CERN, 27-Mar-2009 1 EuCARD NCLinac Task 9.5 27/3/2009.

Slides:



Advertisements
Similar presentations
Mostly by Gwyn Williams and the JLab Team, Presented by D. Douglas Working Group 4 Diagnostics & Synchronization Requirements Where we are and what needs.
Advertisements

ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
Northwestern University Plans Topic: RF-pickup for bunch length measurement Anne Dabrowski Northwestern University CTF3 Collaboration Meeting 29 November.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
TUPD02 BEAM DIAGNOSTICS FOR THE ESS BLM BPM Trans Profile Bunch Shape BCM Preliminary System Count A. Jansson, L. Tchelidze, ESS AB, Lund, Sweden Hybrid.
R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 LCLS RF Stability Requirements LCLS Requirements The SLAC Linac.
Laser to RF synchronisation A.Winter, Aachen University and DESY Miniworkshop on XFEL Short Bunch Measurement and Timing.
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
Drive Beam Phase Measurements and Feedback at CTF3 Giulio Morpurgo.
ELI: Electronic Timing System (ETS) at Facility Level E L I – B L – – P R E – B.
CLIC Kickers: Status and activities for 2013 in view of the budget discussions for 2013 CTC #65 M.J. Barnes CLIC Technical Committee, November M.J.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Wir schaffen Wissen – heute für morgen 24 August 2015PSI,24 August 2015PSI, Paul Scherrer Institut Status WP 8.2 RF Low Level Electronic Manuel Brönnimann.
Drive Beam and CTF 3 International Workshop on Linear Colliders 2010 October 22, 2010 Erik Adli, Department of Physics, University of Oslo and CERN Bernard.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Stability issues in CTF3 and their relevance for CLIC. Phase feed-forward. Piotr Skowronski (1), Tobias Persson (1), Alexey Dubrovskiy (1), Guido Sterbini.
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
Holger Schlarb, DESY Normal conducting cavity for arrival time stabilization.
R&D Programme for RT Phase Feedback Giulio Morpurgo.
Synchronisation Activities for 4GLS Supported by EUROFEL DS3 G J Hirst CCLRC Central Laser Facility.
Peter Spiller, DIRAC Kick-off meeting Peter Spiller Design Study Group DIRAC kick-off meeting SIS100.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
An RF & High-Speed Acquisition Systems for High-Gradient Tests at CLIC Test Facility Raquel Fandos.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
N. Baboi, DESY EuCARD WP10 Kick-off Meeting, 24 Mar HOM-couplers (pick-ups) HOMBPM - Overview Purpose: on-line measuring device for 1. beam.
LLRF for EUCARD Crab Cavities Graeme Burt (on behalf of Amos Dexter) Paris May 2011.
Summary of Booster Dampers Systems Dave McGinnis December 7, 2010.
Accumulator Stacktail Cooling Paul Derwent December 18, 2015.
CLIC09 Workshop October 2009Drive beam BPM’sLars Søby 1 Drive Beam BPM’s CLIC 09 work shop, CERN, of October 2009, Lars Søby.
Femtosecond phase measurement Alexandra Andersson CLIC Beam Instrumentation workshop.
1 EuroTeV High Bandwidth Wall Current Monitor Alessandro D’Elia CERN- Geneve.
Krzysztof Czuba1 REFERENCE FREQUENCY DISTRIBUTION SYSTEM FOR THE TESLA TECHNOLOGY BASED PROJECTS Krzysztof Czuba Matthias Felber.
Diagnostics Workpackage G A Blair EUROTeV Final Meeting, DESY, Hamburg 30 th January 2009 Tasks Summary.
WP8-HGA High Gradient Acceleration M. Biagini (INFN-LNF) WP8 coordinator Tiara Kickoff Meeting, CERN, Feb , 2011.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
FP7: EuCARD after a year of preparation… A.Jeremie.
High precision phase monitoring Alexandra Andersson, CERN Jonathan Sladen, CERN This work is supported by the Commission of the European Communities under.
EuCARD NCLinac 9.3 Linac and FF Stabilisation A.Jeremie.
CLIC Drive beam BPM Requirements and cost estimate.
1 st TIARA Steering Committee A. Gallo – INFN Frascati deputy of TIARA WP8 leader STATUS OF TIARA WP8.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
CLIC DB injector facility, photo-injector option studies LCWS, Granada, September 26 th -30 th,2011Steffen Döbert, BE-RF  CLIC DB injector  Thermionic.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
WP9 updated Upgrade of SPARC test facility for high gradient acceleration of electron beams for SuperB collider and FEL projects WP number9Start month1End.
Sub-Task HOM-BPM HOM based Beam Position Monitors – Planned and Extant Measurements N. Baboi, DESY, Hamburg EuCARD WP 10: SRF, Annual Review Meeting.
ESGARD OMIA Sept EUROdrive and LED Motivation Work Packages Partners & resources.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
CALIFES A proposed electron beam test facility at CERN
Task 9.4 Beam Delivery System CERN, 27-Mar /3/2009
EUROTeV Diagnostics WP5
Phase Feed-Forward Piotr Skowroński (CERN)
WP11 – ANAC Report on First Semester
WP9-SuperB in TIARA M. Biagini, INFN-LNF.
EuCARD2 WP11 Topical Meeting
UK FEL development package WP6:
Spectral methods for measurement of longitudinal beam profile
Have a chance to operate your own beam at CERN
Status of Synchronization System
F.Marcellini, D.Alesini, A.Ghigo
TIARA WP8 Status M. Biagini, INFN-LNF, for WP8 TIARA Mid-Term Meeting
CLIC-ILC BDS & MDI work.
    BEAM POSITION MONITORS USING A RE-ENTRANT CAVITY C. Simon1, S. Chel1, M. Luong1, P. Contrepois1, P. Girardot1, N. Baboi2 and N. Rouvière3.
ERL BPM System Mike Billing, Mark Palmer
CLIC Beam Instrumentation
XFEL bunch compressors
LCLS RF Stability Requirements
Explanation of the Basic Principles and Goals
CLIC Feasibility Demonstration at CTF3
Presentation transcript:

