Update from Birmingham Phil Allport, Daniel Briglin, James Broughton, Andy Chisholm, Laura Gonella, Kostas Nikolopoulos, Simon Pyatt, Juergen Thomas, John.

Slides:



Advertisements
Similar presentations
Endcap assembly update C Buttar UK-SCT-MB RAL 2 nd Sept 04.
Advertisements

News from B180: DC-DC Stavelet with HV MUX One hybrid shows ~20ENC extra noise, others much the same. Not yet understood - investigations continue Carlos.
JED Microprocessors Pty Ltd Presenting the JED T430 low-cost Projector Controllers Nov 22nd, 2009.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
MICE Target Electronics & DAQ Update P J Smith University of Sheffield 2 nd December 2009.
MOM Summary 11/01/10 Due to the Inclement Weather it has perhaps been quieter than usual Water - Tank has been holding water fine. Some ice has been forming.
Status of Electronics & Control System P J Smith University of Sheffield 16/12/2009.
GeneXpert Installation and Xpert MTB/RIF Set-up
2 May 2013 Juergen Thomas: ATLAS Tracker Upgrade Module Chip-Bonding and Test Setup 1 ATLAS Tracker Upgrade: Hybrid Wire-Bonding and Test Setup at Birmingham.
Received new "130nm" jigs from Liverpool and after the "module workshop" 25/3/15 at Liverpool and ready to make dummy modules New jigs need to be slotted.
Ladder QA manual. Check items 1 Interlock - Temperature of NOVEC. ✓ Check the difference from the value where the QA in RIKEN was performed is less than.
Disk testing - status. Disk Test Setup we use similar setup as the one used for sector tests, only simplified (no C6F14 cooling system, no source test,
CIS 103 — Applied Computer Technology Last Edited: September 17, 2010 by C.Herbert Wireless Home Networks.
Setting up the Ricoh C305 Press F5 to start the Presentation
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
Stavelet Update Peter W Phillips 29/07/2011. Serial Powering with a Stavelet Module: Recent Results Whilst single SP modules in the “chain of hybrid”
12 Aug 2013 ATLAS Tracker Upgrade Status Birmingham 1 - Small vacuum pump holding hybrid flat on panel (which it is ‘strong enough’ to do) - Since picture.
Preparations for Irradiation of ABCN250-Hybrid (1) 10 th August 2015, Petal/Stave Meeting Following-up on Craig’s plans for irradiation at the B’ham cyclotron:
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
Andy Blue Glasgow Update. Andy Blue WP3 Meeting Summary ESD Protection –Part all arrived and installed Compressed Air Controls –New lines and panel being.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
Petalet-Stavelet; 13 July Birmingham Update Gluing to mechanical sensor with Epolite (as reported earlier). 1 st hybrid – too much glue on stencil.
Birmingham Update Module bonding (Sam and Simon) Great difficulty bonding on to patterned glass ASICs. (OK on sensor). After 1 st two rows of bonds, abandon.
High Gain Mystery of WS(1-5) Solved (Hopefully…) C.Woody HBD Meeting April 13, 2010.
Design and Detailed Plan for In Vacuum Diamond Sensor for PHIL and ATF2 S. Liu, P. Bambade, F. Bogard, P. Cornebise, I. Khvastnov, H. Monard, C. Sylvia.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
MINERvA Status Report Deborah Harris, Gabe Perdue, Kevin McFarland, Jorge Morfin October 15, 2009.
Birmingham update: making modules? ASICS to hybrid Gluing: many trials i) heated plate with silver loaded (8 hybrids i.e. 1 panel per day) ii) UV cured.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
ATLAS UK Tracker Upgrade AIDA-2020 Transnational Access Facility
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Thermo-Mechanical Modules 10 th August 2015, Petal/Stave Meeting Strip Module Meeting; 26th October Phil Allport, Matt Baca, Daniel Briglin, James.
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
Gluing trials continuing: Loctite is favourite (for Dispensemaster) Bonding: exercising the machine; practising in laying down patterns (Simon and.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
US stavelet update 12th April PPB2s on serial power side 12 Apr SAMTEC connector (floating) Bond pad (connected to EoS through WB + bus tape.
Electronics for CEDAR Cristina Lazzeroni, Marian Krivda, Richard Staley, Xen Serghi, Karim Massri University of Birmingham, UK 3/5/
Thermo-Mechanical Modules 10 th August 2015, Petal/Stave Meeting Strip Module Meeting, 9 th November Phil Allport, Matt Baca, Daniel Briglin, James.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
Chris BoothUniversity of Sheffield 1 Target Status & Progress 1 st February 2006 Disappointingly slow progress over last 2 months. However, progress is.
TM Module Measurements (1) 10 th August 2015, Petal/Stave Meeting Strip Module Meeting; 26th October Phil Allport, Matt Baca, Daniel Briglin, James.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
Berkeley status Aug 10th, 2012.
Detector building Notes of our discussion
INSIDE in-beam PET system assembly and test at INFN Torino
→ need to guide UV light into gap; also beware temp effects
+ Steve Worm (since Monday)
MICE Target Report Video Conference 29/11/07
Injectors BLM system: PS Ring installation at EYETS
ITK Strip Module Meeting; 12st October 2015
Mini-drawers, FE-ASIC , Integrator
Online Software Status
DT Infrastructure: LV, HV, Gas
22/06/2016 Andy Blue & Maeve Conway (Ohio State)
Status of the CERN ALIBAVA System
Group meeting, 2nd Sept, 2013; JAW
Update from Birmingham
TMB, RAT, and ALCT Status Report
Presentation transcript:

