1 CONFIDENTIAL Project information Contact Construction of Solar Power Plant “Kapshagay Solar” 50MWt in Almaty Region Project profitability for the period.

Slides:



Advertisements
Similar presentations
Wind farm project “Pakline – Ljubusa – Kupres” Sarajevo, 15 March 2011.
Advertisements

L/O/G/O Green Energy Projects Opportunities for Cooperation Opportunities for Cooperation.
DMICDC  Landscaping & signage  Street lighting  Building works  Telecommunications  Gas grid  Captive power plant  Renewable energy plant  Light.
Kyrgyzstan Business Outreach Forum Athens, April 2-3, 2009.
„We can together use the power of water”. 73,000 Gorazde, Žilići bb, Bosnia and Herzegovina Goražde Sarajevo 55 km.
STATE STOCK - JOINT COMPANYO’ZBEKYENGILSANOAT 1 TEXTILE INDUSTRY OF UZBEKISTAN: POTENTIAL TO RISE & OPPORTUNITY TO INVEST.
Tunisian project portfolio CDM Investor Forum DJERBA, September 2004.
Astana - November 2008 “Break Through Projects of the National Company “KazMunayGas”
2012 Investment project of cement plant construction in Soligalich municipal district of the Kostroma region.
The Komi Republic (KR)is the subject of the Russian Federation, a part of the North-West Federal District. Area thousand sq. km. Population -
1 Role of the African Development Bank in Developing Clean Investments Mrs. Hela Cheikhrouhou – Manager Infrastructure Finance, Private Sector Operations,
1 Ongoing strategy of development and reconstruction of electricity sector of Tajikistan Rafika Musaeva Chairman of Association of Energy of Tajikistan.
The New Energy Landscape: Key drivers of the Energy Future.
Investment project of Ferghana plant of chemical fiber Olim F. Maksudov Director General.
INVESTMENT OPPORTUNITIES IN CROATIA EMBASSY OF THE REPUBLIC OF CROATIA BRUXELLES.
Investment project of KINAP Open Joint Stock Company Mr. Refat Gafarov Deputy Director General CK.
2010 December Kazyna Capital Management Kazakhstan fund of funds Corporate presentation.
NEGS Geosphere Production and processing of raw materials at the kaolin, feldspar and quartz field in Northern Kazakhstan. Bissembaevskoye Deposit.
Investment Project Construction of Multi-purpose Marine Complex of Terminals (MMCT) “Galitsyno”
Future Jordan Virtual Power Plant EEEMF Jordan 2015 Energy Economy & Energy Management Forum For Mena & Fourth Renewable Energy National Dialogue –Amman.
April, Investor presentation.
1 Wind Power - An Investor’s Perspective Short Term Profit and Long Term Value Gavin Smith Dragon Capital Clean Development Fund.
Geothermal Heating System in the City of Bijeljina Bijeljina, City of Bijeljina City of Bijeljina Bosnia and Herzegovina.
Investment Opportunities in WEST SUMATERA Jakarta
Национальное агентство по экспорту и инвестициям Investor Support Centre within «KAZNEX INVEST» JSC (Investment Ombudsman Services) 1.
Creation of industrial complex for extraction and complex waste-free processing of peat with acquisition of soil modificator «AridGrow» for production.
Construction of greenhouse complex to grow tomatoes and cucumbers in Boguchar town, Voronezh region. Annual capacity by 3 operation year: 2 474,8 t of.
Health resort project “Bosna - AS” Sarajevo, 2015.
Energising your Budgets Bruce Pittingale Carbon Special Reserve
1 19 th World Energy Congress – 2004 Round Table 1 – Non Fossil Fuels: Will They Deliver? Jerson Kelman President, Brazilian Water Agency - ANA.
Investment perspectives of localization of Russian and foreign enterprises for mining service equipment and techniques production on the territory of Kirovsk.
NEW POSSIBILITIES OF THE BULGARIAN ENERGY SECTOR IN CONNECTION TO CO-OPERATION AND RESEARCH PROJECTS FOCUSED ON PRIORITIES OF THE 6-TH FRAMEWORK PROGRAMME.
1 CONFIDENTIAL Acquisition and greenfield investment opportunities in machinery industry in Kazakhstan October 2015 This Presentation does not constitute.
