24/03/99Report to LHCC Referees Muon Group Status Report Outline: Muon Filter - New Geometry - Support System Optimisation Studies - Pad, Strip and Pad/Strip.

Slides:



Advertisements
Similar presentations
Beam-plug and shielding studies related to HCAL and M2 Robert Paluch, Burkhard Schmidt November 25,
Advertisements

Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
ATLAS LHCC 28/11/00 A. Henriques/CERN 1 H8 : Pixel, SCT, TRT, Tiles, LAr em barrel, Muons SPS H6: EMEC, HEC, FCAL, Background studies GIF: Muons (MDT,
Wang Yi, Tsinghua University SoLID collaboration meeting, Status of MRPC-TOF 1 Wang Yi Department of Engineering Physics Tsinghua University,
Commissioning the PHENIX RPC Forward Trigger Upgrade Michael Daugherity Abilene Christian University for the PHENIX Collaboration.
E/π identification and position resolution of high granularity single sided TRD prototype M. Târzilă, V. Aprodu, D. Bartoş, A. Bercuci, V. Cătănescu, F.
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
Status of MRPC-TOF Wang Yi Department of Engineering Physics Tsinghua University, Beijing, China 1.
1 VCI, Werner Riegler RPCs and Wire Chambers for the LHCb Muon System  Overview  Principles  Performance Comparison: Timing, Efficiency,
Status of the LHCb RPC detector Giovanni Carboni - Roma 2 Introduction Detector requirements Ageing tests Oil vs. No-Oil Conclusions Report to LHCC - March.
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
PNPI in LHCb A.Vorobyov HEPD Scientific Board meeting, December 26,2003 Status report for 2003.
G. Carboni - Open LHCC - July 2001 Technical Design Report for the LHCb Muon System Giovanni Carboni on behalf of the Muon Group Part II: RPC Detectors,
D. Peterson, Muon Spectrometers at ATLAS and CMS, presentation to LEPP 19-Nov  spectrometers at ATLAS and CMS Our charge: Survivability Resolution.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
US CMS Phase 2 R&D Discussion 30-July-2013 “Phase 2 muon R&D” J. Hauser, UCLA  Add redundancy (power) to trigger where most needed  First and innermost.
18 June 20031Integration Review B. Schmidt Outline: Filter design and basic concept to ensure seismic stability Filter Installation and the required tooling.
2012 IEEE Nuclear Science Symposium Anaheim, California S. Colafranceschi (CERN) and M. Hohlmann (Florida Institute of Technology) (for the CMS GEM Collaboration)
October 28-th, 2005Straw tracker 1 Status of Straw Tracker for P236 P.L. Frabetti, V.Kekelidze, K.Kleinknecht, V.Peshekhonov, B.Peyaud, Yu.Potrebenikov,
Sept. 24, Status of GEM DHCAL Jae Yu For GEM-TGEM/DHCAL Group Sept. 24, 2010 CALICE Collaboration Meeting Univ. Hassan II, Casablanca Introduction.
15 th CBM collaboration meeting, GSI, Darmstadt, Germany, April 12-16, 2010Wang Yi, Tsinghua University R&D status of low resistive glass and high rate.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Monte Carlo Comparison of RPCs and Liquid Scintillator R. Ray 5/14/04  RPCs with 1-dimensional readout (generated by RR) and liquid scintillator with.
Precision Drift Chambers for the ATLAS Muon Spectrometer Susanne Mohrdieck Max-Planck-Institut f. Physik, Munich for the ATLAS Muon Collaboration Abstracts:
CMS Muon Chambers Long term studies at GIF++ Andrey Marinov On Behalf of Long Term Studies of the CMS Muon Detectors 1.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Muon Detector Jiawen ZHANG Introduction The Detector Choices Simulation The structure and detector design The Expected performance Schedule.
