PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 1 Cost Estimating for the AD&I Studies X Differential Estimates What we need from you! Peter.

Slides:



Advertisements
Similar presentations
Nov. 17, 2008 ILC08 Global Design Effort 1 Americas KlyCluster Cost Analysis Overview Tom Lackowski RF & Sum reported by Peter H. Garbincius.
Advertisements

Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
Positron Source Update Jim Clarke Deepa Angal-Kalinin James Jones Norbert Collomb At Daresbury Laboratory and Cockroft Institute 21/07/2009.
20/03/2011 Global Design Effort 1 ALCPG11 – Eugene Positron Source N. Collomb J. Clarke, D. Angal-Kalinin,
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Global Design Effort - CFS for Asian Single Tunnel Configuration Design Progress Masanobu Miyahara KEK.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
April 2009 AAP Review Global Design Effort 1 “Minimum Machine” is code for Design and Integration Studies in 2009 toward a Re-Baseline in 2010 which will.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
Cost Impacts of two e- ML cycles at sqrt(s) < 250 GeV purpose: not to generate a new ILC estimate, but to facilitate SB2009 decisions Peter H. Garbincius,
Peter H. Garbincius November 20, 2008 Cost Management LCWS08 - UIC 1 ILC Cost Management J. Carwardine, T. Himel, F. Lehner,T. Shidara, L. Hagge, P. Garbincius,
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
Discussion for Keep Alive Source /Auxiliary Positron Source KURIKI Masao Hiroshima U. /KEK 10/25/2011 ILC Technical Baseline Review, 2011, DESY 1.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
Thickness of the Kamaboko Tunnel Shield Wall under Different Assumptions Ewan Paterson Technical Board June 23,
27 Nov 07 VM Workshop Global Design Effort 1 ILC – Superconducting Linear Collider Marc Ross, Project Manager GDE Fermilab.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
N.Solyak, RTMLALCPG 2009,Albuquerque, Oct.2 1 ILC RTML Upgrade in SB2009 Nikolay Solyak Fermilab.
Global Design Effort - CFS Accelerator Advisory Panel Review - Oxford UK 1 ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES AND SITING.
SINGLE-STAGE BUNCH COMPRESSOR FOR ILC-SB2009 Nikolay Solyak Fermilab GDE Baseline Assessment Workshop (BAW-2) SLAC, Jan , 2011 N.Solyak, Single-stage.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
Nick Walker for the Project Management ILC AD&I: Introduction and Overview.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
John Osborne : GS-SEM Civil Engineering 18 May 2009 CES 9 June News from ILC Japan CFS review 1-3 June 2010 :
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
10/02/2011 Global Design Effort 1 Positron Source meeting J. Clarke, D. Angal-Kalinin, N. Collomb.
Thickness of the Kamaboko Tunnel Shield Wall under Different Assumptions Ewan Paterson ADI Meeting July 2, ADI Meeting Ewan Paterson 7/2/15.
DR Layout Description ILC DR Technical Baseline Review Frascati, July 7, 2011 Mark Palmer Cornell University.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
N. Walker, K. Yokoya LCWS ’11 Granada September TeV Upgrade Scenario: Straw man parameters.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
For Layout of ILC , revised K.Kubo Based on following choices. Positron source: Prepare both conventional and undulator based. Place the.
LNF Frascati, July 8, 2011 DR Technical Baseline Rev. Global Design Effort 1 DR Technical Baseline Review INFN LNF · Frascati, Italy July 7 and 8, 2011.
H. MAINAUD DURAND CFS TDR design status Survey & alignment MDI meeting, 16/03/2012.
28/03/20101 ILC – Central Integration SB 2009 Layout Interpretation of available data into CAD 3D virtual model to serve as true scale graphical representation.
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
BDS/MDI Deepa Angal-Kalinin Andrei Seryi AD&I Meeting, DESY, May 29, 2009.
Cost Impacts of Reduced # Bunches per Train purpose: not to generate a new ILC estimate, but to facilitate SB2009 decisions Peter H. Garbincius, Fermilab.
TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
Global Design Effort RTML KOM Close-out Ross, Walker.
Minimum Machine Update Nick Walker Ewan Paterson AS TAG leaders meeting
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
Baseline Technical Review – Central Region Accelerator Systems
Americas KlyCluster Cost Analysis Overview
Integration Ideas for the Central Region Some old some new
Summary of WG2 :CFS for staging
Availsim runs and questions
CLIC Civil Engineering Update
ILC CFS AD&I Daresbury Lab Summary
AD & I : BDS Lattice Design Changes
Nick Walker for the Project Management
ILC Cryogenics -- Technical Design Report Planning
Central Region Working Group
Barry Barish Paris ICHEP 24-July-10
ILC - Global Design Effort
Presentation transcript:

PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 1 Cost Estimating for the AD&I Studies X Differential Estimates What we need from you! Peter H. Garbincius Fermilab DESY – May 29, 2009 proliferation of acronyms! updated after presentation & discussion

Introduction & Outline Now we need cost differentials: How much could we save if we made this proposed change? Later in the Technical Design Phase – 2: we will need a complete new cost estimate (bottom-up) For Reference Design Report, we had estimate = a + b + c new estimate => a’ + b + d where d replaces c, but may have an updated estimate for a need to compare a+b+c => a+b+d or a’+b+c => a’+b+d sometimes easy comparing b => d, sometimes b/d affects a/a’ non-diagonal, coupled effects We need estimate comparison for same year => 2007 RDR What questions need to be asked for each AD&I study? Prior examples: Klystron Cluster & 230 GeV e-e+ studies PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 2

What information we need for each study? Descriptive text – what changes Configuration – number of new components, # and length of tunnel(s), sketches, 3D CAD, etc. Required utilities: power, cooling, cryogens Cost estimates for new components: e.g. overmoded waveguide and couplers for Klystron Cluster study, klystrons and modulators for DRFS Do old unit cost estimates change? Learn Curve? Use new ICET cost estimate template (enable macros) Head to head comparison: old vs. new (CFS) PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 3

CFS for Klystron Cluster PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 4

PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 5

PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 6

PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 7

PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 8

CFS criteria for KlyCluster study PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 9

KlyCluster est did not use Chilled Water! PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 10

PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 11

PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 12

PHG for Klystron Cluster PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort GeV e+e- study was a 36-step process

PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 14

Questions & Comments on Nick’s List e- Source: easy! where? service tunnel/caverns? e+ Source: keep undulator source, not conv e+ what is QWT?, what about Lithium lens? What is aux. e- linac for e+ production? Warm or cold? Where is it located wrt ML/BDS, undulator, RTML? DR: RDR had 6.7 km OSC6 - Susanna (today) has a 3.3 km DCO racetrack with straights = 2*1 km and R arcs = 200 m => close to TBM turning limit need new estimate using new component #s RTML: remember impact of 210 m shorter single BC on long transfer lines – Nikolay has new # of similar comps – same (or scaled) RDR unit costs PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 15

Nick’s List - continued Main Linac: need better estimates for 300 MW RF pipe & couplers, DRFS klystrons & modulators, space considerations for 1-tunnel and shafts BDS: what configurations will we estimate? 500 GeV easily upgradable to 1 TeV Checks of design & simulation for traveling focus. Low-P: specify all configurations: half-number of klystrons, full number of klystrons, upgradability: during operations? 1 or 2 tunnels, with or without Klystron Cluster (easy on surface) Is immediate upgrade considered a cost saving? PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 16

Peter’s simple ?s on central region impacts to RDR geometry –Length of new BDS? (~ same as old = ± 2226 m), where e- source, e+ source, RTML lines join? Ewan: anywhere –Longer RTML lines, different e+ 5 GeV injection line to DR –Flexibility in locating e- Source => facilitate commissioning –Any ML needed d.s. of undulator? ε-growth acceptable –Transverse offset of DR straights from ML/BDS line? –Will have enough n*7 0 dipole bends for Spin Rotation –Crowding: ML 250 GeV e- bypass, aux. e- drive for e+, γ -beam from undulator, e- RTML, target station with shielding (how much?), and don’t forget serviceability –Do any of these systems require service tunnels or special service caverns? PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 17

Peter’s Final Comments/Questions We’ve started to see updates to the risk register! How do we weigh a cost estimate impact versus machine availability? Yes, we all agree that we must work together to produce this new Strawman Baseline! Is there enough personnel resources to do it? Ewan asked for answers on Central Region Integration Case 3 by this afternoon ~ like now! Do we know what we need to do in order to have differential cost impacts for Albuquerque? ICET cost estimate template (enable macros): PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 18

discussion during & after presentation: Barry: how do we deal with currency exchange rate changes? Past and Future? PPP index? How complicated do we need to be? Nick: preparing for Albuquerque meeting: need deadline for submission of pre-information likely prioritization of studies (limited resources) Peter: need to better specify information needed from TAGLs and estimators Nick: show estimate info in ICET template require only simple TAGL input to be logged by ICET experts PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 19