1 CONFIDENTIAL Madi Kanafin Senior specialist at Sectorial department on transport and logistics infrastructure, KAZNEX INVEST, JSC Mob:
1 CONFIDENTIAL Acquisition and greenfield investment opportunities chemical and petrochemical industries in Kazakhstan October 2015 This Presentation does.
1 CONFIDENTIAL Acquisition and greenfield investment opportunities in agriculture and food processing industry in Kazakhstan October 2015 This Presentation.
1 CONFIDENTIAL Project information Contact Organization of production of steel welded pipes with diameter Ø 273 – 630 мм Project profitability for the.
1 CONFIDENTIAL Acquisition and greenfield investment opportunities in pharmaceutical and medical equipment industries in Kazakhstan November 2015 This.
GOVERNMENT OF THE KINGDOM OF LESOTHO Water and Sewerage Company (WASCO) Greater Maseru Water Supply Feasibility Study & Preliminary Design Results of Financial.
ALMATY REGION.  Population 2,0 mln people  Area 224,000 km2  Capital city - Taldykorgan  16 administrative districts  GRP: 2014 – 9,2 bln USD 2010.
1 CONFIDENTIAL Acquisition and greenfield investment opportunities in dairy producing industry in Kazakhstan January 2016 This Presentation does not constitute.
National export and investment agency “KAZNEX INVEST” JSC
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
© «Samruk-Green Energy» LLP BRIEF COMPANY OVERVIEW March «Samruk-Green Energy» LLP Bagdat Oral Project Manager.
1 CONFIDENTIAL Acquisition and greenfield investment opportunities in animal feedlot and meat processing industries in Kazakhstan January 2016 This Presentation.
1 CONFIDENTIAL Acquisition and greenfield investment opportunities in grain industry in Kazakhstan January 2016 This Presentation does not constitute an.
Location The park is located between the major centers of consumption in Russia Industrial Park MSB-Udomlya is located in the Tver region. The developed.
Presentation of the investment potential of the company for the organization of production in the engineering sector The city of ORSK, ORENBURG REGION,
PRESENTATION OF SMOLENSK REGION
Ertis Social and Enterprise Corporation National Company JSC.
London 2062 Symposium London’s Energy Future Peter North 19 th March 2012.
1. Initiator and goals of the project Initiator of the project – the Investment Promotion Agency of Novosibirsk region – a specialized organization for.
Republic of Kazakhstan Kim Violetta, Graduate of Kazakh National University Republic of Kazakhstan Kim Violetta, graduate of the Kazakh National University.
Factors of attractiveness of the investment climate in Kazakhstan JSC “NATIONAL EXPORT & INVESTMENT AGENCY “KAZNEX INVEST” Ministry of Industry and New.
2016. Abdi Ibrahim Global Pharm LLP  Pharmaceutical plant for production of medicines in accordance with the GMP standards of the Republic of Kazakhstan.
ASTANA BENCHMARKING: International experts opinion and recommendations ,700 TWh According to international experts global energy resources.
1 Construction of the waste incineration plant with the mini-CHP in Izhevsk 2015 Preliminary presentation.
STRATEGY OF LOCAL GOVERNMENT IN THE WASTE MANAGEMENT IN KIEV
Cooperation Potential in Oil and Gas Sector of Uzbekistan
Investment Opportunity
Chair of Education and Culture Commission Prof. Tamar Taliashvili
Construction of multi-storey apartments
Construction of a new international terminal in Shymkent
Prospects for cooperation in the field of energy
DCC Cluster/Working Group Energy MTDS (GoT) priorities for the sector
PROJECT OF CONSTRUCTION OF POWER STATION ON BIOMASS 76 MW
CONSTRUCTION PROJECT IN YAGOTYN DISTRICT, KIEV REGION
Energy Efficiency investments European Investment Bank
Construction of Balkhashskaya TPS
Renewable Energy Project Investments
Presentation transcript:

1 CONFIDENTIAL Project information Contact Construction of Solar Power Plant “Kapshagay Solar” 50MWt in Almaty Region Project profitability for the period of 7 years (in th. USD) Project profitability Project cost: USD 114 mln. Location: Almaty region Implementation period: Project scope: Construction of Solar Electric Power Plant with 50 MWt in Almaty Region to supply electricity. Finished product: Electricity Production capacity: Annual Electricity Output – up to 73,9 million KWt*h per year Potential markets: Republic of Kazakhstan Provision of land and premises: Possibility of communication connection (electric power, water, canalization and other): The Line 220 KWt will be projected. No Project for Water Supply. Availability of transport infrastructure (existing Road Kapshagay – Bakanas). Required financing: USD 114 mln. Required investor type: Payback Period Payback Period disc. PI Project capex Project NPV Project IRR Company name JSC “Reliable High Technology” Year of establishment 2005 Presence on the market: - Developed brands: - Current operation: - Project initiator Project profitability ☑ Equity ☑ Debt ☐ Technology transfer ☐ Other Contact information Project initiator’s contacts: JSC “Reliable High Technology” Ruslan Dzhumagaliyev Manager at Sectoral department for Energy, KAZNEX INVEST, JSC Tel.: (ext. 1072)

2 CONFIDENTIAL Project information Contact Construction and operation of Wind Power Plant 300 MW in the Shelek wind соrridor Project profitability for the period of 7 years (in th. USD) Project profitability Project cost: USD 420 mln. Location: Almaty region Implementation period: Project scope: Almaty region (3,5 mln. population, 0,225 mln sq. km). During 30 years suffers from deficit of 4 bln. kW-hour per year. Power is supplied and distributed from the north of Kazakhstan, by distance 1500 km with large losses ( 30%). Finished product: Electricity Production capacity: 300 MW WPP, output of 960 mln. kW-hour per year. Potential markets: RK, Almaty region Provision of land and premises: Possibilities of formation of the minimum authorized capital by Kazakhstani companies (30% from total cost of project) for attraction of financing. There is a rail way on a distance of 10 km from the WPP site and international high way on a distance of 14 km. There are two local roads for WT delivery on site. Required financing: USD 420 mln. Required investor type: Payback Period Payback Period disc. PI Project capex Project NPV Project IRR Company name «EcoWatt» LLP Year of establishment 2009 Presence on the market: - Developed brands: - Current operation: - Project initiator Project profitability ☑ Equity ☑ Debt ☐ Technology transfer ☐ Other Contact information Project initiator’s contacts: «EcoWatt» LLP Ruslan Dzhumagaliyev Manager at Sectoral department for Energy, KAZNEX INVEST, JSC Tel.: (ext. 1072)

3 CONFIDENTIAL Project information Contact Construction of 48 MW wind power station nearby Arkalyk city in Kostanay region Project profitability for the period of 7 years (in th. USD) Project profitability Project cost: USD 115 mln. Location: Kostanay region Implementation period: Project scope: Construction of a wind power plant with the capacity of 48 MW using wind potential nearby Arkalyk city. Finished product: Electricity Production capacity: According to preliminary project data the following parameters can be defined: annual power output is 143 million kW/h, number of hours of set capacity use is 2,483MW WPP. Potential markets: RK, Kostanay region. Provision of land and premises: Company is ready to co-invest up to 35% from the total cost of the project. Required financing: USD 75 mln. Required investor type: Payback Period72 months Payback Period disc. PI Project capex Project NPV Project IRR27.6 Company name "Kaz Wind Energy" LLC Year of establishment - Presence on the market: - Developed brands: - Current operation: - Project initiator Project profitability ☑ Equity ☑ Debt ☐ Technology transfer ☐ Other Contact information Project initiator’s contacts: "Kaz Wind Energy" LLC Ruslan Dzhumagaliyev Manager at Sectoral department for Energy, KAZNEX INVEST, JSC Tel.: (ext. 1072)