CERN, 27-Mar EuCARD NCLinac Task /3/2009

Task 5. Drive Beam Phase Control  Design, build and test a low-impedance RF beam phase monitor with a resolution of 20 fs  Design, build and test an electro-optical phase monitor with a resolution of 20 fs Task 5. Drive Beam Phase Control Very precise synchronization between main and drive beams is required in CLIC to avoid excessive luminosity loss due to energy variations. For this reason drive beam phase errors should be reduced by a phase feedback system within about 0.1 degrees (23 12 GHz). The front end of this feedback system will consist of a monitor able to detect the longitudinal position of the bunches with a resolution of the order of 20 fs. The coupling impedance of the monitor has to be very low due to the high beam current. RF noise and wake fields in the beam pipe must not affect the measurement and have to be rejected by proper designed filters. This device will find applications in other machines where precise high frequency beam phase detection is required. Two possible solutions will be investigated at the same time. A low impedance RF phase monitor with an integrated noise filter will be designed and built by CERN and INFN. It will be tested in CTF3 where it will also play an important diagnostic role in the optimization of the machine performances. An electro-optical monitor using periodic train of laser pulses to sample signal from wide bandwidth beam pickup will be developed and built by PSI and will be tested at the existing facilities at PSI.  Sub-task 1: CERN will determine the specifications and will produce a conceptual design report of the RF monitor. CERN and INFN will attend together to the electromagnetic design and then they will produce a building design of the monitor. CERN will develop and realize the related electronics. INFN will build prototypes of the monitor that will be measured and tested in lab. A final version of the monitor will be built and the performances of the system will be tested in CTF3.  Sub-task 2: The electro-optical monitor will be designed by PSI. PSI will implement prototypes of the system, which includes pick-up, laser, electro optical detector and electronics. The performances of the system will be tested in the existing facilities at PSI. EuCARD NCLinac Task /3/2009

EuCARD NCLinac Task DeliverableDescription/titleNatureDelivery month 9.5.1RF phase monitor final reportRM Electro optical monitor final reportRM48 MilestoneDescription/titleNatureDelivery month Comment 9.5.1RF phase monitor prototype finishedPM36Prototype ready for test 9.5.2Electro optical monitor prototype finishedPM40Prototype ready for test

27/3/2009EuCARD NCLinac Task EuCARD - WP9 NCLinac - Task 9.5: DB Phase Beneficiary short name ª Average direct monthly salary * (€) Rate for personnel indirect costs (%) Rate for material and travel indirect costs (%) LNF 6,200 €60 CERN 6,200 €60 PSI 14,300 €20 PSI 10,100 €20 Beneficiary short name (all costs in €)Person- Months Personnel direct costs Personnel indirect costs Consumable and prototype direct costs Travel direct costs Material and travel indirect costs Total direct costs Toal indirect costs Total costs (direct +indirect) EC requested funding¹ LNF30186,000111,60031,3004,50021,480221,800133,080354,880111,500 CERN1699,20059,52062,700 37,620161,90097,140259,04069,229 PSI571,50014,300107,5002,70022,040181,70036,340218,04064,000 PSI10101,00020,200 2, ,70020,740124,44039,000 … … … … Totals:61457,700205,620201,5009,90081,680669,100287,300956,400283,729

27/3/2009EuCARD NCLinac Task 9.5 5