Cosmic Vision Process 2015-2025 Cosmic Vision 2015 –2025 process launched on 2 April 04 with call for Science themes June 04: deadline for proposal submission.

Slides:



Advertisements
Similar presentations
Delivering as One UN Albania October 2009 – Kigali.
Advertisements

Work Plan Development Guidelines and Schedule.
Space Science Project Funding by the German Space Agency (German Aerospace Center, DLR) Werner Klinkmann, DLR Space Agency, Bonn.
ESAs Cosmic Vision David Southwood Director of Science and Robotic Exploration European Space Agency Paris, France 16 January 2009 International Year of.
Panel created in 2001 as part of restructuring of PPARC Advisory Structure One of five advisory panels: Astronomy Advisory Panel (AAP) Solar System Advisory.
ATHENA WFI Meeting Garching, January 28, 2014 Markus Plattner.
Oregon State Library Transformation Project Launch
NMP-NCP meeting - Brussels, 27 Jan 2005 Towards FP 7: Preliminary principles and orientations… Nicholas Hartley European Commission DG Research DG Research.
1 Planetary probes: ESA Perspective Jean-Pierre Lebreton ESA’s Huygens Project Scientist/Mission Manager ESA’s EJSM & TSSM Cosmic Vision Study Scientist.
Dr. Mark Price: Spring  We will go through the procedure of a real example of the mission proposal and selection process.  In 1 or 2 lectures.
LISA in the light of eLISA, April 2013PhysPAG APS, Denver LISA in the light of eLISA Neil Cornish for GWSAG APS Meeting Denver
NEAT: Very high precision astrometry to detect nearby planetary systems down to one Earth mass F. Malbet, A. Crouzier, M. Shao, A. Léger and the NEAT collaboration.
CMB Decadal Study: What We Did Activities funded by NASA proposal: PI Steve Meyer + entire CMB community Workshops: The Path to CMBPOL: Upcoming Measurement.
CWA §319 Grants General Conditions Grant Types Grant Format Timelines The Awards Reporting Note: § 319 monies are reimbursable grants.
2006 IPS Implementation 2007 Roadmap Dept. of Strategy & Donor Coordination December 21, rd Meeting of IPS Support Group Council of Ministers.
Cosmic Vision 2015 – 2025 ESA’s new long term plan for space science.
E.Plagnol - Auger-Leeds ESA-Cosmic Vision A Letter of Intent on "Particle Astronomy" ë The context of Cosmic Vision ë "Particle Astronomy"
1 Briefing to the CAA on the Terrestrial Planet Finder (TPF): Finding and Characterizing Earth-like Planets Zlatan Tsvetanov, NASA Program Scientist Charles.
European roadmap for fundamental physics in space conducted by FPAG P. Binétruy, APC, Paris chair of FPAG From quantum to cosmos, Airlie Center, 07 July.
NASA Living with a Star Program Targeted Research & Technology Steering Committee NASA HQ & LWS TR&T Update September 16, 2008 Doug Rowland On Detail to.
TARANIS a CNES Scientific Mission – C. Bastien-Thiry Workshop on Coupling of Thunderstorms and Lightning Discharges to Near-Earth Space – Corte 2008 TARANIS.
2005 VSBA Strategic Planning Service Provided by: Vermont School Boards Association.
Progress Report, June 2010 Misha Belkindas Development Data Group, World Bank.
1 Astronomy & Physics Division ASTRONOMY & PHYSICS DIVISION STATUS & PLANNING PHILIPPE CRANE Origins Theme Scientist Baltimore, Md. February 26, 2004.
New York State Council on the Arts Art Grant Program.
1 An Overview of R&D Budgeting in Korea Symposium on International Comparison of the Budget Cycle in Research Development and Innovation Policies Madrid,
SECRETARIAT WORK PROGRAMME update 2009 PARIS21 Steering Committee meeting OECD Conference Centre 4 June 2009.
A Strategic Economic Plan for the Humber. Overview An overarching economic strategy for the Humber Forms the basis of a Growth Deal with Government Contains.
Minnesota Continuous Improvement Process: Program Evaluation Report Writing Post School Outcome and Parent Survey Minnesota Department of Education Conference.
Harvey Tananbaum Director Chandra X-ray Center Harvard-Smithsonian Center for Astrophysics 13th HEAD Meeting April 8, 2013 Building International Space.
Homeland Security Grant Program 2015 Process Michelle Hanneken Illinois Emergency Management Agency.
WQ Partnership September 5 th,  26 grant and loan programs  1,138 active agreements totaling $954M as of June 2012  450 new grant and loans totaling.
1 Support for New Research Infrastructures in the EU 7 th Framework Programme for Research Elena Righi European Commission SKADS Workshop, Paris, 4 September.
ESA SUPPORT TO SOLAR B The Norwegian Proposal Bo Andersen Norwegian Space Centre.
Prospects in space-based Gamma-Ray Astronomy for Europe --- Objective of the meeting Jürgen Knödlseder Centre d’Etude Spatiale des Rayonnements, Toulouse,
SOFIA 2 nd Generation Instrument Plans & Technology Development Paul Hertz SOFIA Program Scientist & SMD Chief Scientist SOFIA Science Steering Committee.
The ESA Science Program for the progress of European society Luigi Colangeli Head, ESA Solar System Missions Division and Coordinator, ESA Solar System.
MMO-SWG #3[Mar ] BepiColombo Project & MMO Science Schedule H. Hayakawa, Y. Kasaba, M. Kato, T Mukai, and JAXA BepiColombo Project.
PARIS21 Steering Committee26 April 2006 PARIS21 Steering Committee, Paris, 26 April 2006 PARIS21 Work Programme for 2006.
July June 2014 Presented by Leah Howard & Ryan White Upper Dublin School District Educational Technology Plan.
1 Preparation of Six-Year ED Sector Programme Cycle and its 1st biennium Advantages -Real alignment of biennial C/5 (within 6-year ED Programme Cycle)
1 ASTRONET Coordinating strategic planning for European Astronomy.
Institute for Astronomy and Astrophysics, University of Tübingen June 28, 2006WSO/UV Implementation Committee Meeting Moscow 1 WSO/UV: Situation in Germany.
What European needs to do to take the lead in Space Astronomy ESO Astronomy Faculty May 2004.
Programs and plans ASI - Observation of the Universe.
Astrophysics Missions in ESA’s Cosmic Vision Program
JASPERS for CEF Stéphane OUAKI Head Of Unit
IPA, component I: Transition assistance and institutional building Programming process for 2009 Sarajevo, BOSNA I HERCEGOVINA Council of Ministers.
LISA News from ESA O. Jennrich LISA Project Scientist.
Community Planning Training 8-1. Community Planning Training 8- Community Planning Training 8-2.
SPC Advisory Committee Training - TAC Fall 2015 Institutional Research President’s Office 1 Abridged from the SPC Advisory Committee Training on October.
SPC Advisory Committee Training Fall 2015 Institutional Research President’s Office SPC 10/9/20151.
Texas A&M University at Galveston Strategic Planning Process Proposal.
EN Regional Policy EUROPEAN COMMISSION Upcoming events and news, Communication actions, success stories, evaluation, OPEN DAYS 2006 SFIT, 15 June 2006.
Richard Escritt, Director – Coordination of Community Actions DG Research, European Commission “The development of the ERA: Experiences from FP6 and reflections.
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
The Lead Agency Council Sports Trust (Sport Otago) Cluster of clubs Interested parties / other.
Planetary Data Archiving Activities at the Italian Space Agency (ASI) Maria Teresa Capria INAF – IAPS, Rome, Italy Paolo Giommi ASI, Rome, Italy International.
Workshop proposal to the Science Committee Solar Wind – Comet Surface Interaction.
ASI Science Programme Barbara Negri - Italian Space Agency (ASI) Head of Exploration and Observation of the Universe Department 10 Years of PAMELA.
Korea Aerospace Research Institute (KARI)
Astro-G/VSOP-2 in Europe JIVE, Dwingeloo, The Netherlands
Revision 1 to Document CWG-SFP-2/7-E 12 September 2017 Original: English Process and timetable for The elaboration of the ITU STRATEGIC and financial.
Working Group on cultural statistics - Luxembourg 30 June/1 July 2008
PIDA Status, Next Steps & Challenges
Planning Process Strategic Plan Operational Priorities
Strategic Planning Timeline Overview
ASTRONET Coordinating strategic planning for European Astronomy
Czech participation in ESA PRODEX
Visions and Voyages: The Planetary Decadal Survey
Presentation transcript:

Cosmic Vision Process Cosmic Vision 2015 –2025 process launched on 2 April 04 with call for Science themes June 04: deadline for proposal submission July 04: Analysis of responses by the ESA Science advisory bodies (AWG, SSWG, FPAG, SSAC) September 04: Workshop in Paris (~400 participants) Nov 04: progress report to SPC Spring 05: presentation of Cosmic Vision to community May 05: Final Presentation of Cosmic Vision to SPC Oct 05: Publication of final report early 2006: call for mission proposals? Phase A 2007 Phase B 2008 launch 2015

Proposal Evaluation Astronomy/Astrophysics (AWG) Fundamental Physics (FPAG) Solar System Science (SSWG) Space Science Advisory Committee (SSAC)

Grand Themes What are the conditions for life and planetary formation? How does the Solar System work? What are the fundamental laws of the Universe? How did the Universe originate and what is it made of?

How to implement Think programmes not missions for cost effective science –Rosetta -> MEX -> VEX (not planned) –BepiColombo -> SolO (planned) -> SPO -> IHP –NIRI -> FIRI XEUS -> GRI Consider investment as a priority in strategic technologies –RTG –Deep space coms –Solar SailsRadiation hard (1 Mrad) components Invest early in key payload areas –ASIC’s (analogue/digital hybrids) –Highly integrated payload suites –Novel Low mass deployable Optics Formation flying –Constellation control –Common GNC and metrology –Standard SVM

ESA Budget NEWS: Ministers agreed that ESA's science programme will receive €2.1bn over the next five years, which is what the agency had asked for. This means that funding for science will rise by 2.5% per year, keeping it in line with inflation. Previously the science budget had remained flat and there was therefore "an erosion of buying power" in ESA speak. ESA spokesman Franco Bonacina says that the Bepi-Colombo mission to Mercury, due to take off in 2012 but which some had feared may be axed, should now be safe. loan reimbursement GAIA, BepiColumbo, LISA envelopes JWST launcher

Cosmic Vision Process Cosmic Vision 2015 –2025 process launched on 2 April 04 with call for Science themes June 04: deadline for proposal submission July 04: Analysis of responses by the ESA Science advisory bodies (AWG, SSWG, FPAG, SSAC) September 04: Workshop in Paris (~400 participants) Nov 04: progress report to SPC Spring 05: presentation of Cosmic Vision to community May 05: Final Presentation of Cosmic Vision to SPC Oct 05: Publication of final report early 2006: call for mission proposals? Phase A 2007 Phase B 2008 launch 2015