4 CONFIDENTIAL Project information Contact Construction of hydro power station in South-Kazakhstan region Project profitability for the period of 7 years (in th. USD) Project profitability Project cost: USD 2 mln. Location: South - Kazakhstan region Implementation period: 2018 Project scope: Use of renewable energy sources and reducing the deficit of electric power in region. Finished product: Electricity Production capacity: 1.8 MWt. Potential markets: RK, South - Kazakhstan region. Provision of land and premises: We have all required materials. Required financing: USD 2 mln. Required investor type: Payback Period Payback Period disc. PI Project capex Project NPV Project IRR Company name «Kelesgidro- stroy» LLC MHES «Mamyt» Year of establishment Presence on the market: - Developed brands: - Current operation: - Project initiator Project profitability ☑ Equity ☑ Debt ☐ Technology transfer ☐ Other Contact information Project initiator’s contacts: «Kelesgidro-stroy» LLC MHES «Mamyt» Ruslan Dzhumagaliyev Manager at Sectoral department for Energy, KAZNEX INVEST, JSC Tel.: (ext. 1072)

5 CONFIDENTIAL Project information Contact Construction of hydro power station in South-Kazakhstan region Project profitability for the period of 7 years (in th. USD) Project profitability Project cost: USD 3 mln. Location: South - Kazakhstan region Implementation period: 2017 Project scope: Use of renewable energy sources and reducing the deficit of electric power in region. Finished product: Electricity Production capacity: 3 MWt. Potential markets: RK, South - Kazakhstan region. Provision of land and premises: - Required financing: USD 3 mln. Required investor type: Payback Period Payback Period disc. PI Project capex Project NPV Project IRR Company name «Kelesgidro- stroy» LLC MHES «Shanyshkyly» Year of establishment Presence on the market: - Developed brands: - Current operation: - Project initiator Project profitability ☑ Equity ☑ Debt ☐ Technology transfer ☐ Other Contact information Project initiator’s contacts: «Kelesgidro-stroy» LLC MHES «Shanyshkyly» Ruslan Dzhumagaliyev Manager at Sectoral department for Energy, KAZNEX INVEST, JSC Tel.: (ext. 1072)

6 CONFIDENTIAL Project information Contact Construction of hydro power station in South-Kazakhstan region Project profitability for the period of 7 years (in th. USD) Project profitability Project cost: USD 2 mln. Location: South - Kazakhstan region Implementation period: 2016 Project scope: Use of renewable energy sources and reducing the deficit of electric power in region. Finished product: Electricity Production capacity: 3 MWt. Potential markets: RK, South - Kazakhstan region. Provision of land and premises: - Required financing: USD 2 mln. Required investor type: Payback Period Payback Period disc. PI Project capex Project NPV Project IRR Company name «Kelesgidro- stroy» LLC MHES «Azamat» Year of establishment Presence on the market: - Developed brands: - Current operation: - Project initiator Project profitability ☑ Equity ☑ Debt ☐ Technology transfer ☐ Other Contact information Project initiator’s contacts: «Kelesgidro-stroy» LLC MHES «Azamat» Ruslan Dzhumagaliyev Manager at Sectoral department for Energy, KAZNEX INVEST, JSC Tel.: (ext. 1072)

7 CONFIDENTIAL Project information Contact Construction of the cascade of Chazinskiy HPP-1,2,3,4 station Project profitability for the period of 7 years (in th. USD) Project profitability Project cost: USD 88 mln. Location: Almaty region Implementation period: Project scope: Production of electricity using renewable energy sources for electricity consumers of Almaty region. Finished product: Electricity Production capacity: 206,8 mln. Kw/h Potential markets: RK, Almaty region. Provision of land and premises: - Company is ready to co-invest up to 20% from the total cost of the project. Required financing: USD 70.4 mln. Required investor type: Payback Period 100 months Payback Period disc. 170 months PI Project capex Project NPV Project IRR13% Company name "ASPMK-519" LLP Year of establishment Presence on the market: - Developed brands: - Current operation: - Project initiator Project profitability ☑ Equity ☑ Debt ☐ Technology transfer ☐ Other Contact information Project initiator’s contacts: "ASPMK-519" LLP Ruslan Dzhumagaliyev Manager at Sectoral department for Energy, KAZNEX INVEST, JSC Tel.: (ext. 1072)

8 CONFIDENTIAL Project information Contact Construction of solid waste processing plant in Kostanay city Project profitability for the period of 7 years (in th. USD) Project profitability Project cost: USD 46.8 mln. Location: Kostanay region Implementation period: Project scope: - Finished product: - Production capacity: - Potential markets: RK, Local garbage collector and recycling Tazalyk-2012 LLC, Kostanay city. Provision of land and premises: - Required financing: USD 46.8 mln. Required investor type: Payback Period 6 months Payback Period disc. PI Project capex Project NPV Project IRR22.1% Company name "LBM" LLC Year of establishment Presence on the market: - Developed brands: - Current operation: - Project initiator Project profitability ☑ Equity ☑ Debt ☐ Technology transfer ☐ Other Contact information Project initiator’s contacts: "LBM" LLC Ruslan Dzhumagaliyev Manager at Sectoral department for Energy, KAZNEX INVEST, JSC Tel.: (ext. 1072)

9 CONFIDENTIAL Project information Contact Solar farm construction in South-Kazakhstan region Project profitability for the period of 7 years (in th. USD) Project profitability Project cost: USD 50 mln. Location: South - Kazakhstan region Implementation period: Project scope: - Construction of a solar farm with the capacity nearby Shymkent city. Finished product: - Electricity Production capacity: 20 MWt. Potential markets: RK, South - Kazakhstan region. Provision of land and premises: - Company is ready to co-invest up to 30% from the total cost of the project. Required financing: USD 35 mln. Required investor type: Payback Period 120 months Payback Period disc. PI Project capex Project NPV Project IRR Company name Promondis Каzakhstan LLP Year of establishment - Presence on the market: - Developed brands: - Current operation: - Project initiator Project profitability ☑ Equity ☑ Debt ☐ Technology transfer ☐ Other Contact information Project initiator’s contacts: Promondis Каzakhstan LLP Ruslan Dzhumagaliyev Manager at Sectoral department for Energy, KAZNEX INVEST, JSC Tel.: (ext. 1072)

1010 CONFIDENTIAL Project information Contact Construction of Kiyat small hydro power station Project profitability for the period of 7 years (in th. USD) Project profitability Project cost: USD 2.33 mln. Location: South - Kazakhstan region Implementation period: 2019 Project scope: - Use of renewable energy sources and reduction of electrical power deficit. Finished product: - Electricity Production capacity: 1.8 MWt. Potential markets: RK, South - Kazakhstan region. Provision of land and premises: - Company is ready to co-invest up to 20% from the total cost of the project. Required financing: USD 1.86 mln. Required investor type: Payback Period 84 months Payback Period disc. PI Project capex Project NPV Project IRR Company name Кelesgidrostroy LLP Year of establishment 2013 Presence on the market: - Developed brands: - Current operation: - Project initiator Project profitability ☑ Equity ☑ Debt ☐ Technology transfer ☐ Other Contact information Project initiator’s contacts: Кelesgidrostroy LLP Ruslan Dzhumagaliyev Manager at Sectoral department for Energy, KAZNEX INVEST, JSC Tel.: (ext. 1072)