Draft Framework Guidelines on Capacity Allocation and Congestion Management Florence Forum 13 December 2010 Alain Marien ENM TF co-chair.

Slides:



Advertisements
Similar presentations
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
Advertisements

Cross-Regional Roadmap for Intraday DRAFT Updated 31/10/2011.
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
Cross-regional roadmap for Capacity Calculation XXI Florence Forum Florence 5 December 2011.
Access to long-term capacity for electric interconnections: toward a single European set of rules 2 nd common RCC CSE-CWE regions 28 September 2010 Milan.
1 TITRE Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11 th Stakeholder Group meeting GRI.
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
Bente Danielsen, ERGEG Transparency Project Team leader Alain Taccoen, ENTSO-E WG Market Information and Transparency, convenor Florence Forum June 2010.
Planning for allocation rules and the auction platform NRAs propose to follow a two-steps approach:. 2013: » Based on the wish-list and within the scope.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
ACER’s view on the future role of the Gas Regional Initiative Dennis Hesseling Head of the Gas Department, ACER 11 th Stakeholders group meeting of GRI.
ERGEG Advice Comitology Guidelines on Fundamental Electricity Data Transparency Florence Forum 13 December 2010 Bente Danielsen.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
The Capacity Allocation & Congestion Management Network Code An overview & status update Antonio Lopez-Nicolas Manager - Markets.
1 XVI Florence Forum Jose Sierra Madrid, 4 June 2009 Chair, RIG ERGEG Electricity Regional Initiative Update & Progress.
FUI Electricity region: Update on Congestion management CRE SG Meeting - 3 December 2008.
Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Draft Cross-regional roadmap for intraday Work in progress, for discussion 13 July 2011.
Draft cross-regional roadmap for Long-Term Transmission Rights Still work in progress, for discussion 27 June 2011.
Gent Summer School: Electricity Markets & Trading Gregory Michiels 27 August 2013.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
Lord Mogg Chair of ERGEG Florence Forum June 2009 Implementation of the Third Energy Package.
IG FUI, Brussels, 21 st of May European thinking on intraday target model.
Flow-based Allocations Mini Forum Central Western REM June 20 th, 2006.
1 page 1 Discussion on Intraday Capacity Pricing NWE ID project
1 IFIEC Energy Forum 22 November 2011 Electricity.
Electricity Regional Initiative Central South European Region Draft Report on Transparency for the CSE-Region Jan Müller Bundesnetzagentur ERI Central.
Tahir Kapetanovic ENM TF Co-Chair XIX Florence Forum, December 2010 Draft Pilot FG for Electricity Grid Connection.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Continuous Cross-Border Implicit Intraday Trade Status update XXI. Florence Forum Dec 05th, 2011.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Securing competitive energy for industry A “target model” on market integration from the perspective of industrial energy consumers Florence Forum Rome,
José Sierra, RIG Chair Rafael Gómez-Elvira (RIG Chair Team) XIX Florence Forum 14 December 2010 ERGEG Electricity Regional Initiatives Status Review.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Cross Border Intraday on the North Italian Borders Introduction Forum Rome, 13 th March 2012.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
GRI NW Investment - Update on project Common effort on making regional investment happen 21 September 2010.
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
Tahir Kapetanovic ENM TF Co-Chair XIX Florence Forum, December 2010 ERGEG Opinion on the ENTSO-E pilot TYNDP.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28 September 2010 Pilot framework guideline on capacity allocation in natural gas transmission.
Framework Guideline on gas balancing Martin Crouch, Ofgem 20th Madrid Forum September 2011.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Guidelines on Congestion Management ERGEG Public Hearing 30 June 2005 EuroPEX.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
Northern Mini Forum Copenhagen, 27 June 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
2 nd Mini-Forum for Central-Southern European Region EuroPEX Discussion Points Milan, 17 th of July 2006.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
Michael Schmoeltzer Member of ERGEG Gas Working Group GIE Annual Conference, 6/7 May 2009, Groningen ACER & ENTSOG and their interaction.
SESSION 1. Part 4 IMPORTANCE OF INTRADAY AND ADJUSTMENT MARKETS José Javier González Market Operations Director OMEL 2008 APEX Conference Sydney, October.
Status Report of the Electricity Regional Initiative Ms Asta Sihvonen-Punkka ERGEG Electricity Focus Group (EFG) Chair The Regional Initiatives: Progress.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren 20 th Madrid Forum, 26 Sept 2011.
Public Consultation : main conclusions (1/2)
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Background and Process
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
Tahir Kapetanovic ENM TF Co-Chair XIX Florence Forum
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
Presentation transcript:

Draft Framework Guidelines on Capacity Allocation and Congestion Management Florence Forum 13 December 2010 Alain Marien ENM TF co-chair

2XVIII Florence Forum, June th Florence Forum, December Context 17 th Florence Forum of December 2009 : Presentation of the Project Coordination Group (PCG) Target Model on Congestion Management Creation of the “Ad Hoc Advisory Group” AHAG to assist ERGEG and set up of three implementation projects Day-ahead and Governance, Intraday and Capacity Calculation end-March 2010, Commission invites ERGEG to draft a FG on CACM A specific project team created inside ERGEG ENM TF to draft the Initial Impact Assessment (IIA) and the draft Framework Guideline (FG) Workshop organised 18 October 2010 Public consultation on the draft FG closed on 10 November 2010

3XVIII Florence Forum, June th Florence Forum, December Problem identification Primary problem to be addressed: the inefficient and sub- optimal use of transmission network capacity between and within the control areas Current CACM methods have not enabled market liquidity and formation of reliable prices in day-ahead & forward electricity markets Strong adverse incentives for the TSOs to underestimate commercial available capacity have been created CACM methods do not sufficiently account for large-scale variable generation (e.g. taking into account loop flows)

4XVIII Florence Forum, June th Florence Forum, December Objectives Overarching objective: an optimal use of power generation plants and transmission across Europe Sub-objectives: 1.Optimal Use of Transmission Capacity 2.Reliable Prices and Liquidity in the Day-Ahead Market 3.Efficient Forward Electricity Market 4.Efficient Intraday Market

5XVIII Florence Forum, June th Florence Forum, December Policy options Capacity Calculation: CACM network code(s) shall foresee that TSOs define and implement either Flow-Based or ATC method Zone delimitation: A zone: = a bidding area, Objective: overall market efficiency, taking into account network topology Should contribute towards correct price signals Zone delimitation: proposed by TSOs, reviewed by NRAs

6XVIII Florence Forum, June th Florence Forum, December Policy options Capacity allocation methods for the day-ahead market: CACM network code(s) shall foresee that: TSOs, in cooperation with PXs, implement capacity allocation on the basis of implicit auctions via a single price coupling algorithm which determines at the same time the volumes and prices in all relevant zones Capacity allocation methods for the forward market: CACM network code(s) shall foresee that: the options for enabling risk hedging for cross-border trading are Financial Transmission Rights (FTR) or Physical Transmission Rights (PTR) with UIOSI (Use-It-Or-Sell-It) unless appropriate cross-border financial hedging instruments are offered in liquid financial markets.

7XVIII Florence Forum, June th Florence Forum, December Policy options Capacity allocation methods for the intraday market: CACM network code(s) shall foresee: The evolution of continuous implicit trading, including reliable pricing of intraday transmission capacity reflecting congestion (i.e. in case of scarce of capacity). This should include automatic matching and appropriate block bids and sophisticated products where needed When there is sufficient liquidity, implicit auctions may be implemented. In case of coexistence of both solutions, they should be coordinated. ERGEG plans to develop the ID method more prescriptively when finalising the CACM FGL

8XVIII Florence Forum, June th Florence Forum, December Next steps Public consultation – first comments: Zone definition: size (small, large, homogenous), transition process, liquidity, impact on other zones, assessment of benefits Intraday: recalculation of transmission capacities, OTC issue and single access point to the CMM, absence of discrimination, importance of price signal, obligatory use Long-term transmission rights: existence confirmed everywhere, length, volume calculated by TSOs, Interim solutions: necessary, not delay the target model, if well explained December 2010: evaluation of responses ( confidential) to the consultation document and new draft of the FG ERGEG approval: early 2011

9XVIII Florence Forum, June th Florence Forum, December Thank you for your attention!