MODELS FOR NONSTATIONARY TIME SERIES By Eni Sumarminingsih, SSi, MM.

Slides:



Advertisements
Similar presentations
Autocorrelation Functions and ARIMA Modelling
Advertisements

Time Series Analysis Definition of a Time Series process
Regression with Time Series Data
Autoregressive Integrated Moving Average (ARIMA) models
Chapter 9. Time Series From Business Intelligence Book by Vercellis Lei Chen, for COMP
Nonstationary Time Series Data and Cointegration
DSCI 5340: Predictive Modeling and Business Forecasting Spring 2013 – Dr. Nick Evangelopoulos Exam 1 review: Quizzes 1-6.
Economics 20 - Prof. Anderson1 Stationary Stochastic Process A stochastic process is stationary if for every collection of time indices 1 ≤ t 1 < …< t.
Using SAS for Time Series Data
Model Building For ARIMA time series
Part II – TIME SERIES ANALYSIS C5 ARIMA (Box-Jenkins) Models
Nonstationary Time Series Data and Cointegration Prepared by Vera Tabakova, East Carolina University.
Non-stationary data series
Unit Roots & Forecasting
Slide 1 DSCI 5340: Predictive Modeling and Business Forecasting Spring 2013 – Dr. Nick Evangelopoulos Lecture 7: Box-Jenkins Models – Part II (Ch. 9) Material.
Regression with Time-Series Data: Nonstationary Variables
Time Series Building 1. Model Identification
Turning Point At the beginning of the course, we discussed three ways in which mathematics and statistics can be used to facilitate psychological science.
10 Further Time Series OLS Issues Chapter 10 covered OLS properties for finite (small) sample time series data -If our Chapter 10 assumptions fail, we.
Stationary Stochastic Process
Stationary process NONSTATIONARY PROCESSES 1 In the last sequence, the process shown at the top was shown to be stationary. The expected value and variance.
Time series analysis - lecture 2 A general forecasting principle Set up probability models for which we can derive analytical expressions for and estimate.
Prediction and model selection
ARIMA Forecasting Lecture 7 and 8 - March 14-16, 2011
Economics 20 - Prof. Anderson
Modern methods The classical approach: MethodProsCons Time series regression Easy to implement Fairly easy to interpret Covariates may be added (normalization)
Non-Seasonal Box-Jenkins Models
BOX JENKINS METHODOLOGY
Box Jenkins or Arima Forecasting. H:\My Documents\classes\eco346\Lectures\chap ter 7\Autoregressive Models.docH:\My Documents\classes\eco346\Lectures\chap.
ARMA models Gloria González-Rivera University of California, Riverside
Slide 1 DSCI 5340: Predictive Modeling and Business Forecasting Spring 2013 – Dr. Nick Evangelopoulos Lecture 8: Estimation & Diagnostic Checking in Box-Jenkins.
Linear Stationary Processes. ARMA models. This lecture introduces the basic linear models for stationary processes. Considering only stationary processes.
TIME SERIES ANALYSIS Time Domain Models: Red Noise; AR and ARMA models LECTURE 7 Supplementary Readings: Wilks, chapters 8.
Autoregressive Integrated Moving Average (ARIMA) Popularly known as the Box-Jenkins methodology.
Models for Non-Stationary Time Series The ARIMA(p,d,q) time series.
It’s About Time Mark Otto U. S. Fish and Wildlife Service.
FORECASTING. Minimum Mean Square Error Forecasting.
Autocorrelation, Box Jenkins or ARIMA Forecasting.
Introduction to Time Series Analysis
K. Ensor, STAT Spring 2004 Memory characterization of a process How would the ACF behave for a process with no memory? What is a short memory series?
MULTIVARIATE TIME SERIES & FORECASTING 1. 2 : autocovariance function of the individual time series.
Auto Regressive, Integrated, Moving Average Box-Jenkins models A stationary times series can be modelled on basis of the serial correlations in it. A non-stationary.
Forecasting (prediction) limits Example Linear deterministic trend estimated by least-squares Note! The average of the numbers 1, 2, …, t is.
Review and Summary Box-Jenkins models Stationary Time series AR(p), MA(q), ARMA(p,q)
The Box-Jenkins (ARIMA) Methodology
Seasonal ARIMA FPP Chapter 8.
TESTING FOR NONSTATIONARITY 1 This sequence will describe two methods for detecting nonstationarity, a graphical method involving correlograms and a more.
NONSTATIONARY PROCESSES 1 In the last sequence, the process shown at the top was shown to be stationary. The expected value and variance of X t were shown.
TESTING FOR NONSTATIONARITY 1 This sequence will describe two methods for detecting nonstationarity, a graphical method involving correlograms and a more.
Introduction to stochastic processes
Time Series Analysis PART II. Econometric Forecasting Forecasting is an important part of econometric analysis, for some people probably the most important.
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
EC 827 Module 2 Forecasting a Single Variable from its own History.
Nonstationary Time Series Data and Cointegration
Ch8 Time Series Modeling
Chapter 6: Autoregressive Integrated Moving Average (ARIMA) Models
Further Issues Using OLS with Time Series Data
Model Building For ARIMA time series
Further Issues in Using OLS with Time Series Data
Chapter 5 Nonstationary Time series Models
Forecasting with non-stationary data series
Box-Jenkins models Stationary Time series AR(p), MA(q), ARMA(p,q)
Unit Root & Augmented Dickey-Fuller (ADF) Test
The Spectral Representation of Stationary Time Series
By Eni Sumarminingsih, Ssi, MM
Further Issues Using OLS with Time Series Data
Eni Sumarminingsih, SSi, MM
CH2 Time series.
BOX JENKINS (ARIMA) METHODOLOGY
Presentation transcript:

MODELS FOR NONSTATIONARY TIME SERIES By Eni Sumarminingsih, SSi, MM

Stationarity Through Differencing Consider again the AR(1) model Consider in particular the equation Iterating into the past as we have done before yields We see that the influence of distant past values of Y t and e t does not die out—indeed, the weights applied to Y 0 and e 1 grow exponentially large

The explosive behavior of such a model is also reflected in the model’s variance and covariance functions. These are easily found to be The same general exponential growth or explosive behavior will occur for any φ such that |φ| > 1

A more reasonable type of nonstationarity obtains when φ = 1. If φ = 1, the AR(1) model equation is This is the relationship satisfied by the random walk process. Alternatively, we can rewrite this as where ∇ Y t = Y t – Y t – 1 is the first difference of Y t

ARIMA Models A time series {Y t } is said to follow an integrated autoregressive moving average model if the dth difference W t = ∇ d Y t is a stationary ARMA process If {W t } follows an ARMA(p,q) model, we say that {Y t } is an ARIMA(p,d,q) process Fortunately, for practical purposes, we can usually take d = 1 or at most 2.

Consider then an ARIMA(p,1,q) process. With W t = Y t − Y t − 1, we have or, in terms of the observed series,

The IMA(1,1) Model In difference equation form, the model is or After a little rearrangement, we can write

From Equation (5.2.6), we can easily derive variances and correlations. We have and

The IMA(2,2) Model In difference equation form, we have or

The ARI(1,1) Model or

Constant Terms in ARIMA Models For an ARIMA(p,d,q) model, ∇ d Y t = W t is a stationary ARMA(p,q) process. Our standard assumption is that stationary models have a zero mean A nonzero constant mean, μ, in a stationary ARMA model {Wt} can be accommodated in either of two ways. We can assume that Alternatively, we can introduce a constant term θ0 into the model as follows: Taking expected values on both sides of the latter expression, we find that

so that or, conversely, that

What will be the effect of a nonzero mean for W t on the undifferenced series Y t ? Consider the IMA(1,1) case with a constant term. We have or by iterating into the past, we find that Comparing this with Equation (5.2.6), we see that we have an added linear deterministic time trend (t + m + 1)θ 0 with slope θ 0.

An equivalent representation of the process would then be Where Y’ t is an IMA(1,1) series with E ( ∇ Y t ') = 0 and E( ∇ Y t ) = β 1. For a general ARIMA(p,d,q) model where E ( ∇ d Y t ) ≠ 0, it can be argued that Y t = Y t ' + μ t, where μ t is a deterministic polynomial of degree d and Y t ' is ARIMA(p,d,q) with E Y t = 0. With d = 2 and θ0 ≠ 0, a quadratic trend would be implied.

Power Transformations A flexible family of transformations, the power transformations, was introduced by Box and Cox (1964). For a given value of the parameter λ, the transformation is defined by The power transformation applies only to positive data values If some of the values are negative or zero, a positive constant may be added to all of the values to make them all positive before doing the power transformation We can consider λ as an additional parameter in the model to be estimated from the observed data Evaluation of a range of transformations based on a grid of λ values, say ±1, ±1/2, ±1/3, ±1/4, and 0, will usually suffice