SOUTH SOUTH-EAST GAS REGIONAL INITIATIVE WORK PLAN 2011-2014 Francesco Cariello, AEEG 20 th Madrid Forum, 26-27 September 2011.

Slides:



Advertisements
Similar presentations
1 TITRE Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11 th Stakeholder Group meeting GRI.
Advertisements

The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
Vienna, 8 April th IG Meeting Meeting Guide.
ACER’s view on the future role of the Gas Regional Initiative Dennis Hesseling Head of the Gas Department, ACER 11 th Stakeholders group meeting of GRI.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
1 XVI Florence Forum Jose Sierra Madrid, 4 June 2009 Chair, RIG ERGEG Electricity Regional Initiative Update & Progress.
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Is the regulatory toolset right or is there a need for enhanced regional regulatory oversight? The Regional Initiatives: Europe’s key to energy market.
Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas The role of TSOs in the third package EUROPEAN COMMISSION GIE conference 7 May.
Draft Cross-regional roadmap for intraday Work in progress, for discussion 13 July 2011.
Draft cross-regional roadmap for Long-Term Transmission Rights Still work in progress, for discussion 27 June 2011.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
Gas Regional Initiatives Getting to 2014 Steven Gordon Head of the Gas Department, ACER 8 th GRI Co-ordination Meeting Brussels, 27 th February 2012.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 24 th of April, 2009 Riga The 3 rd Package – implied changes.
Click to edit Master title style 1 5 th GRI Coordination meeting Brussels, 25 th October 2011.
Electricity Regional Initiative Central South European Region Draft Report on Transparency for the CSE-Region Jan Müller Bundesnetzagentur ERI Central.
The Regional Initiatives: Progress and Prospects Conference Brussels, 28 March 2007 Mr Walter Boltz ERGEG Gas Focus Group Chair Status Report of the Gas.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Walter Boltz, Chairman ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Monitoring Report Capacity Allocation and Congestion Management.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
Walter Boltz Chairman, CEER Gas Working Group Enabling Markets Initial assessment of merging market areas & trading regions Gas Target Model.
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28 September 2010 Pilot framework guideline on capacity allocation in natural gas transmission.
Framework Guideline on gas balancing Martin Crouch, Ofgem 20th Madrid Forum September 2011.
TITRE XXI Madrid Forum 22nd and 23rd March 2012 GRI SSE Progress and Outlook Walter Boltz GRI SSE Co-Chair.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Joint Workshop EFET and GRI REM SSE 21 January 2008, Prague, Czech Republic.
3rd IG Meeting – Region South-South East 9th October 2007, Maribor, Slovenia.
Joint ACER-ENTSOG update on implementation of the Balancing NC 26 th Madrid Forum 16 October 2014.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
David Halldearn 6 May Background Programme Board initial discussion last year at Stockholm Since then: Further analysis has been undertaken on.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
Gas Regional Initiative Impact of the 3rd package & creation of RIG Benoît Esnault (CRE), GRI TF co-chair NW GRI – RCC and ministerial meeting Paris, 8.
European Developments Transmission Workgroup 1 st December 2011.
The Regional Initiatives deliver concrete results in the regions but will the regions join up? Ms Asta Sihvonen-Punkka ERGEG’s Electricity Focus Group.
Status Report of the Electricity Regional Initiative Ms Asta Sihvonen-Punkka ERGEG Electricity Focus Group (EFG) Chair The Regional Initiatives: Progress.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren 20 th Madrid Forum, 26 Sept 2011.
1 16 th February 2016 Videoconference 35 th IG Meeting South Gas Regional Initiative.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
Gas Regional Initiative South South-East
29th November 2016 Teleconference
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
New transparency guidelines
ERGEG GRI South South East – , Maribor
Logo(1.00”:3.33”) Font is Rotis Sans Serif however font may have to be embedded as it is important that this does not change on any presentations Size.
37th IG Meeting South Gas Regional Initiative
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
ACER’s view on the future role of the Gas Regional Initiative
37th IG Meeting South Gas Regional Initiative
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
29th April 2014 Teleconference
37th IG Meeting South Gas Regional Initiative
29th November 2016 Teleconference
Gas Regional Initiative South South-East
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
ACER’s view on the future role of the Gas Regional Initiative
Gas Regional Initiative South South-East
Presentation transcript:

SOUTH SOUTH-EAST GAS REGIONAL INITIATIVE WORK PLAN Francesco Cariello, AEEG 20 th Madrid Forum, September 2011

2 Starting point: Critical features of the region. Wide geographical scope;. Low levels of liquidity and competition in national markets;. Different capacity allocation procedures at the IPs;. Different gas-day definitions and nomination rules;. Lack of binding set of rules limiting the effectiveness of different initiatives;. Lack of involvement and participation by some regulators/Member States.

3 Starting point: Main achievements. Introduction of a Strategic Advisory Panel;. Creation of reverse-flow capacities on unidirectional gas pipelines (e.g. TAG);. Coordination of regional investments in new infrastructures (e.g. interconnector HU-SK) enabled the finalisation of Interconnection Point Agreements and OBAs (e.g. new gas exchange at Baumgarten gas hub; OBA to be implemented at IT/AT border);. Monitoring of EASEE Gas Standard implementation in SSE.

4 Prerequisites for the implementation of a fully integrated gas market by It will strongly depend on: » Timely implementation of the 3 rd Package; » TSO action to fulfil legal requirement on regional cooperation; » Timely development and implementation of network codes at EU-level providing for harmonised rules for cross-border network issues and market integration issues.. To rely only on voluntary involvement does not seem a feasible option.

5 Roadmaps for 2014: Process carried out in the SSE region. Lead regulators participated in the ACER Coordination Group of the GRI (May/June 2011);. NRA members asked to actively contribute to the drafting process (May/June 2001);. Stakeholders invited to submit written comments on their expectations and possible contributions to the Work Plan (June 2011).. Some Pilot Projects (PP) have been identified focusing on: Interoperability; Capacity allocation (CA) and bundled products; Enabling market integration; Infrastructure and Investments. RESULTS

6 Interoperability: PP I – EASEE gas rules adoption DELIVERABLE I.1 Standard products ACTIONRESPONSIBLEDEADLINE All the TSOs adopt the EASEE standards with special reference to gas-day definition, unit and OBAs TSOs2012/2013

7 CA and bundled products: PP II - Coordinated short term capacity services DELIVERABLE I.2 Bundled capacity allocation at Austria/Italy IP ACTIONRESPONSIBLEDEADLINE Agreement on harmonised nomination and re-nomination rules SNAM/TAG2011 Harmonised calculation of available firm and interruptible capacities SNAM/TAG2011 Proposal for a procedure for the coordinated allocation of daily capacity SNAM/TAG2012 Definition of a bundled capacity product to be allocated by explicit auctions in order to connect PSV and Baumgarten SNAM/TAG2013

8 CA and bundled products: PP III – GATRAC bundled products DELIVERABLE I.3 Bundled products ACTIONRESPONSIBLEDEADLINE Concept for the realisation of bundled products at all SSE regional IPs Net4Gas together with partner TSOs 2012 Implementation of bundled product offers at further SSE regional IPs Regional TSOs2012+

9 Enabling market integration: PP IV – Cross-Regional Balancing Platform DELIVERABLE I.4 Cross-Regional Balancing Platform ACTIONRESPONSIBLEDEADLINE Implementation of a cross-regional balancing platform CEGH2012

10 Enabling market integration: PP V - Structure of future regional balancing and trading zones in the SSE region DELIVERABLE I.5 Structure of future balancing zones ACTIONRESPONSIBLEDEADLINE Cost benefit analysis of implementing different models for balancing and trading zones (market areas/trading regions/market coupling) NRAs2012 Definition of the model for future regional balancing and trading zones SG2012/2013 Planning and launch of implementation SG2014+

11 Infrastructure: PP VI - Interconnections, available transmission capacity and investments DELIVERABLE I.6 Interconnections and available transmission capacity ACTIONRESPONSIBLEDEADLINE Check investment plans against the background of future market architecture scenarios TSOs coordinated by GRI Lead Regulators ongoing Consultation of the Regional TYNDP TSOs with active stakeholder involvement 2012

12 Thank you for your attention