© 2000 PACIFICORP | PAGE 1 –Main Transmission Sources  345-138 kV Transformers. Terminal, Mid Valley, 90 th South and Oquirrh –Generation: Gadsby (~350.

Slides:



Advertisements
Similar presentations
National Grid Local System Plan 2009 LSP Presentation Related Questions and Answers.
Advertisements

Central California Clean Energy Transmission Project PCC Meeting Vancouver, BC October 24, 2007.
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Goshen Area Bus Reconfiguration
La Crosse 161 kV Capacitor Addition Northern MAPP Subregional Planning Group April 3, 2007 Daniel Kline.
 2005 Pinnacle West Capital Corporation Palo Verde Hub Participant Meeting May 27, 2005 Arizona Public Service Company Tom Glock – Manager Power Operations.
Direction at your fingertips. A compass rose is a design on a map that shows directions. It shows north, south, east, west, northeast, northwest, southeast,
Help me find the cardinal directions
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
Nov 11, 2011 RPG Meeting Cross Valley Brownsville Loop Project – Status report.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
Transformer Construction
1 Entergy Louisiana, LLC (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
Transmission’s Critically Important Role in Connecticut’s Energy Future David H. Boguslawski Vice President - Transmission Northeast Utilities Service.
© 2000 PACIFICORP | PAGE 1 WYOMING WEST AREA STUDY DECEMBER 2013 Seongtae Kim/Jeremy Viula.
1 Green River Utah Area Transmission and Distribution System – January 16, 2009.
Xcel Energy Smaller Scale Transmission Projects Northern MAPP Subregional Planning Group April 3, 2007 Srinivas Vemuri, Jason Standing, and Daniel Kline.
5/17/2000Summer Preparedness /17/2000Summer Preparedness SRP SUMMER PREPAREDNESS 2000 Presented to the Arizona Corporation Commission May.
NW Transmission System Bottlenecks and Impacts of 2005 Summer Operation BPA Transmission Business Line Mike Viles January 2006.
Coincident Peak Load Forecasting Methodology Prepared for June 3, 2010 Meeting with Division of Public Utilities.
Grizzly-Summer Lake 500 kV Line Planned Outage May 27-June hours Mike Viles – BPA Transmission Operations Technical Management Team June.
Rocky Mountain Power Load Growth and Network Planning April 27, 2007 Mark Adams.
Rocky Mountain Power Sub Transmission Five Year Study Findings and Kick Off Attachment K Meeting September 10, 2015.
Rocky Mountain Power Five Year Study Kick Off Meeting.
Rocky Mountain Power Five Year Study Findings and Kick Off Meeting December 2013.
2015 Summer Shoulder-Peak Near-Term Assessment of Transmission System Performance ~ Board of Directors Meeting September 30, 2010 Presented by Jeff Mitchell.
Energy Storage Applications at AEP Emeka Okafor American Electric Power Presentation to SouthWest Electric Distribution Exchange May 7, 2009.
March 11, 2011 RPG Meeting Lower Rio Grande Valley (LRGV) Import.
John Dumas Director of Wholesale Market Operations Jeff Billo Manager of Mid Term Planning Dan Jones Director with Potomac Economics, the ERCOT IMM Board.
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
MISO Northwest Exploratory Study Presented to National Wind Coordinating Committee Participants in study – MISO, Various utilities in Minnesota, North.
1 Stability Issues in Entergy System Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Regions and Landforms of the united States
1 Entergy Louisiana, Inc. (South) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Creating a process-based organization 1. Invite the entire organization into a big open room.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
Jeff Billo Manager, ERCOT Transmission Planning Kenedy to Nixon to Seguin Line Upgrade Project Regional Planning Group (RPG) Review; ERCOT Independent.
AEPSC Live Oak County Transmission Project – ERCOT Independent Review TAC September 24, 2015.
February 13, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
1 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group Steve Lathrop, PacifiCorp Panel#2: A Day in the Life of Planners/Engineers 2008 PI T&D.
Transmission Voltage Management Ross Owen Oncor Electric Delivery.
Transmission Capital Project Updates. Transmission Expansion Plan Sigurd to Red Butte 345 kV line in-service May, 2015 Permitting activities continue.
© 2000 PACIFICORP | PAGE 1 SOUTHWEST UTAH AREA STUDY SEPTEMBER 2014 Nathan Wilson/Talmage Daley Need to review the LOADS before Friday.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
Arizona Extreme Contingency Analysis 2009 & th BTA Presentation Jonathan Stahlhut, Ph.D. Transmission Planning Engineer, APS May 22-23, 2008.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 5/09/2011 West of Cascades – North (WOCN) Path BPA Studies Path Definition (for studies) 
Presentation For PSAST May 14, Outline Most Limiting N-1-X Events Voltage Limitations For Loss of Three Terminal Monroe- Echo Lake 500kV and Chief.
Rocky Mountain Power Five Year Study Findings & Kick Off Meeting
Electric Utility Master Plan Update
Tuolumne Apartments Lower Level Northwest: Inaccessible Element
Naughton RAS (Southwest Wyoming Generation Tripping Scheme) – LAPS
TVA RC 2017 Summer Outlook TVA RC July 27, 2017.
Exercise Session 3 Power systems.
北 N north 西 W west 東 E east south南 S.
Humanities and Social Sciences Upper Level Northeast: Accessible Entrance
Naughton RAS (Southwest Wyoming Generation Tripping Scheme) – LAPS
INTERCONNECTED SYSTEM GENERATING CAPACITY RELIABILITY EVALUATION
Unscheduled Flow Administrative Subcommittee
TONBRIDGE POWER GREEN LINE
Key Biscayne Substation
Mandeville Center Upper Level West: Interior Inaccessible Element
Parts of a Map.
Presentation transcript:

© 2000 PACIFICORP | PAGE 1 –Main Transmission Sources  kV Transformers. Terminal, Mid Valley, 90 th South and Oquirrh –Generation: Gadsby (~350 MW - 6 units); Other area generation contributions of approximately 562 MW. –Total connected is about 915 MW. Terminal Midvalley 90 th South Oquirrh Gadsby West Valley Gen Scott Murdock/Jeremy Viula/Stein Sandberg Area 2012* Load (MW) 2013* Load (MW) 2018 Load (MW) 2018 Growth Rate (%) Northeast Northwest Southeast Southwest Total % *Actual loading for 2012 and is projected from SALT LAKE VALLEY STUDY

© 2000 PACIFICORP | PAGE 2 Load Duration Curve Salt Lake Valley Transformer Capacity kV 4567 MVA (8) kV 1918 MVA (13) Distribution 3300 MVA (136) 2018 projected Summer peak load is 2,751 MW based on a projected growth of 1.4% The overall load factor is 61%

© 2000 PACIFICORP | PAGE 3 N-0 System Problems & Future Requirements –Increase Capacity at Camp Williams –Remove a 2 MVA transformer –Replace it with a 30 MVA unit –Benefit: Offloads: Porter Rockwell, South Mountain, Dumas and Bangerter Recommended Improvement(s)

© 2000 PACIFICORP | PAGE 4 –Two noteworthy outages: –1) Loss of a kV transformer at 90 th South. –2) Loss of # kV transformer at McClelland. Both can be handled with switching contingencies. SALT LAKE VALLEY N-1 ISSUES