Detector R&D for Muon Chamber Anand K. Dubey For VECC group.
RPC detection rate capability ≈ 1/ρ Float-Glass ( Ω-cm) RPC rate capability < Bakelite( Ω-cm) one. New kind of doped glass was developed.
Prototypes of high rate MRPC for CBM TOF Jingbo Wang Department of Engineering Physics, Tsinghua University, Beijing, China RPC-2010-Darmstadt, Germany.
Malte Hildebrandt, PSIMEG - Review Meeting / 1   e  Drift Chambers Charge Division Test Chamber Testsetup for Cosmics Chamber Construction.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
M. Bianco On behalf of the ATLAS Collaboration
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
T. Kawamoto1 ATLAS muon small wheels for ATLAS phase-1 upgrade LHCC T. Kawamoto (New) small wheels ? Why new small wheels for high.
Report on beam test results of high-rate MRPCs Jingbo Wang Department of Engineering Physics, Tsinghua University, Beijing, China.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
Update on DHCAL and RPC progress Lei Xia ANL - HEP.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
Precision Drift Chambers for the ATLAS Muon Spectrometer
The LHCb Muon System and LAPE Participation Burkhard Schmidt CERN - EP/LHB Presented at the CNPq Workshop Rio de Janeiro, 12 January 1999.
NA62 straw readout Characterization and qualification of the frontend electronics Detector and interface to frontend Small readout system Plans Expected.
General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Recent developments:  ME0 inserted into HGCAL as for other.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
Marcello Abbrescia RPCs for CMS during Phase II RPC rate capability M. Abbrescia, The dynamic behaviour of Resistive Plate Chambers, NIM A 533 (2004) 7–10.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
LHCb Muon System TDR Outline: Introduction –Physics requirements –Background conditions Overview of the Muon System Physics Performance –L0 muon trigger.
( ATLAS was designed for LHC: L=10 34 cm -2 s -1 ) [ Now we expect 7.5 x instantaneous and 10 x integrated luminosity ] PILEUP: from ~30  >200 proton.
P.F.Ermolov SVD-2 status and experimental program VHMP 16 April 2005 SVD-2 status and experimental program 1.SVD history 2.SVD-2 setup 3.Experiment characteristics.
Future DHCAL Activities José Repond Argonne National Laboratory CALICE Meeting, CERN, May 19 – 21, 2011.
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
CMS – RPC GIF++ G. Pugliese on behalf of the RPC Collaboration 1.
Trigger & Tracking detector for CMS
MICROMEGAS per l’upgrade delle Muon Chambers di ATLAS per SLHC Arizona, Athens (U, NTU, Demokritos), Brookhaven, CERN, Harvard, Istanbul (Bogaziçi, Doğuş),
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Operation, performance and upgrade of the CMS Resistive Plate Chamber system at LHC Marcello Abbrescia Physics Department - University of Bari & INFN,
(University of Sofia “St. Kliment Ohridski”)
S.Movchan Straw prototype beam test into the NA48 infrastructure
ATLAS-MUON Trigger hardware developments
CMS muon detectors and muon system performance
Gaseous Beam Position Detectors, with Low Cost and Low Material Budget
Conceptual design of TOF and beam test results
MRPC -High Time Resolution Detector R&D at USTC CHINA Chen, Hongfang 2001/Oct. Oct.2001, Beijing MRPC,USTC.
Performance of a Multigap RPC prototype for the LHCb Muon System
Muon Detector Jiawen ZHANG 16 September 2002.
Pre-installation Tests of the LHCb Muon Chambers
Presentation transcript:

24/03/99Report to LHCC Referees Muon Group Status Report Outline: Muon Filter - New Geometry - Support System Optimisation Studies - Pad, Strip and Pad/Strip algorithms - Background Model Detector Technology and FE-Electronics Studies - MRPC R&D(CERN, UFRJ Rio) - RPC and TGC R&D (Rome I, Rome II) - CPC and WPC R&D(PNPI, CERN) - FE-Electronics(Cagliari, CERN, UFRJ Rio) Summary of Activities and Milestones for 1999

24/03/99Report to LHCC Referees Motivation: Iron blocks from WANF will be used to build the muon filter Dimensions: Muon shield 1 has 30 cm thickness in TP Muon shields 2-5 have 70cm thickness in TP Iron from WANF has 40cm and 80 cm thickness Consequences: -› The proposed new configuration has the same number of nuclear interaction length: 23 -› The particle fluxes in M2 will be slightly higher -› There will be less multiple scattering between M1 and M2  better P T measurement (?) New Muon Filter Geometry

24/03/99Report to LHCC Referees Muon System Support Structure Status: Preliminary studies have been done by S.Karpinnen in 1997/1998 (Technical Note EST/LEA/98-02) Constraints: Rails of DELPHI - endcap should be re-used if possible Clearance on cryogenics side is only 9.4m from BP at present, thus right part of muon stations cannot be moved out fully -›~12m clearance would simplify access to muon chambers significantly Consequences: -› Stations should be movable independent of absorber and of each other -› Chambers should be mounted on a frame hanging from the top -› Cables will be guided via the top Conceptual design for support structure under study in collaboration with infrastructure group

24/03/99Report to LHCC Referees Electronics and Cables Locations for electronics: Boards with a kind of ASD chip on the chambers Majority-logic and synchronization unit on the sides of the stations Muon Trigger- and- DAQ-Electronics in the Control Room Engineer from Cagliari is working on overall design for Muon FE-electronics

24/03/99Report to LHCC Referees Optimization Studies Goal: Significant reduction of electronics channels without deterioration of the physics performance Pad based algorithm : Optimization result ~15% less physical channels than TP ~25% less logical channels than TP physics performance: (cf. presentation of 22/10/98)

24/03/99Report to LHCC Referees Optimization Studies Goal: Significant reduction of electronics channels without deterioration of the physics performance Pad based algorithm : Optimization result ~15% less physical channels than TP ~25% less logical channels than TP physics performance: (cf. presentation of 22/10/98)

24/03/99Report to LHCC Referees Optimization Studies Rejection of Minimum-Bias-Events is achieved by: P T - cut between 1-2 GeV Choice of field of interest (FOI) -› implicit cut on muon momentum So far, only one x-FOI and one y-FOI per station has been used Improvement of performance possible with several FOI per station L0-Muon-Trigger:

24/03/99Report to LHCC Referees Optimization Studies Field of Interest Optimisation: optimal FIOs per region change with required Minimum Bias retention improves physics performance Performance for optimal pad geometry (as presented before)

24/03/99Report to LHCC Referees Optimization Studies Field of Interest Optimisation: optimal FIOs per region change with required Minimum Bias retention improves physics performance Performance for optimal pad geometry (as presented before)

24/03/99Report to LHCC Referees Optimization Studies Strip based algorithm :  Improvement of physics performance due to finer granularity using strips  ~25% reduction of physical and ~50% reduction of logical channels possible  Simplification of chamber construction  Less robust against background Layout: one pad plane to resolve ambiguities

24/03/99Report to LHCC Referees Optimization Studies Strip based algorithm :  strip layout is more sensitive to background than pads standard background background x2 background x3

24/03/99Report to LHCC Referees Background Studies Background Model : Realistic description of the background is mandatory to - determine the performance of the L0-Muon-Trigger (including safety factor) - choose a technology for the muon chambers Current Model is - based on old detector and beampipe description and low statistics - providing only additional hits in stations 2-5, no particles Updated model will take into account - better description of beampipe and its shielding - muon system geometry, chamber description and digitization - new physics generators - neutron efficiencies for gas containing H 2 … Production based on updated model will start in May 1999

24/03/99Report to LHCC Referees Optimization Studies Combined Pad / Strip layout : Pads in inner part of muon stations solve problem of high occupancy Strips in outer part allow significant reduction of physical / logical channels and provide better granularity -› improved physics performance Algorithm for combined Pad / Strip layout with FOI optimization ready

24/03/99Report to LHCC Referees Optimization Studies Trigger implementation: Several geometries have been looked at from trigger implementation point of view, running the fast identification and the theoretical algorithm Combined pad/strip layout with strips in outer part of stations 2-5, pads in station 1and inner part of stations same granularity as TP - 33% reduction of logical channels Algorithm efficiency for B   X: Note sensitivity to background

24/03/99Report to LHCC Referees MRPC R&D Participants: CERN, UFRJ Rio groups Status: First prototype (30cm  30cm) : - studied in testbeam in various configurations - ongoing tests with cosmic rays - timing properties are according to expectations (cf. presentation of 22/10/98) - rate capability of a few kHz/cm 2 has been achieved - problems with chamber noise at high rate not yet under control Second prototype (230cm  130cm) : - Construction techniques have been developed - Chamber soon ready for tests with cosmics (beam tests scheduled for May)

