Proton Source Improvement Workshop Cogging W. Pellico Dec 6&7 2010.

Slides:



Advertisements
Similar presentations
Main Injector Gap clearing kickers Phil Adamson (#) AEM 14th March 2011.
Advertisements

Booster Cogging Robert Zwaska Fermilab (University of Texas at Austin) Accelerator Physics & Technology Seminar Dec. 8, 2005.
PIP and the Booster Notch Bob Zwaska October 12, 2011 PIP Meeting.
Proton Beam Measurements in the Recycler Duncan Scott On Behalf of the Main Injector Group.
Fermilab Booster Diagnostics, Monitors, and Software for Operational Control of Residual Radiation William Pellico Booster Accelerator FNAL HB2008.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
3/7/05A. Semenov Batch-by-Batch Intensity Monitor 1 Two-Channel Batch by Batch Intensity Monitor for Main Injector BBI.
Commissioning of the Fermilab Accelerators for NuMI Operation Robert Zwaska University of Texas at Austin NBI 2003 November 7, 2003.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Booster Beam Notching Overview for 2012 S. Chaurize December 7, 2011.
Antiproton Source Capabilities and Issues Keith Gollwitzer & Valeri Lebedev Accelerator Division Fermilab 1.
Getting Beam to NuMI (It’s a worry!) Peter Kasper.
Booster Cogging Upgrades Craig Drennan, Kiyomi Seiya, Alex Waller.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
Figure 2 gives an overview of the hardware components of the upgraded Main Injector BPM system. The figure shows 2 signal channels which produce one position.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
Advanced Accelerator Design/Development Proton Accelerator Research and Development at RAL Shinji Machida ASTeC/STFC/RAL 24 March 2011.
Proton Improvement Plan William Pellico FRA Visiting Committee Meeting March 14-15, 2011.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Proton Study Meeting 4/19/05 Eric Prebys 1 Proton Plan Stage I Eric Prebys.
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
Booster Low Level Modules, Timing and some Measurements.
F 1 MW Proton Beam for Neutrinos Dave McGinnis AAC Meeting May 10, 2006.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
Synchronization Andrew Hutton Slava Derbenev Yuhong Zhang.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Booster Cogging Bob Zwaska University of Texas at Austin Bill Pellico FNAL.
Paul Derwent 14 Dec 00 1 Stochastic Cooling Paul Derwent 14 Dec 00
Booster Cogging: Synchronization with the Main Injector for NuMI & Slip-Stacking Robert Zwaska University of Texas at Austin Budker Seminar July 27, 2004.
AEM – Special Report Linac Current Stability and Modulation June 25, 2007 Presented by: Doug Moehs Philippians 4:6-7 (Doug) Do not be anxious about anything,
Booster Issues for NuMI Eric Prebys FNAL Beams Division.
Booster Beam Notching Installation Update PIP Talk Salah Chaurize February 20, 2013.
Main Injector Lambertson Aperture Scans David Johnson and Ming-Jen Yang March 17, 2006.
S. Pordes - to part of CD 09/10/031 Introduction to some Beams Division jargon in some order…see how far we get:
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
D. Still-FNAL/Tevatron HALO '03 Tevatron Collider II Halo Removal System Dean Still Fermilab Tevatron Department 5/21/2003 Motives for the Collider Run.
MI primer for NuMI users  Getting beam  TLG modules  Timelines  Beam intensity  NuMI kickers  Extraction bumps and last turn positions  Batch positions.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Booster Losses Keith Gollwitzer PIP and MI 700 kW review January 2015.
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
High Intensity Booster Operations William Pellico PIP II collaboration Nov. 9 th 2015.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
Barrier RF Stacking Weiren Chou and Dave Wildman Fermilab, U.S.A. October 20, 2004 Presentation at the Proton Driver Session ICFA-HB2004, Bensheim, Germany,
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
Beam time structures 1 At any particular instance of time there will be only one kind of beam in the MI. It will be either protons or anti-protons. The.
MI Beam Loss upon Acceleration 5E11/div 11BLMA=LM GeV/c 9.8GeV/c Start of Ramp Fast loss ~10 ms Slow loss.
12/16/03Tev BPM requirements1 Tevatron BPM requirements Mike Martens.
Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013.
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
Proton Improvement Plan Bob Zwaska September 9, 2013 All-Experimenters Meeting.
Limitations to Total Booster Flux Total protons per batch: 4E12 with decent beam loss, 5E12 max. Average rep rate of the machine: –Injection bump magnets.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Slip stacking in Recycler Ioanis Kourbanis 9/14/11.
Update on RF parameters A.Lachaize11 th HPPS design meeting04/09/13.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
MI Shielding Machine Protection Credit D. Capista March 7,2010.
Maximum Credible Beam Loss in the Main Injector D. Capista January 26, 2012.
Pre-Meeting Meeting Brian Drendel Accelerator Shift Plot.
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
JLEIC 200 GeV ion beam formation options
Presentation transcript:

Proton Source Improvement Workshop Cogging W. Pellico Dec 6&7 2010

Booster Gap Three consecutive high intensity pulses (un-notched) will exceed extraction loss limit! – Booster creates a 3 gap notch – The gap is created using two pulsed kickers Notcher – High Voltage Kicker at Long 5 Nocker - Lower Voltage Kicker at Long 12 – Used to clean out Notched Beam – Required for Cogged Cycles – Beam is kicked into collimator region and Long 13 – The gap trigger is created and synched by modules in Booster Low Level room (several modules required) – Synchronization of gap can be done to Pre-Acc notching – Notch for non-cogged cycles occurs at 400 Mev – Cogged notch occurs at ~700 MeV

Gap Creation Scope Trace – Three Bucket Notch Uncogged Cycle – Notch Crated at Injection Cogged Cycle – Notch Created Later

Cogging Motivation Booster needs to fire (5) kickers in a (3 bucket) gap to keep losses down at extraction Booster syncs the gap to a MI marker (‘OAA’) Booster will extract on OAA +/- 1 bucket MI with circulating beam MI = 7*84 Bunches 3319 Meters

Cogging History Around 1998 – the first cogging studies (Webber, Pellico) – 2002: VXI board layout completed based upon early studies – 2005: Added additional automatic Update Trip Plan – 2006: Added BES over-ride – Multibatch MI operations High Intensity Cycles & Rates – Slip Stacking for Pbar Production – Slip Stacking for Numi – MI cycles used for Tevatron loading Cogged but not Notched

Wait for Booster To MI Event ($14 $19..) Was this the first event of load cycle Yes No Make a ‘Trip Plan’ Start Cogging Process End of cycle: Get ready for next Cogged CycleTrip Plan Cycle Start Tracking of Booster ‘Gap’ Create Gap Wait for ‘OAA’Track gap through cycle Calculate End of Cycle Gap Error Store gap position vs turn as reference Create GapSend MI a reset pulse to sync BES Calculate Gap Error Pre T cogging Extract on BES - GAP Post Transition Cogging Extract on ‘OAA’

Early Days

Current Typical Timeline $14 $19 $19 $19 $19 $14 $19 $19 $19 $19 $1D $1D $1D First Cycle For Trip Plan

Typical Plots Showing Cogging Rpos Variations for several MI Cycles Typically - Horizontal position will vary +/- 6mm (Depends upon gain setting ) There are two types of correction: Fixed and Proportional

July 27, 2004 Robert Zwaska Booster Cogging 10 Gap Position tracking Relative to Trip Plan Gap ~ 3 turns Slippage of Gap vs ‘Trip Plan’ Slippage in a cycle varies by > 200 buckets – About 3 circumferences Notch is essentially at a random position w.r.t the beam circulating in the Main Injector

Example of Booster system improvement to help cogging

Conclusion/Issues Dynamic Aperture – Beam Emittances – Beam Losses Higher losses on Cogged Cycles – Notch at Higher Energy – