Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
1 IR NEG heating M. Sullivan MAC Review Dec , 2004 M. Sullivan Machine Advisory Committee Review December 13-15, 2004 IR NEG Heating and Upgrade.
BISMV & H 0 -H - PSB INJECTION VACUUM REQUIREMENTS LIU - PSB meeting 29th October 2012 C. Pasquino, P. Chiggiato, J. Hansen.
Injection Considerations for Scrubbing Run C. BRACCO, M.J. BARNES, W. BARTMANN, B. GODDARD, M. MEDDAHI, J. UYTHOVEN ACKNOWLEDGMENTS: M. DI CASTRO, M.DONZE,
B.Goddard 08/11/04 HHH 2004 Workshop, CERN Beam Dump Brennan GODDARD CERN AB/BT The existing LHC beam dump is described, together with the relevant design.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Injection systems W. Bartmann, M. J.Barnes, C. Bracco, E. Carlier, B. Dehning, L. Drosdal, R. Folch, B. Goddard, V. Kain, A. Lechner, F. Loprete, R. Losito,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Changes to IR6 dump protection elements B.Goddard, W.Weterings, C.Maglioni, R.Versaci, T.Antonakakis, R.Schmidt, J.Borburgh, J.Blanco, plus many other.
Design and operation of existing ZS B.Balhan, J.Borburgh, B.Pinget B.BalhanDesign and operation of existing ZS SPS ZS Electrostatic Septum Upgrade Review.
The LHC injection systems located in points 2 and 8 are comprised of several elements common to the LHC ring and the downstream ends of the TI 2 and TI.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
REQUIREMENTS FOR FCC DILUTION KICKERS AND BEAM DUMP LINE GEOMETRY F. Burkart, W. Bartmann, M. Fraser, B. Goddard, T. Kramer FCC dump meeting 18 th June.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 Beam Dumping System MPP review 12/06/2015 Jan Uythoven for the ABT team.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LIU-ABT systems: SPS B.Balhan, J.Borburgh, H.Day 20 th November 2015.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
LIU-SPS ZS Electrostatic Septum Upgrade Review held on M.J. Barnes & T. Kramer.
Discussion and preliminary conclusions LIU-SPS ZS Electrostatic Septum Upgrade Review M.J. Barnes.
Overview WP14 Developments Hardware  Interferometry on the spare TDIs, planned to be installed Christmas stop 2015/2016. Final acceptance tests ongoing.
News and hot topics Impedance meeting 14/04/2014.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Future Needs and Future Directions Maximizing the LHC Performances J.M. Jimenez …when Nature persists.
POTENTIAL EN-MME DESIGN JOBS IDENTIFIED BUT CURRENTLY NO REQUEST FROM EQUIPMENT OWNERS TO EN-MME EDMS B.RIFFAUD On behalf of EN-MME design team.
Technology Department 1 TCDS material selection and qualification W. Weterings
Issues Raised by the Design of the LHC Beam Dump Entrance Window Ray Veness / CERN With thanks to B.Goddard and A.Presland.
BRANs at HL-LHC Sune Jakobsen (BE-BI-PM) 1st HL-LHC WP13 Project Meeting
LHC beam dump, injection system and other kickers B.Goddard, with input from L.Ducimetière, W.Bartmann, V.Mertens, J.Borburgh, M.Barnes, C.Bracco, V.Senaj,
TPSG4 validation at HighRadMat #6 Cedric Baud, B. Balhan, Jan Borburgh, Brennan Goddard, Wim Weterings.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1)For existing systems, where the ferrite yoke needs to be shielded from the circulating beam, it is not generally possible to include ceramic tubes to.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Technology Department MKP status L. Sermeus, L. Ducimetière TCM 18 November 2014.
ALICE sensitivity to background and injection failures with the smaller aperture A. Di Mauro TREX meeting, 31/07/2014.
TPSG4 Run 3 Konstantinos Karagiannis, on behalf of the TCD Team – January 20 th 2016.
November 16-18, 2004 Belle High Luminosity Workshop 1 M. Sullivan High Luminosity workshop (HL6) November 16-18, 2004 IR Vacuum Summary and Issues.
HL-LHC WP14 2 nd meeting: Intercepting devices and failure cases to be studied Anton Lechner, Jan Uythoven.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LIU-SPS Project baseline, objectives and reviews for 2016 B.Goddard 20/01/16.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
MKI Performance During 2016 and Plans for EYETS
Motivations and Introduction to MultiMat Experiment in HiRadMat
The LHC Beam Dumping System
Proposal TDIS-TZM WP14 TDIS jaw validation testing
Introduction: FCC beam dumping system
Synthesis and status of MKI vibration studies
LHC beam dump 7.56 TeV operation
Options and Recommendations for TL and Dumps
AD consolidation activities in LS2
Benoit Salvant, Kyrre Sjobak, Christine Vollinger, Na Wang
Long Shutdown for the LHC: Vacuum Beam Pipes
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Jan Uythoven For discussion
Electron cloud & vacuum pressure observations: 2011 proton run
WP14 Coordination meetings
Acknowledgments: LIU-PT members and deputies, H. Bartosik
TDI Coating test at HiRadMat Proposal 1605 HiRadMat Scientific Board Meeting 27th June 2016 I. Lamas Garcia, M. Calviani, R. Ferreire, A. Perillo-Marcone.
Impedance working group update
LHC Morning Meeting - G. Arduini
IP8 aperture measurements (07:30-10:30)
Presentation transcript:

The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement Technical Meeting on Vacuum for HI-LUMI LHC, WP12 Vacuum related issues for WP14, Beam Transfer and Kickers Jan Uythoven for the WP 14 team members

HL-LHC Technical Meeting on Vacuum, 05/03/ Outline Description of Injection System and changes for HL – LHC Items which affect vacuum Description of Beam Dumping system and changes for HL-LHC Items which affect vacuum Jan Uythoven, WP 14 Vacuum

HL-LHC Technical Meeting on Vacuum, 05/03/ Jan Uythoven, WP 14 Vacuum WP 14: Beam Transfer & Kickers: Injection MKI injection kickers, LS1: full complement 24 shielding wires, reducing beam impedance. Extrapolate run II data. For HL-LHC additional measures such as active cooling and different ferrites might be needed and are being studied. TDI injection absorber LS1 / run2: Interferometry for redundant gap measurement & interlocking Vacuum feed-through LS2: Replace TDI with multi module beam absorber system, compatible with extremely bright LIU beams Tensile stresses, new collimator materials – in the worst case could limit the number of bunches which can be injected at a time Other absorbers to be verified, some of them might need replacement: TCLIA, TCLIAB, TCDD, TCLIM TCLIA maximum opening affects maximum crossing angle for ALICE ZDC for ion operation IP

HL-LHC Technical Meeting on Vacuum, 05/03/ Injection kickers MKI Main upgrade taking place in LS1 Reduction of beam impedance Includes many mitigations concer- ning vacuum, especially NEG-coating. Removal of solenoids. Concerns: Beam induced heating > run II Vacuum behaviour during scrubbing and operation with 25 ns HL-LHC: Up to 2017 a prototype magnet including water cooling and new yoke ferrites with higher T-Curie is foreseen Vacuum involvement for HL-LHC: New ferrites & doping or coating of ceramic tube to reduce SEY Operational experience will show if changes need to be applied Jan Uythoven, WP 14 Vacuum New NEG coated bypass tubes M.Barnes

HL-LHC Technical Meeting on Vacuum, 05/03/ Absorbers for injection Injection absorber TDI LS1: qualification of position measurement by interferometry, feed through. Spare magnet to be exchanged during run II. LS2: Likely 2 x 5 tanks instead of one large tank Other injection absorbers under study TCLIA/B, TCDD, TCLIM Vacuum involvement: New absorber materials, material choice to be finalised in the coming 12 months Additional equipment, pumping and monitoring Jan Uythoven, WP 14 Vacuum

HL-LHC Technical Meeting on Vacuum, 05/03/ Possible future TDI layout Jan Uythoven, WP 14 Vacuum A.Lechner

HL-LHC Technical Meeting on Vacuum, 05/03/ Jan Uythoven, WP 14 Vacuum WP 14: Beam Transfer & Kickers: Beam Dump LS1: TCDQ upgraded, from 2 to 3 modules; CFC instead of graphite absorbers. Compatible with HL-LHC parameters from 2010 – presently work on bellows VMTAC LS3: Possible upgrade of other absorbers to be confirmed TCDS, TCSG (coll. WP), TCDQM Dump block TDE– study gas handling and pressure increase TDE window Possibly change dilution pattern: dilution magnets MKB Detailed studies after injection system studies which have priority

HL-LHC Technical Meeting on Vacuum, 05/03/ Vacuum for Beam Dumping System N 2 pressure on TDE Pressure on dump  see graph run I Pressure in bottle  see graph run I TDE window Additional MKBs ? TCDS upgrade Jan Uythoven, WP 14 Vacuum

HL-LHC Technical Meeting on Vacuum, 05/03/ TDE – N 2 pressure Jan Uythoven, WP 14 Vacuum August 2012  p  0.06 bar B1 B2

HL-LHC Technical Meeting on Vacuum, 05/03/ TDE in the bottle Jan Uythoven, WP 14 Vacuum Behaviour not understood

HL-LHC Technical Meeting on Vacuum, 05/03/ Vacuum work related to dump No change of TDE itself, but if simulation show limitations changes might be required on: N 2 handling Dilution kickers MKB Possibly extra MKB kickers to be installed, new vacuum sector.. TDE window to be checked for HL-LHC beams Assuming the different dilution failure scenarios Jan Uythoven, WP 14 Vacuum Detail of entrance window, showing 15 mm CC plate, 200  m metallic foil and vacuum flange.

HL-LHC Technical Meeting on Vacuum, 05/03/ Absorbers TCDS – likely to be replaced in LS3 Different absorber material Possibly also replace: TCSG (coll. WP) TCDQM Vacuum involvement: Check on absorber materials, installation, … Jan Uythoven, WP 14 Vacuum Present TCDS B.Goddard, W.Weterings

HL-LHC Technical Meeting on Vacuum, 05/03/ Conclusions on HL-WP14 LS2 concentrate on injection system TDI: New absorber materials and separation of absorbers in several tanks. Coming soon. Possibly replace other injection absorbers MKI, replaced LS1. Ongoing R&D for new ferrites and coated ceramic tube for low SEY. Possibly install prototype. Presently budget foreseen within WP14 for vacuum TDI, TCLIA/B For LS3 accent will be on the beam dumping system Simulations are about to start. TCDS likely to be exchanged. Could involve little related vacuum work Could involve significant vacuum work: TDE window, additional MKBs, N 2 handling system Presently budget foreseen within WP14 for vacuum TCDS Jan Uythoven, WP 14 Vacuum