24/03/99Report to LHCC Referees MRPC R&D Testbeam Results: time walk: ~ 1.5ns/kV time resol.: 1.5ns

24/03/99Report to LHCC Referees MRPC R&D Status: FE-electronics board with better control of threshold has been designed - PCB is in preparation - continue tests with ASD8-B from UPenn Gas system with mass-flowmeters available for this years beam tests -›Improved control of gas mixture Plans for this year : Test small prototype with 4  0.7mm gas gap, plates of lower resistivity (a few  cm) and new FE-electronics board end of April at PS -›Allows to operate chamber at lower HV; expect improved performance Test large chamber end of May with SPS-beam Test small chamber in GIF end of June

24/03/99Report to LHCC Referees RPC R&D Participants: Rome II RPC construction done in Italian industry (as for ATLAS and CMS) Status: Prototype of Single Gap RPC with - plates of low resistivity (8  10 9  cm) - 48cm  48cm active area - 16 strips with 3cm pitch along x - 16 strips with 3cm pitch along y - standard electronics with 10  30 amplification - gas mixture: C 2 H 2 F 4, iso-C 4 H 10, optional: SF 6 - studied in testbeam in November 1998

24/03/99Report to LHCC Referees RPC R&D Testbeam Results: time resolution ~2 ns 1-2% SF 6 in gas mixture no SF 6 in gas mixture

24/03/99Report to LHCC Referees RPC R&D Plans for this year : Two Double gap RPCs have been produced - using plates of low resistivity (a few 10 9  cm) - active area of 50cm  50cm and 25 strips of 2 cm pitch - tests scheduled for end of April (PS) and end of May (SPS) - tests in GIF end of June -›Expect improved performance w.r.t. rate capability and cross talk FE-Electronics: Tests with fast GaAs-Electronics (as for ATLAS RPC) foreseen in August

24/03/99Report to LHCC Referees TGC R&D Participants: Rome I TGC construction done in collaboration with G.Mikenberg Status: Simple TGC prototype has been tested in November 1998 at the PS - 1.8mm wire spacing - gas mixture: CO 2 and n-C 5 H 12 TGC charge distributionTGC time distribution

24/03/99Report to LHCC Referees TGC R&D Plans for this year : Two twin TGCs have been ordered - sensitive area: 25cm  80 cm - wire spacing 1.8mm, staggered - Resistance of graphite layer: ~200 k   - tests foreseen in July at the SPS

24/03/99Report to LHCC Referees CPC R&D Participants: PNPI St.Petersburg Status: First prototype with pads of different size has been constructed at PNPI together with its FE-Electronics and tested in November 1998 at the PS - wire spacing: 2mm - preferred gas mixture: 30% CO 2, 60% Ar, 10% CF 4

24/03/99Report to LHCC Referees CPC R&D Results : Time distributions Prototype performed very well Testbeam measurements are in good agreement with MC-simulations No deterioration up to very high rates cross-talk to neighbouring pads: ~5% charge distribution

24/03/99Report to LHCC Referees CPC and WPC R&D Plans for this year : Continue studies with CPC prototype Work on backup-solution for outer region: WPC / WSC (Proportional chamber with simple construction) - sensitive area: 16cm  150 cm - 2 gaps of 5mm each, wires staggered, spacing 1.5mm - tests foreseen from May onwards at the PS and SPS

24/03/99Report to LHCC Referees Activities and Milestones for 1999 Optimization Studies: propose optimal and realistic layoutMay study robustness against backgroundJune check feasibility of trigger implementation June -›Decide on muon system layoutJuly Detector Technology and FE-electronics Studies: first round of tests for various technologiesApril-July preliminary decision on technologiesAugust second round of tests for selected technologies Aug.-Nov. test of FE-chip candidates (Lab and testbeam)April-Nov. -›Choice of technologies December

24/03/99Report to LHCC Referees Activities and Milestones for 1999 Optimization Studies: propose optimal and realistic layout study robustness against background check feasibility of trigger implementation -›Decide on muon system layout July Detector Technology Studies: first round of tests for various technologies preliminary decision on technologies second round of tests for selected technologies test of FE-chip candidates (Lab and testbeam) -›Choice of technologies Januar 2000