0 2013 LoA Verification Plan & Status ContractorDirectorPlanned DatesStatus 1.Al Turki ONDCompleted 2Dalma UWDCompleted 3Petrogas GDCompleted 4MHD UIDPlanned.

Slides:



Advertisements
Similar presentations
SIEP HSE Management System
Advertisements

Contractor Safety Management
Health and Safety Manual Section L6 Legionella. Legionella L6 is a single set of standards for the management of Legionella bacteria, based on the HSE.
Health and Safety Executive Control of Legionella Howard Whittaker Principal Inspector FOD Leeds.
THE PRINCIPLES OF QUALITY MANAGEMENT. DEFINING QUALITY Good Appearance? High Price? The Best? Particular Specification? Not necessarily, but always: Fitness.
Key changes from OHSAS 18001:1999
©2014 Al Jaber Group - Private and Confidential Contractor Management Peter.
Hitting the Leadership Target Through Leadership and Accountability.
LoA Verification Plan & Status ContractorDirectorPlanned DatesStatus 1.Attila Dogan (ADS) OND24 th to 31 st Marcompleted 2Vanguard (VRSS) UWD21.
Project Specific Safe Work Plan Team Engagement Starts HERE!
MANAGING HSE IN CONTRACTS 2016
MSE4 Technical Safety Engineering Framework. Technical Safety Function – Core Activities CFDH Skill pool management Skill-pool health – Job Descriptions,
MANAGING HSE IN CONTRACTS 2016 GU140 (C9). 01 PR1171 PART I & PR1171 PART II Contract HSE Management – Mandatory for CH and Contractor 03 PR1997 Contractor.
Always start a vehicle correctly
Beware of hazards around you
Take regular breaks when driving long distances
Safety Leadership for Front Line Supervisors (FLS)
Ensure a safety briefing is given where appropriate
PDO Second Alert What happened? Your learning from this incident..
Keep a safe distance between the vehicle in front
Competence Pack Guide to Assessment.
PDO and Contractor Partnership
PDO Second Alert What happened? Ensure you are out of the danger zone
Competence Can Do or Have Done!. Competence Can Do or Have Done!
Don’t pull a twisted sling
Never place yourself in line of fire
MANAGING HSE IN CONTRACTS 2017
MANAGING HSE IN CONTRACTS 2017 GU140 (C9)
Do not work at height without fall protection
PDO Second Alert Date: Incident type: LTI What happened?
Ensure loads are secured as per SP 2001 Factsheets
PDO and Contractor Partnership
Follow Management of Change for an activity which is not in permit
PDO Second Alert Date: Incident: LTI What happened?
Competence Pack Guide to Assessment.
Always use the right equipment for the task !!!!
Follow the rules to save a life
Ensure OHL Clearance required for your lifting activity
PDO Second Alert Date: Incident title: Fatality What happened?
PDO Second Alert Date: Incident title: LTI What happened?
Adequate tethered tools
PDO Second Alert Photo explaining what was done wrong
UWD Assurance Program Objective: Introduce CCC tool.
Always report Near Misses
Always drive to the road conditions!
HSE Competence Assessment/Development Process
Always drive to the road conditions!
PDO Second Alert Date: Incident title: HiPo What happened?
Ensure that all Rig moves are carried out by competent personnel
PDO Second Alert What happened? Your learning from this incident..
PDO Second Alert Date: Incident title: HiPo What happened?
Your health is your responsibility
PDO Second Alert Date: Incident title: MVI Rollover
Check equipment prior to start the job
PDO Second Alert Photo explaining what was done wrong
Always follow defensive driving techniques
PDO Safety Advice Date: 23/08/2015 Injury: Fractured fingers
Always keep your equipment maintained
Effective communication prevents incidents
PDO Second Alert What happened? Your learning from this incident..
Do not drive underneath overhead lines without permission.
Keep away from “Line of Fire”
Your safety should always be built on SOLID ground
Gas test before welding
Vehicles to Keep Safe Distance at all times
Driving rules are for saving lives – adhere to it always
Beware of raised edges of walk ways.
Slow down and always drive to the conditions of the road.
Use hands-off where possible
Management commitment and responsibility Safety accountability of managers Appointment of key safety personnel SMS Implementation Plan Coordination.
Presentation transcript:

LoA Verification Plan & Status ContractorDirectorPlanned DatesStatus 1.Al Turki ONDCompleted 2Dalma UWDCompleted 3Petrogas GDCompleted 4MHD UIDPlanned 5Cactus UWDPlanned 6G Beijing UWD 7Dawood OSD 8Larsen Toubro OSD 9Petrojet OSD 10Abed UWD

LoA: Mid year Findings Analysis AREAS OF LOW EBS

LoA: Mid year Findings Analysis ISSUEREMARKS Sub contractor ManagementPoor prequalification and monitoring. (Of understanding - once approved by PDO, no need to prequalify) Competence Assessment & AssuranceExpectations here are not clear with contractors Identifying & Assessing HSE critical PositionsMeaning of HSE critical positions is not clear with contractors Compliance to training MatrixUpdating and implementing action plans to close gaps Compliance with FTW as per SP 1230Term FTW & expectations - not very clear to contractor Mixing terms of HEMP and updatingMixing of terminologies, poor coverage of applicable hazard, underrating risks Waste managementWrong application of consignment notes and waste not segregated at source EMERGED COMMON AREAS OF CONCERN WITH CONTRACTORS

LoA: Mid year Findings Analysis ISSUEREMARKS HSE Controls for non-self supervising contractors (mode2&3?) need to be clarified Current HSE controls are mainly geared for Self managing contractors Small but High/Medium HSE risk contracts may not be audited during their lifecycle with PDO. Some found not to have been audited at all since engagement Checking of Omanisation percentageIn some contracts Omanis are not very visible Harweel Area Emergency Planning may not meet expectations. Escape routes first leads towards Harweel station. Contractor staff are not provided with Extra BA as provided to PDO staff On extension the extended contracts continue with the use of old documents. Same Terms and Conditions. C09 requires application of updated documents. FTW for PDO staff – is it done?? PDO LEARNED LESSONS