Update from Birmingham Phil Allport, Daniel Briglin, James Broughton, Andy Chisholm, Laura Gonella, Kostas Nikolopoulos, Simon Pyatt, Juergen Thomas, John Wilson WP3 Meeting 4 Feb 2016

OGP SmartScope: Now operational New SmartScope is now installed and operational. Setup/calibation done by engineer Tue/Wed this week. Model: “OGP SmartScope CNC 500 Multi-Sensor Measuring Machine with DRS Laser Package including DRS Laser Adapter and sensor” Hoping to profit from experience at other groups (eg Sheffield) to get going quickly. 2 Birmingham Update WP3 Meeting, 4 Feb 2016

DAQload with HV bias Keithley 2410 (normally used with AliBaVa) connected to power adapter on DAQload, fortunately same HV connector. Room darkened, sensor however not ideally covered from external light. Test: StrobeDelay40 → 3PointGain 1fC for each HV bias voltage (not full partA, lab session with Yr4 students). Results seem fine. More detailled tests to follow, esp I-V curve. 3 Birmingham Update WP3 Meeting, 4 Feb 2016 HV Bias [V]Noise Mean [ENC]

130SingleChip Irradiation Preparations (1) Latest Status  Please note: Stage control boxes and PC of coldbox are at Sheffield (Hector, Sam) for checks and repair this week. To be reinstalled next Mon/Tue. Currently not possible to do cooling as 'Norhof N2' control device s/w is also on that PC.  While we have full setup for irradiation of 130SingleChip (currently KH_002) ready, not enough time for irradiation before ITK Week. First priority is TID which takes some time (see Laura and Craig's irradiation plans /talks). We're not the only users of the cyclotron beam. We have however scheduled another cooling test next Wed, and booked many days after ITK Week  News since last WP3 meeting: Moved Atlys/130DriverBoard into very low rad area ~6m from coldbox). TTI CPX200DP PSU to power 130Driver (and hence the chip) moved into cyclotron 'vault', enabled remote-control of PSU ('DCS: LV' panel in 'BurstData' GUI) through USB, works fine (thanks Peter for advice). Current and voltage also written into regular log file.  Data cables: – Using ~6.5m of this: ”Amphenol Spectra-Strip ”, Mouser.co.uk part number: , for both 40-way and 50-way cables. Very limited choice of 0.025inch tw. pair cables. Unshielded, but routed far from other cables. Fitted 3M connectors. – Using Laura's adapter to route high-speed signals from 40-way cable through Cat6 network cables (Toronto/CHARM wiring) (Two of those sent to RAL). – 'overnight/partA' tests work fine 4 Birmingham Update WP3 Meeting, 4 Feb 2016

130SingleChip Irradiation Preparations (2): Pictures 5 Birmingham Update WP3 Meeting, 4 Feb 2016

ABCN250 Hybrid: (Second) Post-Irradiation test  4 th chip ('Chip3') on top row of 250-hybrid (B1_H0) on single-hybrid-panel was irradiated with 250 Mrad on 13 th January. Released back to us only this week (radiation levels sufficiently low).  Didn't use nickel foil in front of hybrid (we forgot). Since then, sensor irradiation results show it is advisable to use in addition kapton tape and also aluminium (~300 μ m) foil, in front of device  Very preliminary tests (SD40->3GP1fC) show all chips still responding (after usual trick: Ramp VCC slowly and restart DAQ). Readout for upper row of chips seems compromised after irradiation, messy NMASK pattern from Chip3 downstream (though ok-ish raising VCC from 3.6 to 3.8V), bottom row still fine. Very slow readout for SD25.  Issues need more careful investigation. Input Noise of irradiated chip seems ok-ish (~420 ENC), but big jump in Gain (100->140).  Possible to irradiate another chip on this hybrid (but priority very much below 130SingleChip campaign) 6 Birmingham Update WP3 Meeting, 4 Feb 2016