Bunch Separation with RF Deflectors D. Rubin,R.Helms Cornell University.

Slides:



Advertisements
Similar presentations
1 ILC Bunch compressor Damping ring ILC Summer School August Eun-San Kim KNU.
Advertisements

S. N. “ Cavities for Super B-Factory” 1 of 38 Sasha Novokhatski SLAC, Stanford University Accelerator Session April 20, 2005 Low R/Q Cavities for Super.
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
ALPHA Storage Ring Indiana University Xiaoying Pang.
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
Plans for injection/extraction R&D S. Guiducci INFN-LNF KEK - ILCDR07, Dec 207.
KEKB Crab Development K. Hosoyama (KEK) Crab Cavity for HER Crab Cavity for LER Crab Cavity for KEKB History of Crab Cavity R&D Characteristics of Crab.
Proposals for conceptual design of the CLIC DR RF system at 2 GHz 20/10/2010 A.Grudiev.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
1 C-Band Linac Development Satoshi Ohsawa 2004.Feb.19LCPAC.
Status of crab crossing studies Presented by NAKANISHI Kota (KEK) 2008/1/25.
X-Band Deflectors Development at SLAC
November 14, 2004First ILC Workshop1 CESR-c Wiggler Dynamics D.Rubin -Objectives -Specifications -Modeling and simulation -Machine measurements/ analysis.
1 Simulations of fast-ion instability in ILC damping ring 12 April ECLOUD 07 workshop Eun-San Kim (KNU) Kazuhito Ohmi (KEK)
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
ILC Program discussion M. Ross Damping Ring Injection / Extraction Kicker Magnet 1)The TDR Kicker: 1)0.6 mrad (.01Tm), 5GeV, 50 m β, 7e-4 stability,
Preliminary results on simulation of fast-ion instability at 3 km LBNL damping ring 21 April 2005 Pohang Accelerator Laboratory Eun-San Kim.
RF DEFLECTORS AT CTF3 BNL/US-LARP/CARE-HHH MINI-WORKSHOP ON CRAB CAVITIES FOR THE LHC Brookhaven National Laboratory, Upton NY Feb 25-26, 2008 Fabio Marcellini.
Beam Driven Plasma-Wakefield Linear Collider: PWFA-LC J.P Delahaye / SLAC On behalf of J.P. E. Adli, S.J. Gessner, M.J. Hogan, T.O. Raubenheimer (SLAC),
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
LER Workshop, October 11, 2006LER & Transfer Line Lattice Design - J.A. Johnstone1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Introduction The.
RF 1/33 ALBA RF system why, how and other questions Francis Perez.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
P I T Z Photo Injector Test Facility Zeuthen Design consideration of the RF deflector to optimize the photo injector at PITZ S.Korepanov.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
TESLA DAMPING RING RF DEFLECTORS DESIGN F.Marcellini & D. Alesini.
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
C/S band RF deflector for post interaction longitudinal phase space optimization (D. Alesini)
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
Progress Report on the Ultra-fast Harmonic Kicker Cavity Design and Beam Dynamic Simulation Yulu Huang 1,2 H. Wang 1, R. A. Rimmer 1, S. Wang 1 1.Thomas.
ALCW at SLAC, January 7, 2004J. Rogers, Novel Schemes for Damping Rings1 Novel Schemes for Damping Rings J. Rogers Cornell University Improving dynamic.
Coupled bunch Instabilities at ILC Damping Rings L. Wang SLAC ILC Damping Rings R&D Workshop - ILCDR06 September 26-28, 2006 Cornell University Refer to.
Issues related to crossing angles Frank Zimmermann.
Status of the CLIC main beam injectors
TESLA Damping Ring: Injection/Extraction Schemes with RF Deflectors
CLIC Damping ring beam transfer systems
LHC Crab Cavity Conceptual Design at SLAC
Design Fabrication and Processing Group H. Padamsee
Developments on Proposed
Update of CLIC accelerating structure design
LNF Laboratory Report S. Guiducci.
Junji Urakawa (KEK) for ATF International Collaboration
Bunch Separation with RF Deflectors
Damping Ring Kicker Tests at AØ
SuperB project. Injection scheme design status
The SPS 800 MHz RF system E. Shaposhnikova for BE/RF
Overview Multi Bunch Beam Dynamics at XFEL
ATF Fast Kicker R&D at LBNL ILCDR06, Cornell University
XII SuperB Project Workshop LAPP, Annecy, France, March 16-19, 2010
CEPC Main Ring Cavity Design with HOM Couplers
Status of CTC activities for the Damping rings
Super-B Factory in a “4400m” Tunnel
Proposal for a CESR Damping Ring Test Facility
Kicker and RF systems for Damping Rings
Kicker specifications for Damping Rings
Injection design of CEPC
Kicker and RF systems for Damping Rings
JLEIC ion fullsize booster (2256m) space charge limit (Δν=0
Parameters Changed in New MEIC Design
Technical challenges for forming the double intensity section of JLEIC ion beam Jiquan Guo.
RF Parameters for New 2.2 km MEIC Design
Fast kicker beam dynamics simulations
Status and plans for crab crossing studies at JLEIC
Update on Crab Cavity Simulations for JLEIC
Evaluation of 1GHz vs 2GHz RF frequency in the damping rings
Presentation transcript:

Bunch Separation with RF Deflectors D. Rubin,R.Helms Cornell University

Transverse RF injection extraction kicker

David Rubin Cornell University ILC Damping Rings Workshop 26-September-2006 Separation with transverse RF Timing t = nT RF (t = bunch spacing) N = T rev /T RF t = (m+1/2)T TR (opposite kick for consecutive bunches) T rev /T TR = (M+1/2) (opposite kick for the same bunch on consecutive turns) T TR = [n/(m+1/2)] T RF n=2, m=1 => T TR =(4/3)T RF f RF =650MHz f TR =487.5MHz N=14402 M=10801

David Rubin Cornell University ILC Damping Rings Workshop 26-September-2006

David Rubin Cornell University ILC Damping Rings Workshop 26-September-2006 More Timing Train spacing corresponds to bunch spacing in linac (337ns) - Extract damped bunches from the tail of each train (For extraction there are 2t ~6ns for kicker rise time and > 49ns fall time - Inject undamped bunch at head of train (For injected bunch there are > 49ns for kicker rise time and 2t fall time. Bunches near the head of the train are more tolerant of kicker tail)

David Rubin Cornell University ILC Damping Rings Workshop 26-September-2006 Transverse Kick  A = 9e-6 m-rad  =>Beam size (=25m) = 15mm In order to clear septum > 15mm   Suppose each cavity kick =  0.3mrad Then 3 cavities =>  0.9mrad =>  = 22.5mm

David Rubin Cornell University ILC Damping Rings Workshop 26-September-2006 Deflecting RF KEK B crab cavity (Akai 24-dec-2003) Achieve >21MV/m peak surface field in full scale test => 1.4MV transverse/cell Suitable for 2A LER beam (23kW HOM power) For installation 2006 (1.4MV -> 1.5MV for super B-factory) At 5GeV beam energy  = 0.3mrad/cell

David Rubin Cornell University ILC Damping Rings Workshop 26-September-2006 KEK-B Crab Cavity K.Oide (19 Jan 2006 ) 500MHz

David Rubin Cornell University ILC Damping Rings Workshop 26-September-2006 K.Oide (19 Jan 2006)

David Rubin Cornell University ILC Damping Rings Workshop 26-September-2006 Q vs E

David Rubin Cornell University ILC Damping Rings Workshop 26-September-2006 K.Oide (19 Jan 2006) - beam test 2006

David Rubin Cornell University ILC Damping Rings Workshop 26-September-2006 Summary  4-6 Superconducting RF kickers double bunch spacing  SC Cavity beam tests soon?  Bypass lines must have identical path lengths  RF stability for closing the bump TR >>  L -> uniform kick over length of bunch � Full wave bypass for symmetry?

1)If the filling time (  F ) of the deflectors is less than  T DR it is possible to inject or extract the bunches without any gap in the DR filling pattern. 2)  should be   * depending on the ring optics and septum position. Considering a single RF frequency    /  MAX =1-cos(2  /F) The length of the DR is properly chosen so that, after one turn, the bunches are 2pi /F (F is the compression factor) out of phase with respect to the RF voltage of the 2nd RF deflector. The residual transverse kick is completely compensated by the 1st RF deflector because the betatron phase advance between the two devices is 180 °. In this way the bunches are progressively recombined. DR INJECTION/EXTRACTION SCHEMES F. Marcellini,D.Alesini,S.Guiducci,P.Raimondi By using the combination of 2 or more frequencies it is possible to increase the ratio  /  MAX.This means that the needed maximum deflection can be reduced or that the compression factor can be increased. Even if TW RF deflectors are fast devices, a gap in the DR filling pattern has to be introduced to take into account their finite filling time. Minimizing this filling time is important to have the shorter gap possible.

EXAMPLE OF A TW RF DEFLECTOR DESIGN F. Marcellini, (see TESLA Report ) /2/3 a [mm]41.8 b [mm] D [mm] mode /2 (f≈1.3GHz) HFSSMAFIA Series impedance Quality factor Shunt impedance Attenuation Group velocity0.045 * c Single cell dimensions for 2 possible operating mode considered Deflector characterization by simulations ns MAX   g F v L mradGeV   can be obtained if a 1.5 m long deflector is fed with 9 MW from the RF source The filling time results: