Resources, Timeline & Contingency UCN CDR (Sept/2010)

Slides:



Advertisements
Similar presentations
Report from MICE project teams Proposed MICE organogram: revised Revised request for resources for financial year 2003/04 Review of iMICE schedules – status.
Advertisements

UCN Beamline Shielding, Target & Remote-Handling UCN CDR (Sept/2010) L.Lee.
Muon Campus Projects Mary Convery 1. Background on Muon Campus plan Earlier Plan had 5 Common Projects:  MC1 Building (GPP)  MC Beamline Enclosure (GPP)
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
Costing Meeting Ajit Kurup 13 th June Page 2 Costing Meeting 13 th June 2011 Ajit Kurup Summary of CERN costing workshop. Proposed Level 3 breakdown.
LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
RF Cavity / Coupling Coil Module
Preparation for May-2013 Review of UCN Beamline March 27, Date: May 2-3, 2013 Review Committee finalized Scope – Overall concept, focusing on 2014.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
August 2 and 3, 2010 Project Cost, Schedule, Risk and Contingency Jay Elias.
ACTIVITY J A J O J A Schedule( ) UCN Timeline & Major Milestones Remove.
U.S. MICE Schedule, Cost, & Risks Peter H. Garbincius Mark Palmer, Alan Bross, Rich Krull Fermilab Presented at RAL – November 13, 2013.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
2014 Shutdown Schedule & UCN FY-2013 Resources 1 February 20, 2013.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
Vault-BL1A Shielding Plug Sept 26, 2012 L.Lee. N UCN Installation-1: 2014 Shutdown Shielding “Plug” will need to be reconfigured.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
BL1U at TRIUMF UCN Beamline BL1U Layout (Nov 2011) C.A.Davis.
05 m 10 m 12 mr 145 mr 18.5  deflection: 40  OVERVIEW: UCN Facility in Meson Hall.
UCN 2014-Shutdown Schedule UCN Monthly Meeting (July 24, 2013) L.Lee, C.Marshall.
Hydrogen Delivery System Schedule MICE Schedule Review 23 rd -25 th May 2011 M Hills STFC.
UCN Facility at TRIUMF L.Lee October 3, 2012 PLACE UCN LOGO & ACRONYM HERE.
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.
1 Message from Management Resources for 2014 oversubscribed Need to descope Minimal 2014 work Reschedule (Delay) some work to 2015 Groups:  Define Critical.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
Takeyasu Ito University of Tennessee/Oak Ridge National Laboratory EDM Cost and Schedule Review February, 2005 Beam Splitter / State Selector, Polarizing.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
Spreaders & Recombiners Beam Transport Michael Bevins May 30, GeV Upgrade - Beam Transport Spreader/Recombiner Dipoles and Layout, & Installation.
Hall A Installation Review John J. LeRose 2/25/2009.
October, 2009 Cost of SRF Components Gary McIntyre October, 2009 Internal Review.
Status of Contributions, Draft Budget Request for 2005 and Outlook for the Longer Term Future Martyn Davenport 8 TH October 2004 CAST FRC-D
TE-CRG Activities D. Delikaris, TE-CRG.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
O. Kester, NuSTAR annual meeting, 27/02/2013
Contents: -GSI organization structures -Tasks of GSI (accelerator) -Status of evaluations / technical developments -Overview -Note : (only) accelerator.
Padova, 10 Febbraio 2014 ALICE ITS Upgrade Visita Referee - Sezione di Padova.
HTS-2 – FY17 Budget Request Joe Ozelis, Sr. Eng. Physicist PIP-II Budget Retreat 26 April, 2016.
WBS – 30 Straight Section Reconfiguration g-2 Accelerator – 30 Straight Section Reconfiguration D. Still Fermilab Muon g-2 IDR, June 5-7.
Instrument Construction Phase 1 and beyond Rob Connatser Chief Instrument Project Engineer September, 2014.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
Common Systems – Holger Kollmus Holger Kollmus FAIR - Machine Advisory Committee Meeting Common Systems and Controls.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
WP High Beta Cavities Delivery
Resource Loaded Schedule and Budget Profile
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
Spectrometer Solenoid Update
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Preparations for a Lehman Review
General Assembly Meeting
Extraction Michael Bevins May 17, 2007
SNS-PPU upgrades the existing accelerator structure
East Hall under construction
Presentation transcript:

Resources, Timeline & Contingency UCN CDR (Sept/2010)

- Work Breakdown Structure - Timeline/Schedule - Human Resources & Manpower Profile - Capital Resources & Contingencies - Liquefier Recap Note: Canadian Funding Agencies (e.g. NSERC) strictly forbid the inclusion of contingency funding in grant requests. Explicit allocation of funds for contingency spending would not normally appear in budget tables. Outline

Project Phase WBS 2 Beamline WBS 2.1 Spallation Target WBS 2.2 Shielding Structure WBS 2.3 Helium Liquifier WBS 2.4 Installation WBS 2.6 Kicker Septum Dipole (1UB2) Quadrupoles Steering Magnets Beamline Layout Vacuum System Diagnostics Control System Services Shine Blockers Beamline H/W Target Monitors/Interlocks Remote Handling Overall Assembly Shielding Safety D 2 O He Liquifier Plant TRIUMF Parts Compressor Services Controls UCN Facility Project Work Breakdown Structure Level 3: Work Packages UCN Source WBS 2.5 Isopure Cryostat Heavy Ice Cryostat Neutron guides UCN bottle Moderator Level 2: Subsystems Pre-Project Phase WBS 1 UCN Facility

UCN Facility Project Work Breakdown Structure (Level 3: Work Packages) Dipole (1UB2) WBS Specs, Design, Tender & Order WBS UB2 Magnet Fabrication WBS Vacuum Box WBS Power Supplies WBS Specify Review & finalize specs Prepare bids for vendors Bid time Place order Preliminary design Review Finish design Acceptance tests Ship & receive at TRIUMF Unpack Prepare for field mapping Field map 1UB2 Overall assembly Design Check dwgs Fabricate Assemble and prep. to install Specify Review Prepare tender docs Bid time Place order Fabricate (vendor) Acceptance tests (vendor) Ship & receive p/s at TRIUMF Checkout, hookup services, & prep for magnet tests Level 4: Deliverables Level 5: Tasks (on Resource-Loaded Schedule)

Resource-Loaded Schedule and WBS (Vijay Verma, Mark Keyzer) See Printouts for details

SHIELDING – Base Layer SHIELDING – Outer Layers HELIUM LIQUIFIER: UCN APPARATUS: Spallation Target Vacuum, Monitoring & Safety UCN Source (Install Japanese Parts) TRIUMF Parts Services Compressor Building Mods. Controls S + O + P O + P S+D+RF+I P + De + I S + D + R F + A S+R DO + FA+T IT S + D + R F + A I+T S + D + R O + P I I I A  Assemble B  Bids C  Concepts Cm  Commission D  Detail Design De  Development F  Fabricate I  Install O  Order P  Procure Pd  Production R  Review S  Specs T  Test UI  UnInstall Remove M11 & Replace Septum Remove 1BVB2 BL1A Temporary Shielding S + D + R I Remove M13, PIENU UI S+D+R+F+A UI+I UI BEAMLINE: Kicker Septum Dipole Quadrupoles. Power Supplies Remaining Beamline (Vac,Serv,Cntrl,Diag,Safety,B/L) ASSY/INSTALL & Commission S + D + R P S S A T F A I I I T P T P T A P + T O D F + A IT + Cm B/L REMOVAL & CLEAN-UP: Steering Magnets (8”) S + D F + A + T He Liquifier Plant S + R + O P + A + T S+D+R I Construction Design ARIEL B Layout of TRIUMF UCN Activity (Beam in 2015) Overview of Schedule

SHIELDING – Base Layer SHIELDING – Outer Layers HELIUM LIQUIFIER: UCN APPARATUS: Spallation Target Vacuum, Monitoring & Safety UCN Source (Install Japanese Parts) TRIUMF Parts Services Compressor Building Mods. Controls S + O + P O + P S+D+RF+I P + De + I S + D + R F + A S+R DO + FA+T IT S + D + R F + A I+T S + D + R O + P I I I A  Assemble B  Bids C  Concepts Cm  Commission D  Detail Design De  Development F  Fabricate I  Install O  Order P  Procure Pd  Production R  Review S  Specs T  Test UI  UnInstall Remove M11 & Replace Septum Remove 1BVB2 BL1A Temporary Shielding S + D + R I Remove M13, PIENU UI S+D+R+F+A UI+I UI BEAMLINE: Kicker Septum Dipole Quadrupoles. Power Supplies Remaining Beamline (Vac,Serv,Cntrl,Diag,Safety,B/L) ASSY/INSTALL & Commission S + D + R P S S A T F A I I I T P T P T A P + T O D F + A IT + Cm B/L REMOVAL & CLEAN-UP: Steering Magnets (8”) S + D F + A + T He Liquifier Plant S + R + O P + A + T S+D+R I Construction Design ARIEL B Layout of TRIUMF UCN Activity (Beam in 2015) Overview of Schedule Ariel construction  Aug/2011-Feb/2013 UCN Design during ARIEL Construction UCN (main) Construction after ARIEL Completion

UCN Manpower Requirements from RLS Breakdown by Group & Resource, in Person-Months

Load on Design Office Load on Machine Shop (Peaks in 2013) UCN “Rolled Up” Manpower Requirements Load on Mech.Techs (Peaks in 2014) Load on TRIUMF-based manpower peaks in 2013

UCN Manpower Profile Year FTE Outside Contractors (CFI) TRIUMF/CFI Manpower

UCN Manpower Funding Scenarios FTE Year Year (Scenario 1)(Scenario 2) Outside Contractors (CFI) CFI-funded ManpowerTRIUMF Manpower Scenario 1: TRIUMF-CFI Matched Profile Funding Scenario 2: CFI Front-Loaded Funding

Positive Impacts of UCN at TRIUMF 17 FTE-years injected from CFI into TRIUMF - Mid 2011 – junior engineer  Project engineer - Late 2011 – designer - Mid 2012 – mechanical technician - Junior people hired to impact TRIUMF succession management Engagement of technical staff at TRIUMF (e.g. detector facilities) through new project Hardware opportunities for interested faculty and for training HQP. Future long-term physics program opportunities.

Capital Cost Estimates

Capital Resources Breakdown by item and funding sources (cash or in-kind) Capital Contributions for Liquefier

Contingency Summary of Human Resources Contingency Summary of Capital Resources Contingency

Helium Liquefier (Recap) UCN group recently engaged outside cryogenic consultant to examine options  A solution that satisfies both the needs of UCN and CMMS was identified. Costs may be reduced by importing an existing large KEK compressor (which KEK has allocated funds to refurbish and ship) and large buffer tanks. A new cold box will be required. Cost estimate for a new liquefier is $1.5M to $2M (includes cost for KEK to refurbish and ship compressor, and large buffer tanks). Since  SR liquid helium costs alone are $400k per year, new liquefier would pay for itself in one 5-year cycle (UCN funds are allocated to cover the first few years of operational costs). There is an additional cost of $700k for transfer lines and installation

The End

Risks & Mitigation: UCN Facility Kicker  Risetime problem (upgrade switches) Rep rate problem (extensive offline testing, upgrade components) Spallation Target  Cooling Leaks (consult RH techs) Mechanical Extraction UCN Source  Lower UCN rate (extensive testing in Japan) Cooldown problems (extensive testing in Japan) Liquefier  Budget & Schedule for new parts ASME recertification for old parts Space issues: Compressor size vs Annex space Manpower Issues  Priority Conflicts (UCN HR Contingency, Acsion, Staggering) Availability of Appropriate Skills (CFI manpower budget) Budget Issues  CFI, TRIUMF, Japan: Total and Cashflow Operational Phase Unforseen Cost Overruns (Flexibility of funding) Inflation & Currency Exchange