Automated Composting Appliance P16421 Sponsored by Rochester Roots.

Slides:



Advertisements
Similar presentations
Trevor Andrews Holli Monroe Emily Piccione William Wright.
Advertisements

Trevor Andrews Holli Monroe Emily Piccione William Wright.
P11228 Week 2 Japh Learn Joseph Corea Tim Monahan Bryan Reinheimer Ed Gliss.
P11228 Week 4 Japh Learn Joseph Corea Tim Monahan Bryan Reinheimer Ed Gliss.
Multidisciplinary Engineering Senior Design Project 05xxx Project Name 2005 Critical Design Review May 13, 2001 Project Sponsor: Team Members: Team Mentor:
RIT Senior Design I, Project Review P07310: Electronic Shifted Manual Transmission George Slack Team Guide Jason BotterillTeam Leader, Mechanical Engineer.
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Multidisciplinary Engineering Senior Design Project xxxxx Project Name Preliminary Design Review mm/dd/yy Project Sponsor: Team Members: Team Mentor: Acknowledgements:
Detailed Design Review of Magnetic Field Centering Device Project # P08028 “Develop a Design and Methodology to Ensure the Concentricity between the Magnetic.
EDGE™ Project Review P Automation/Improvement of Wegmans Cookie Line Packaging Project Team: Stephanie Rager (IE), Bruno Coelho (ME), Mark Voss (ME),
Sponsored by Wegmans P Automation/Improvement of Packaging on the Cookie Line Stephanie Rager Bruno Coelho.
What is Business Analysis Planning & Monitoring?
Team 1 Jesus Weibo Mina Yunming. Client’s Needs  Short term, medium term, long term plans  Simulation of energy system to provide affordable future.
Design Development Image credit:
ALL MCQS
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Biochar Concrete Roofing Sheets for Nicaragua
Week 2 Seminar: Project Scope Management
1 Chapter 23 Estimation for Software Projects. 2 Software Project Planning The overall goal of project planning is to establish a pragmatic strategy for.
© Mahindra Satyam 2009 Decision Analysis and Resolution QMS Training.
Compost Accelerator Team 9: Jorge Ramirez Stephano Salani Eric Zuniga Advising Professor: Dr. Kuang-Hsi Wu.
Do Now: Create a list of all the things you have thrown away today? What did you do with your trash? Are you being environmentally friendly?
Robotics & Engineering Design Projective Management Chin-Sung Lin Eleanor Roosevelt High School.
Sustainability, Recycling and Trash AIMS Coordinators Meeting Thursday, September 10, 2009.
HUNTING CAMP FACILITY BY: Ryan Fremin ET 493 Senior Design Construction Engineering Technology Professor: Dr. Koutsougeras Advisor : Mr. Rode.
Inception Chapter 4 Applying UML and Patterns -Craig Larman.
Team #5 Nicholas Baker Alejandro Haller Matthew Hudson Cristobal Riojas Sep 08, 2011 Fully automated machine that proves the concept of automated construction.
CSC480 Software Engineering Lecture 10 September 25, 2002.
MSD 1 WEEK 6 SYSTEM DESIGN REVIEW Team Rochester Institute of Technology College of Engineering P /2/
Junior Design Project Jesse Boudart.  Purpose American Society of Mechanical Engineers (ASME) Design Competition  Clean most amount of dirt (Dots) 
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
P16680: AATech Universal Oil and Bag System Bryce Mowers Jessica Reed Maria King Nicole Anklam Philip Couturier Samantha Orlando.
Rational Unified Process (RUP)
Degree and Graduation Seminar Integration Management
Team #5 Nicholas Baker Alejandro Haller Matthew Hudson Cristobal Riojas Sep 09, 2011 Fully automated machine that proves the concept of automating construction.
P16680: AATech Universal Oil and Bag System System Design Review 9/29/15.
©2005 DLMann, all rights reserved. ‘DEFINE’ PACK This pack offers a series of questions you should be asking during the DEFINE stage of a problem or opportunity.
Project Closeout Report. Closeout Components Project Objective Results Deliverable Results Lessons Learned Summary and Team Feedback Final Project Organization.
MSD 1 WEEK 6 SYSTEM DESIGN REVIEW Team Rochester Institute of Technology College of Engineering P /2/
Smart Power Supply Test Bench P16203 ANDRE PELLETREAU, KERRY OLIVIERA, JEREMY WILLMAN, RADOSLAW MASLANKA, VINCENT STOWBUNENKO.
Request for Proposal (RFP) In response to the RFP – the first step is to prepare a proposal 1. Review Customer Requirements and come up with candidate.
The Project Management Process Groups
Chapter 33 Estimation for Software Projects
Be Prepared To Have Your Mind Blown….
August ICA Agenda Time Topic 8:00 – 8:15
Baja Hybrid Drivetrain Design P14224
Project Kickoff Meeting
Multidisciplinary Senior Design I: Problem Definition Review
Software Engineering: A Practitioner’s Approach, 6/e Chapter 23 Estimation for Software Projects copyright © 1996, 2001, 2005 R.S. Pressman & Associates,
P14551: Multi-Process 3-D Printer
Request for Proposal (RFP)
P08351: Automated Oiling System
Amendment Invoice Task Force Progress Report
Self-Insurance Application Schedule – Key Dates*
Breadfruit Flour Grinder
Amendment Invoice Task Force Progress Report
Amendment Invoice Task Force Progress Report
Chapter 33 Estimation for Software Projects
Software Engineering: A Practitioner’s Approach, 6/e Chapter 23 Estimation for Software Projects copyright © 1996, 2001, 2005 R.S. Pressman & Associates,
Mumtaz Ali Rajput +92 – SOFTWARE PROJECTMANAGMENT– WEEK 4 Mumtaz Ali Rajput +92 – 301-
<Project Name> Milestone Summary Report
• Introduce and explain the background and the details of your project
Amendment Invoice Task Force Progress Report
Robo-Composter Jan McDonald-Rochester Roots (Sponsor) Chris Liebfried
University Template Sample Slides June 2017.
Amendment Invoice Task Force Progress Report
St. Joseph’s House of Hospitality Improvements
Chapter 26 Estimation for Software Projects.
P15661 Reciprocating Friction Tester Base Subsystem Problem Definition Review Matt.
Designing a student services ecosystem for Gillings’ students Kathy Anderson, Assoc Dean for IT and Project Planning October 2018.
Presentation transcript:

Automated Composting Appliance P16421 Sponsored by Rochester Roots

Agenda Background Problem Statement Use Cases Customer Requirements Benchmarking Engineering Requirements Risk Management Schedule

Background and Summary Rochester Roots has commissioned our team to develop an appliance that allows for efficient and convenient composting in the day to day household. This project is the brainchild of a middle school student named JJ who envisions this to be used as an educational tool in classrooms as well. The sustainability of this project should help to eliminate day to day waste as well as reduce the use of artificial chemicals in gardening applications.

Problem Statement Composting is a method of recycling biodegradable waster in order to take advantage of the leftover nutrients as well as decreasing significant amounts of trash. Most composting today is done in trash cans and gardens where waste naturally decomposes over a long period of time. This project aims to assess the mechanisms behind natural decomposition in order to speed up and contain the process in a single unit. The final prototype will be fully operational and meet the standards set by the stakeholders.

Customer Requirements

Benchmarking

Engineering Requirements

Risk Management

Project Timeline All design specifications and project research to be completed by 01 OCT 2015 This includes ideal operating conditions and a school visit for student interactions. Final design including CAD files of all parts and components to be completed by 10 NOV 2015 Also final decisions on sensors, controllers and interfaces will be selected. Test components and designs completed with detailed notes and troubleshooting steps to be taken completed by 03 DEC 2015

Project Timeline

Next Steps- 3 Week Plan Map Composting Process by 15 SEP 2015 Decide on measurable parameters and basic steady state by 15 SEP 2015 Map systems and subsystem priorities by 23 SEP 2015 Visit class and obtain actual space requirements by 25 SEP 2015