Upcoming Shift Work at ATF (November 26 – December 21, 2007) and Remote Participation from SLAC ATF training shifts proposal Rob Appleby (contact person,

Slides:



Advertisements
Similar presentations
ILCDR/CesrTA meeting Low Emittance Tuning 報告 K.Kubo.
Advertisements

Coupling Correction in ATF2 EXT 7 th ATF2 Project Meeting, december 2008 C.Rimbault, LAL Orsay.
Emittance Measurement Simulations in the ATF Extraction Line Anthony Scarfe The Cockcroft Institute.
ATF2 FB/FF layout Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 11, 2007.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
Status of very high priority beam tuning software Special ATF2 project meeting, Korea, 1 st October 2008 Cécile Rimbault, on behalf of High Priority task.
1 Proposal for a Multi-Optical Transition Radiation System in ATF2 A. Faus-Golfe, D. McCormick IFIC – SLAC 11 June th TB/SGC Meeting.
Global Design Effort Experience on Remote Participation in ATF/ATF2 work ATF2 weekly meeting, May 16, 2007 Janice Nelson, Mark Woodley, Sergei Seletskiy,
Kicker Optics – or – Selected ATF-II EXT Line Performance Issues ATF-II Technical Review, April M. Woodley1/40.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
ATF2 commissioning in Autumn 2009 for discussion Philip Bambade LAL & KEK LCWS09 BDS session Albuquerque, New Mexico October 1, 2009 on behalf of the commissioning.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
August 9, 2007M. Palmer1 CESR Machine Studies Planning Overview Principal Projects Other Milestones and Dates Machine Studies Schedule Proposed Plan.
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman.
Y. Ohnishi / KEK KEKB LER for ILC Damping Ring Study Lattice simulation of lattice errors and optics corrections. November 1, 2007 Y. Ohnishi / KEK.
T. Okugi and M. WoodleyDecember 21, th ATF2 Project Meeting Summary of Session on Hardware/Devices for Commissioning.
Fifth ATF2 Project Meeting, dec. 2007, KEK, Japan Emittance measurements with multiple wire-scanners and quadrupole scans in ATF EXT C. Rimbault,
ATF Instrumentation Status and Planning 3 December 2007 Juan Cruz, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, John Wray.
Summary of Commissioning and Tuning session Philip Bambade LAL-Orsay 5 th ATF2 project meeting KEK, 21 December 2007.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Mark Woodley, SLACATF2 Project March 20-21, Summary of Tuning, Corrections, and Commissioning.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
Highlights and discussion at LAL FKPPL & FJPPL “Toshiko Yuasa” workshop Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay,
CARE Governing Board R. Aleksan CARE Governing Board Meeting, November 25, Introduction et objectives.
Emittance Measurements and Related Experimental Results 15th ATF2 Project Meeting, January M. Woodley1/44.
The ATF Damping Ring BPM Upgrade Nathan Eddy, Eliana Gianfelice-Wendt Fermilab for the ATF Damping Ring BPM Team.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
1 ATF Instrumentation Status and Planning Justin May, Juan Cruz, Doug McCormick, Janice Nelson, Tonee Smith, John Wray 1.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004.
Status of the ATF Damping Ring BPM Upgrade Project Manfred Wendt for the ATF DR BPM collaboration.
18 December 2007 ATF Damping Ring BPM System Upgrade Joe Frisch, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, Mark Woodley (SLAC) Charlie Briegel,
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
J. Brossard, C. Rimbault a P. Bambade LAL / / 8-9 nov LAL 1 Exercising emittance measurements in the ATF EXT line Upgrade.
Cavity Alignment Using Beam Induced Higher Order Mode Signals in the TTF LINAC Olivier Napoly, Rita Paparella CEA/DSM/DAPNIA, Gif-sur-Yvette Marc Ross,
ATF2 Software Review LAL June SHORT SUMMARY - Philip Bambade ATF2 weekly meeting July
CesrTA Status Report Mark Palmer Cornell University September 2, 2009.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
Orbits, Optics and Beam Dynamics in PEP-II Yunhai Cai Beam Physics Department SLAC March 6, 2007 ILC damping ring meeting at Frascati, Italy.
ATF DR BPM Upgrade Janice Nelson, Doug McCormick, Justin May, Andrei Seryi, Tonee Smith, Mark Woodley.
ATF status M. Ross October 15, 2004 The ATF is the largest test facility built exclusively for linear collider RD –Utility not reduced by the selection.
Emittance measurements with multiple wire-scanners and quadrupole scans in ATF EXT C. Rimbault, Brossard, P. Bambade (LAL) Main goal : - Try to improve.
ATF2 Software Review LAL June 2008 Philip Bambade & Glen White ATF2 weekly meeting June
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
Status of EXT coupling measurement analysis 9 th ATF2 project meeting C.Rimbault (LAL) S. Kuroda, T. Tauchi, N. Terunuma (KEK), G. White, M. Woodley (SLAC)
For discussion of ATF2 beam time requests SLAC team October 1, 2008.
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
Collaborations on Beam Instrumentation R&D – A personal view – Manfred Wendt Fermilab 11/21/2008Project X Instrumentation WG1.
LCLS-II Injector layout design and study Feng Zhou 8/19/2015.
Tuning Knobs for ATF2: An Update Anthony Scarfe, James Jones The Cockcroft Institute LCWS’07 31 st May 2007.
Low-Emittance Tuning at CesrTA Jim Shanks Cornell Laboratory for Accelerator-Based Sciences and Education.
2nd ATF2 Project Meeting (May 30, 2006)M. Woodley [SLAC]1 ATF2 Layout/Optics (v3.3) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
Technical Board Summary Preliminary Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 project meeting, Technical.
4 th ATF2 Project Meeting, 31 May 2007 A. Seryi 1 Summary of SLAC simulation study of emittance growth in the ATF extraction line SLAC team: J. Amann,
M. Woodley ATF Studies Meeting (April 30, 2008) 1 QM7R Vertical Bump Study March 14, 2008.
Special ATF Session - ATF/ATF2 day on 28th September -
ATF/TTF Instrumentation March 19, 2007 Last report: January 22, 2007
Estimating the effects from non-linearities in the ATF extraction line
ATF/TTF Instrumentation Nov. 27, 2006 Last report: Oct. 2
Oversea collaborators
Tuning and Alignment of the ATF2
3rd ATF2 Project Meeting, December 18-20, 2006
Strip-line Kicker R&D at KEK-ATF
ATF Extraction Septa Magnetic Modeling with ANSYS
Feed forward orbit corrections for the CLIC RTML
Presentation transcript:

Upcoming Shift Work at ATF (November 26 – December 21, 2007) and Remote Participation from SLAC ATF training shifts proposal Rob Appleby (contact person, Cockcroft Institute/University of Manchester, England Mark Woodley SLAC, USA Involved institutes: KEK (contact Kuroda-san) LAL (contact P. Bambade) IFIC (contact A. Faus-Golfe) CERN (contact F. Zimmermann) Shift time required: 4 shifts required in week starting 26 th November 2007  Shift 1: control system familiarisation, layout and structure, injection of beam into DR, extraction to EXT  Shift 2: read the orbit of beam in DR and EXT, reading machine state (Twiss/R)  Shift 3: creation and measurement of DR and EXT bumps, EXT emittance measurement part 1  Shift 4: emittance measurement part 2, additional diagnostics, and ring voltage changes

Study Topics for Nov/Dec “training shifts” (week of November 26-30) –[ ] ATF Damping Ring BPM upgrade (Echotek) –tests of calibration electronics –Turn-by-Turn orbit acquisition and analysis (MIA, coupling correction) –Beam Based Alignment (maybe … ) –[ ] anomalous emittance growth in extraction channel –measured emittance versus localized orbit bumps in extraction components (QM6, QM7, septa) –generation of “trifurcated” closed orbit bumps –[ ] emittance measurement and correction in EXT –multi-wire-scanner and quad-scan measurements; sensitivities to errors –beam phase space reconstruction –coupling correction –[ ] beam halo measurement in EXT

DR EXT INJ

stored beam extracted beam QM7R

x  (x ) (m) extracted beam  B y data  B y fitting core stored beam gap extracted beam conductor “blade” Extraction Septum POISSON model of field in the gap

Simulation: vertical emittance versus vertical position (bump) in QM7R Measurement: extracted emittances versus single-bunch current

Shift Schedule unknown at present (study proposals call for a total of 22 shifts during this 4 week period) shift assignments for each week are made at weekly Monday 13:30 meeting –shift takers request (or are assigned) shifts owl shift:01:00-09:00 (09:00-17:00 here, previous day) day shift:09:00-17:00 (17:00-01:00 here, previous day) swing shift:17:00-01:00 (01:00-09:00 here, same day) –Kubo-san runs the show expect short notice of shifts early in any given week! some training sessions may take place when the machine isn’t running (i.e. Monday morning there, Sunday evening here … ) hopefully Webex connection will be available from the ATF Control Room (not certain yet) remote participation (SLAC) from old PEP Control Room (B685)

ATF Personnel on Shift (leader / sub-leader)

PEP Control Room (Building 685)

ATF Visitors The Europeans (emittance growth, emittance measurement, halo measurement) –Rob Appleby, Cécile Rimbault, Julien Brossard, Maria Alabau, Anthony Scarfe, James Jones, Hayg Guler The Fermions (DR BPM upgrade, TBT studies) –Charlie Briegel (11/28 – 12/13), Nathan Eddy (12/10 – 12/22), Eliana Gianfelice (12/10 – 12/22), Peter Prieto (11/28 – 12/13), Ron Rechenmacher (11/28 – 12/8), Duan Voy (11/28 – 12/13), Manfred Wendt (11/28 – 12/10) The SLACers (DR BPM upgrade, TBT studies, emittance growth) –Doug McCormick (11/30 – 12/22), Tonee Smith (12/4 – 12/22), Justin May (11/30 – 12/22), Mark Woodley (12/8 – 12-22), Yiton Yan (12/3 – 12/15) others remote participants?

References remote participation –Andrei’s presentation at the ATF2 Weekly Meeting (May 16, 2007) [ d070516/remote_participation.pdf] anomalous emittance growth –Feng’s presentation at the ATF2 Weekly Meeting of (September 5, 2007) [ d070905/sep5-atf.pdf] –Kuroda-san’s comments from ATF2 Annecy Meeting (October 15-17, 2007) [ sessionId=20&resId=1&materialId=slides&confId=2268] –Maria Alabau’s presentation from ATF2 Annecy Meeting (October 15-17, 2007) [ sessionId=16&resId=0&materialId=slides&confId=2268] –Rob Appleby’s presentation from ATF2 Annecy Meeting (October 15-17, 2007) [ sessionId=16&resId=0&materialId=slides&confId=2268] Damping Ring BPM upgrade –Manfred’s presentation at the ATF2 Weekly Meeting (August 29, 2007) [ d070829/ATFDRBPM_63.pdf] –Manfred’s presentation at LCWS07 (May 31, 2007) [ ATF_DR_BPM_Status.ppt]