Guidelines for Successful ITS Procurement T3 Session September 12, 2006 Presented by Phil Tarnoff University of Maryland Hosted by Mac Lister FHWA.

Slides:



Advertisements
Similar presentations
1.1Definition of Construction:. Is the process by which material, equipment, machinery are assembled into a permanent facility. Is the process by which.
Advertisements

Guidelines for Successful Scope and Procurement The Problem Success rate for intelligent transportation systems life cycle is very low Success rate for.
1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
BEST VALUE PROCUREMENT. What is BVP? A procurement process where price and other key factors can be considered in the evaluation and selection process.
Software Engineering CSE470: Process 15 Software Engineering Phases Definition: What? Development: How? Maintenance: Managing change Umbrella Activities:
Software Engineering Software Engineering is the science and art of building significant software systems that are: 1) on time 2) on budget 3) with acceptable.
Information Resources Management January 23, 2001.
CSE 470 : Software Engineering The Software Process.
What is Software Design?. Systems Development Life- Cycle Planning Analysis Design Implementation Design.
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
Software Modeling SWE5441 Lecture 3 Eng. Mohammed Timraz
Module 11 Session 11.2 Visual 1 Module 11 Executing and Controlling the Work Session 11. 2: Managing Contracts.
Alternative Project Delivery
© Prentice Hall CHAPTER 10 Alternative Approach: Purchasing Systems.
Project Procurement Management
Chapter 6: Design of Expert Systems
The Process of Interaction Design. Overview What is Interaction Design? —Four basic activities —Three key characteristics Some practical issues —Who are.
R R R CSE870: Advanced Software Engineering (Cheng): Intro to Software Engineering1 Advanced Software Engineering Dr. Cheng Overview of Software Engineering.
Software Development Contracts and Legal Issues Cost plus Fixed price Combined.
The Process of Interaction Design. What is Interaction Design? It is a process: — a goal-directed problem solving activity informed by intended use, target.
PROCEDURES FOR SELECTING THE CONTRACTOR
Guidelines for Successful ITS Procurement T3 Session, March 15, 2006 Hosted by Mac Lister FHWA Presented by Phil Tarnoff University of Maryland.
Acquiring Information Systems and Applications
Acquiring Information Systems and Applications
The BIM Project Execution Planning Procedure
ARCH 330- Materials/Methods The course will cover the systems associated with construction materials methods and sequencing primarily in building construction.
Where is the IT in ITS? T3 Presentation August 18, 2009 Mac Lister Knowledge and Technology Transfer Program Manager ITS Joint Program Office RITA.
1 CAPACITY BUILDING AND TRAINING ON PROCUREMENT Session 9 – The World Bank Procedures for IT Procurement September 21, 2005 by Arif Hassan.
Software Engineering II Lecture 1 Fakhar Lodhi. Software Engineering - IEEE 1.The application of a systematic, disciplined, quantifiable approach to the.
Key System Engineering Processes for (Cost) Effective Cyber Security in a Dynamic Threat Environment. Kevin Stoffell September 11, 2015.
Dillon: CSE470: SE, Process1 Software Engineering Phases l Definition: What? l Development: How? l Maintenance: Managing change l Umbrella Activities:
From Research Prototype to Production
Module 10 Session 10.4 Visual 1 Module 10 Organizing Procurement Session 10.4 Procurement of Services: Use of Consultants and Developing Terms of Reference.
CS 360 Lecture 3.  The software process is a structured set of activities required to develop a software system.  Fundamental Assumption:  Good software.
Construction Contracts and Project Delivery Methods
TOPIC-9- PROJECT ORGANIZATION
Important acronyms AO = authorizing official ISO = information system owner CA = certification agent.
Greening Government Operations Green Procurement Implementation Tools & Resources Canadian Public Procurement Forum October 1 st, 2007.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
2007 Introduction to System Engineering 1 ECET/CPET 491 Senior Design Project II Intro to System Engineering Reference: System Engineering Management,
ITS Procurement Workshop Module 2: ITS Procurement Characteristics and Challenges.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Project Life Cycles.
Acquiring Information Systems and Applications
1 SWE Introduction to Software Engineering Lecture 4.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 2 Project Management Cycle.
Gary MarsdenSlide 1University of Cape Town Human-Computer Interaction - 4 User Centred Design Gary Marsden ( ) July 2002.
DIVISION OF PROCUREMENT SERVICES procurement.sc.gov/PS/PS-index.phtm Project Acquisition Under the Consolidated Procurement Code John St. C. White State.
GRUNDTVIG PROJECTS Overview of Application Procedure and Selection Criteria. Grundtvig Contact Seminar Malta : 10 th -13 th October 2002.
Systems Engineering “Understanding Where it Fits in Your Agency” a session in fhwa’s Systems Engineering t3 series aug. 02, 2007.
What Executives Need to Know About Software Acquisitions ITS Professional Capacity Building Program T3 Session July 12, :00 p.m. EDT.
System Selection Dania Bilal IS 582 Spring System Selection Business Selection of system project to develop or enhance Libraries & other information.
Chapter 1: Introduction Omar Meqdadi SE 3860 Lecture 1 Department of Computer Science and Software Engineering University of Wisconsin-Platteville.
Chapter 6 SYSTEMS DEVELOPMENT Phases, Tools, and Techniques.
Modern Systems Analysis and Design Third Edition Chapter 2 Succeeding as a Systems Analyst 2.1.
Software Development Process CS 360 Lecture 3. Software Process The software process is a structured set of activities required to develop a software.
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
OFT & OGS PSG “IT” Procurement New York State Purchasing Forum May 20-21, 2003 George E. Pataki Governor Kenneth J. Ringler Commissioner Michael McCormack.
1 Chapter 2 SW Process Models. 2 Objectives  Understand various process models  Understand the pros and cons of each model  Evaluate the applicability.
Important acronyms AO = authorizing official ISO = information system owner CA = certification agent.
1 Week 3 Software Engineering Spring Term 2016 Marymount University School of Business Administration Professor Suydam.
© 2014 HDR Architecture, Inc., all rights reserved. © 2014 HDR, Inc., all rights reserved. © 2014 HDR, all rights reserved.
Advanced Software Engineering Dr. Cheng
Acquisition Support New Horizons Consulting Services, LLC’s, premier business unit is an offering of a full range of services and support for acquisition.
School of Business Administration
Enterprise Content Management Owners Representative Contract Approval
ISCOM 361 PAPERS Education for Service--iscom361papers.com.
Project Management Process Groups
Software Engineering I
SOME IMPORTANT CONSIDERATIONS AND STEPS
Presentation transcript:

Guidelines for Successful ITS Procurement T3 Session September 12, 2006 Presented by Phil Tarnoff University of Maryland Hosted by Mac Lister FHWA

The Problem Success rate for intelligent transportation systems life cycle is very low Problems can be traced to: –Incorrect contracting approach –Inexperience of the agency –Failure to follow appropriate procedures –Inadequate commitment of project management and systems engineering resources

System Acquisitions 51% 34% 15% Late Okay Cancelled Source: Standish Group, 2004

Success is Influenced by the Purchaser Purchaser’s experience has greater impact on project success than any other factor Success rate has increases by more than 25% for purchasers with prior experience ITS implementation must be led by experienced staff Source; Patterns of Software Systems Failure and Successes, Jones, Capers, 1996

The Contracting Model

Defines the entire contracting form and process Includes four dimensions: –Work Allocation – Responsibilities –Method of Award – Contractor selection –Contract Form – How is work organized –Contract Type – Methods of reimbursement Terms and conditions apply to all dimensions

The Contracting Model Terms and Conditions (payment, cancellation, disputes, etc.) Procurement Work Allocation Method of Award Contract Form Contract Type Low-Bid Contractor Systems Manager Systems Integrator DB(OM) Commodity (COTS) Consultant Services Outsource Contractor Other Services Low-Bid Negotiated Sole-Source Phased Task Order Purchase Order Fixed-Price Cost Reimbursable Incentive Time and Materials

Use of the Contracting Model Identifies dimensions to be included in selection process Procurement guidelines define the process for choosing appropriate option for each dimension Process is simplified by assembling combinations of options – procurement packages Project may include multiple contracts and procurement packages

System Procurement Packages (1 of 2) 1)Commodity Supplier –Low-bid selection of prequalified packages –Fixed-price contract –Applicable only for unmodified off-the-shelf software and hardware 2)Low-Bid Contractor with Design Consultant (for 100% design) –Low-bid selection –Fixed-price contract –Can use incentives –Can use phased contracts –Useful if the predominant software is off-the-shelf

System Procurement Packages (2 of 2) 3)Systems Manager –Negotiated procurement –Fixed-price, cost-plus, or time-&-material contracts –Can use incentives –Can use either phased or task-order contracts –Separate low-bid procurements required for construction and equipment 4)Design-Build Contractor with Design Consultant (for 30% design) –Best value selection –Fixed-price; cost-plus, or T&M may be acceptable –Can use incentives –Can use phased contracts

Other Procurement Packages 5)Consultant –Negotiated –Fixed-price, cost-plus, or time-&-material contracts –Can use incentives –Can use either phased or task-order contracts 6)Outsourcing either an activity (such as maintenance) or an entire function (such as traveler information) –Low-bid selection may be based on rates –Fixed-price or time-&-material contracts –Can use incentives

Contracting Considerations

Selecting the Best Procurement Approach Organizational Level Experience Resources Personnel Project Category New or replace Size & complex Uniqueness Characteristics Contracting Solutions System Development Process Procurement Package Terms and Conditions

Defining Organizational Level CharacteristicImmature OrganizationMature Organization Personnel Experience Part time, personnel have no prior experience Full time responsibility of experienced personnel Organizational ExperienceNever done it before Experienced with one or more complex projects Organizational Structure ITS responsibilities undefined Single organizational unit responsible for all ITS ResourcesNo defined ITS budget ITS budget for systems and personnel Management SupportModest mid-level support Considered a priority by senior management ExpectationsNot defined Included in agency’s planning process

Defining Project Complexity CharacteristicSimple ProjectVery Complex Project NewnessOff-the-shelf solutionsInvention(s) needed ScopeSingle functionMulti-function system InterfacesNoneBoth internal & external MaturityMany similar systemsNever been done Stability Requirements well defined Not sure what is needed Institutional Being developed for single agency Many agencies involved

The Outputs Systems development process –Waterfall –Evolutionary –Spiral The procurement package Lists of terms and conditions

Systems Development Processes Waterfall – A linear process for well- defined programs, including all the activities of the systems engineering process Evolutionary – Development of a project in a series of well defined phases in which the SE process is repeated for each phase Spiral – Not certain of what is needed, so project development accompanied by much prototype development and many planning steps

The Decision Process

Summary of the Eight-Step Procurement Approach (1) Initial decisions (2) Allocate the work (3) Select project category (4) Determine agency level (5) Using organizational levels and categories, select procurement package(s) for each project (6) Apply procurement differentiators to make final selection (7) Make final selection (8) Define contract terms and conditions

Key to a Successful Procurement Choice of procurement approach is dependent on project type and agency capabilities. “We’ve always done it that way” is not a good rationale. The right procurement approach may not guarantee success, but the wrong approach will guarantee failure.

For More Information Under highlights, select “Guide to Contracting ITS Projects” to access web-based step- by-step selection process. /ITSCurriculum.htm for courses on ITS procurement, systems engineering and project management

Contacts Phil Tarnoff Mac Lister