernet The transmitter Group (G8) Design Proposal Mubin Ansari Zubair P. Siddiqui February 14, 2002.
Laser Drive Needs Total laser current –I TOT = I BIAS + I MOD BIAS Current –Keeps I TOT > I TH (laser “on”) –I BIAS – I TH related to speed Modulation.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 1 Vinh Nguyen January 9, 2005.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 2 Andrew Meyerson February 3, 2005.
Presenter: Nassisa-Geda Techane. 2 Highlights of the Last Two Weeks Midterm paper done! More tests to be performed on the board –Awaiting calibrated optical.
Implementing a 10 Gb/s VCSEL Driven Transmitter for Short Range Applications Irfan N. Ali Michael C. Clowers David S. Fink Sean K. Garrison Jeff A. Magee.
PCB Take-Aways. Take-Aways  Learn and apply systematic approach for assessing and improving process capability using such tools (Minitab and Excel) as:
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 4 Clifton Kerr February 17, 2005.
ECE 4006B Fall, 2002, Group 3, Man Le Progress Report Period (November 15-21, 2002) Finished alignment tolerance testing with Rx board (S7911 and PDT-
ECE4006 Group 6 – Presentation 1 Division of Labor – Vikas Parekh – Group management, project schedule manager, background studies. Gautum Khanna – Analog.
ECE 4006B Fall, 2002, Group 1, Mei Chan Progress Report Period (November 22-December 5, 2002) Receive and complete assemble 2 nd PCB board Complete the.
Presenter: Kenny Haulk. 2 This Week’s Highlights Tested Receiver with attenuation and shielding Measured power output from GDS1250 TX and our own VCSEL.
Single Board Controller Comments Roger Smith Caltech
ECE 4006B Fall, 2002, Group 3, Shahriar Khushrushahi Progress Report Period (September 5 – September 12, 2002) Cleared loose ends with respect to PDs and.
Gigabit Ethernet – IEEE 802.3z The Choice of a New Generation Status Presentation ECE 4006c G2- Gigabit Ethernet Intel/Agilent TX Javier Alvarez, gte006r.
Gigabit Ethernet EE 164 Group 2 – Presentation 3 Ungtae Lee February 19 th /13.
Gigabit Ethernet Design ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
Gigabit Ethernet TxRx ECE Group 2 – Presentation 4 Andrew Tupper February 26, 2004.
Group 2 - Project Update Feb Tyler Helble.
ECE 135 – Group 3 Presentation 4 Bryan Chavez with Pat Cleary & Kevin Parker February 10 th, 2005 February 10 th, 2005.
Optical Gigabit Ethernet Group 4 February 3, 2005 Ronen Adato.
Gigabit Ethernet – IEEE 802.3z The Choice of a New Generation Design Presentation ECE 4006c G2- Gigabit Ethernet Intel/Agilent TX Javier Alvarez, gte006r.
Project GabE ECE 135 – Spring 2005 Patrick Crosby Adam Durity Rahmin Sarabi Omar Al-Jadda.
Piero Belforte, HDT 1998: Advanced Simulation and Modeling for Electronic System Hardware Design Part3
Gantt Chart October November December Step One Step Two
Optical Gigabit Ethernet
SMU MTx Onet 5 Gb eye diagrams
ECE4006 Group 6 – Presentation 5
ECE4006 Group 6 – Presentation 9
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
George Hadley Kelli Hacker Sean Ma Jacob Champion
Gigabit Ethernet Design ECE 4006C – Spring 2003
Capstone Design Update
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
ECE 4006 CAPSTONE DESIGN R.Y.M.M.Y Georgia Institute of Technology
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1
Presenter: Allen Duncan
Gigabit Ethernet Design ECE 4006C – Spring 2003
Post-PCB Submission Progress Briefing
ECE 4006 Group 6 – Presentation 8
Project GabE ECE 135 – Spring 2005
Capstone Design Update
Optical Gigabit Ethernet
Status Presentation February 20-27, 2003 Michelle Middleton.
PLANNED WORK for week #10 (week of Oct. 28 – Nov. 3) PROGRESS
Progress Report (October 2 - 9, 2002)
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
Project GabE ECE 135 – Spring 2005 Presentation 10
Task List Group management plan Background studies
Project GabE ECE 135 – Spring 2005 Week 9
Capstone Design Update Week 9 ECE 4006 – Group 1
Presentation transcript:

Cesar Lugo November 7, 2002 Progress Report (October , 2002) Observed how the eye diagram was affected by changing the bias current of the VCSEL Observed how the eye diagram was affected by changing the modulation current of the VCSEL Prepared both boards for alignment testing Progress:

Cesar Lugo November 7, 2002 Planned Work (October , 2002) Alignment testing for VCSELs Alignment testing for PDs Submit redesign of PCB –Making a shorter path for I mod –Removing some of the ground plane under Pd to reduce capacitance –Removing extra power supply connector –Eliminate cap on POR pin on the laser driver Planned work:

Cesar Lugo November 7, 2002 Gantt Chart

Cesar Lugo November 7, 2002 Eye Diagrams of Various Bias Currents I bias mAI bias 10.0 mA I bias 8.55 mAI bias 7.3 mA

Cesar Lugo November 7, 2002 Eye Diagrams of Various Bias Currents I bias 6.05 mA I bias 3.74 mA I bias 5.03 mA I bias 4.37 mA