Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July 2007 1.

Slides:



Advertisements
Similar presentations
CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Valencia May
Advertisements

Signing LOI for ILD detector concept at ILC Deadline LOI submits march 31st 2009.
LBNE Reconfiguration Jim Strait, LBNE Project Director Fermilab Community Advisory Board August 23, 2012.
Keynote Workshop Charge Akiya Miyamoto, KEK 16-April-2009 ILD Software Workshop.
ILCSC Report KILC12 / Daegu Jonathan Bagger Chair, ILCSC Johns Hopkins University 4/23/12.
Global Design Effort Goals and Introduction Andrei Seryi, SLAC, September 17, 2007.
Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
J. Brau ALCPG Workshop at Snowmass August 27, Concluding Remarks 2005 ILC Physics and Detectors Workshop at Snowmass.
山本 均 Hitoshi Yamamoto 東北大学 Tohoku University 北京、十一月二十三日、二 00 六年 Beijing, Nov 24, 2006 WWS Report MDI Report.
ILCSC and WWS News David J. Miller: ILCSC news for MDI workshop, 6 January ILCSC Membership Recent ILCSC meetings Worldwide Study Plans.
RD’s Report on the status of physics/detector activities ILD Sakue Yamada May 23, 2012 Sakue Yamada.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
 k0k0 ++ -- -- p ILC Technical Design Report Physics and Detectors – Detailed Baseline Design Juan A. Fuster Verdú, IFIC-Valencia PAC Meeting, KEK.
Software Common Task Group Report Akiya Miyamoto KEK ALCPG09 30 September 2009.
ILCTRP WWS  ILCSC D.J.Miller for WWS; 16/11/ Report to ILCSC from the World-Wide Study of Physics and Detectors for a Linear Collider. 1.Proposed*
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Towards an International Linear Collider Barry Barish GDE 6-June-07.
J.C. Sheppard, SLAC Americas Region January 31, ILC Reference Design Report Status 2nd ILC Positron Source Collaboration Meeting IHEP, Beijing,
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
Worldwide Study Organizing Committee Report from Worldwide Study on Physics and Detectors ICFA meeting, Beijing August 2004.
Charge to the Workshop (and a report from WWS) Hitoshi Yamamoto July 11, 2005 ACFA8, Daegu, Korea.
Status of Linear Collider Activities Rika Takahashi on behalf of the LC Communicators 104 November, 2013 Interactions US.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
Our mandate has been completed The physics and detector perspective of the ILC-TDR Sakue Yamada May 27, /05/271Sakue Yamada ECFA.
1 1 LCC Physics and Detector Hitoshi Yamamoto ECFA LC2013, DESY May 27, 2013.
Status of ILC detector/physics activity Sakue Yamada Apr. 24, /4/241Sakue
7 August, 2006Gakujyutsu Sousei Monthly Meeting1 The Detector Chapter of The Detector Concept Report 学術創成定例月会議 8月7日 宮本彰也.
Preparing for the SiD LoI SiD Parallel Session TILC08 March 5, 2008 John Jaros.
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
World Wide Study of Physics and Detectors for a future e + e - Linear Collider David J. Miller; towards a WWS response to ILCSC/ICFA How do we propose.
1 BDS and Detector schedules for discussion at MDI meeting August 15, 2006 Andrei Seryi with input from Martin Gastal, Yasuhiro Sugimoto et al.
Report from ILCSC Shin-ichi Kurokawa ILCSC Chair LCWS06 at IISc Bangalore March 9, 2006.
Report from ILCSC Shin-ichi Kurokawa KEK ILCSC Chair GDE meeting at Frascati December 7, 2005.
ACFA-7; Taipei, Nov 2004 H.Weerts Kick-off The Si licon D etector Design Study SiD Organization & Status H.Weerts Fermilab/Michigan State Univ. SiD kick.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
General news, future LC organisation, update on CDR Vol3… Lucie Linssen L. Linssen, CLIC physics and detector monthly meeting, May 14th
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
WWSWWS The WWS Roadmap for ILC Detectors by F. Richard LAL/Orsay.
CHARGE TO THE 2007 LINEAR COLLIDER WORKSHOP Jim Brau University of Oregon DESY Hamburg May 30, 2007.
WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
GDE Status / Plans & ILC Timeline Barry Barish FALC 11-July-07.
1J. Brau - ILCSC Meeting - Beijing - August 19, 2004 Organizing the Global Experimental Program The ILCSC has asked the Worldwide Study, as its Physics.
Report from Worldwide Study and Charge to the Workshop ACFA04, Taipei 11/8/2004.
February, INP PAN FCAL Workshop in Cracow W. Lohmann, DESY The BCD (Baseline Configuration Document) The next calendar dates Where we are with FCAL.
Recent Development of Detector Activities for ILC CCAST07 Nov Introduction Call for LOI & mechanism of selection IDAG Benchmarks Common.
1 Design Activity of Large Detector for ILC July 18, 2007 Yasuhiro Sugimoto KEK.
1 BILC07/ACFA Charge Hitoshi Yamamoto BILC07, Beijing
1 ILD – A Large Detector for ILC Mar. 3, 2008 Yasuhiro Sugimoto KEK.
1 ILD – A Large Detector for ILC Nov. 6, 2007 Yasuhiro Sugimoto KEK.
3 October, 2006GLD Meeting1 The Detector Chapter of The Detector Concept Report GLD Meeting 3 October, 2006 Akiya Miyamoto.
ECFA - European Commitee for Future Accelerators Tatsuya Nakada – EPFL, Switzerland– prepared for CERN September Council presented by.
Report from SB2009 Working Group Akiya Miyamoto 8-July-2010 DESY ILD Software and Integration Workshop.
Global Design Effort Progress and Plans of the Beam Delivery Systems and Machine Detector Interface WG Daniel Schulte (CERN), Brett Parker (BNL), Andrei.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
J.C. Sheppard, SLAC Americas Region February 7, ILC Source Systems Work Packages and EDR Discussions ILC GDE Meeting IHEP, Beijing, China J. C.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
Global Design Effort Accelerator System Kick-off Meeting e- Summary Day 1 25 Sept 2007 SLAC Marc Ross.
Status of the DCR Detector Chapter International Linear Collider (ILC) Workshop ILC-ECFA and GDE Joint Meeting in Valencia 7 November 2006 Detector Concept.
CERN Neutrino platform 24 th July, 2014 S. Bertolucci CERN.
Nouvelles Récentes. 2 WWS WorldWide Study on Physics and Detectors for Future Linear Colliders  Recognize and coordinate studies on whole detector concepts,
The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.
Oct 22 Group Leaders Planning meeting
For ILD joint steering board
The DBD: Outline and Scope
Yasuhiro Okada, Executive Director, KEK
Barry Barish Paris ICHEP 24-July-10
Presentation transcript:

Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July

Jim Brau Workshop Charge LCWS07, Fermilab May 30, The GDE Plan and Schedule RDR: We are Here Next: EDR

Reference Design Report 3 Vol. 1 Executive Summary Vol. 2 PhysicsVol. 3 AcceleratorVol. 4 Detectors Final Release is at Daegue, August The latest draft: (Asian mirror site) ~680 pageshttp://ilc.kek.jp/RDR Links to the draft version for physics and detectors available at Authorship: those who have contributed, plan to contribute, or just want to support the project, are welcomed to sign up from

ILC Configuration 4 ~31km Layout for E cm =200~500 GeV, L~2x10 34 cm -2 s -1 Pulse rate = 5Hz, 1000~5400 bunches in ~1msec pulse 1 IR is shared by two detectors Beam crossing angle – 14mrad

Detector Concepts 5 LDC SiD 4th GLD Detector concept team is not a collaboration.

Detector Concepts 6 TrackingECalInnerRadiusSolenoidEMCalHadronCalOther SiDsilicon 1.27 m 5 Tesla Si/WDigital(RPC..) Had cal inside coil LCDTPCgaseous 1.68 m 4 Tesla Si/WDigitalorAnalog Had cal inside coil GLDTPCgaseous 2.1 m 3 Tesla W/Scin.Pb/Scin. Had cal inside coil 4thTPCgaseous 1.4 m 3.5/1.5crystal Multi- fiber readout DoubleSolenoid (open mu) See Detector Outline Documents for details - /

ILC Detector Roadmap ILC detector roadmap has been discussed in ILC community, WWSOC and ILCSC since last year Boundary conditions ILC IR design needs input from detectors.  Can push-pull scheme works ? Beam stability ? Magnet fields ? … Detector construction will take similar time as accelerator.  Accelerator will take ~ 7 years. Detectors are assembled on surface similar to CMS. But CMS took ~ 6 years for construction Detectors should be prepared in phase with the accelerator  Detector EDR in ~2010 GDE will prepare (ready for the project approval ) EDR in 2010 Openness of the detector program should be maintained 7

ILC Detector Roadmap - 2 Summer 2007  ILCSC announces call for LOI due Summer LOI is “to express an interest to design, engineer and eventually build a detector at the ILC” Summer 2008  Detector design teams submit LOI. End 2008  Two detector designs recognized for development toward the engineering design phase. ~2010  Engineering designs completed for two detectors in a synchronized way with the accelerator EDR. 8 − The process is open to new comers to join. − Some sub-detector technologies choices may be open. Road map endorsed by ILCSC in June 2007

Exp. Program Management ILCSC: A body to oversight the global effort of ILC, including the experimental program. WWS is a bottom-up organization and has been guiding the experimental program. In order to enhance the executive authority and its accountability with respect to the ILCSC in the era beyond the RDR, ILCSC has decided to appoint the Research Director. Research Director  Appointed by and reports to the ILCSC  Responsible for the experimental program.  Advisory / Review structure : under discussion 9

Today’s Program Introduction Akiya Miyamoto, KEK GLD-LDC Detector Concepts, Yasuhiro Sugimoto, KEK SiD Concept and detector R&D in the US Harry Weerts, ANL 10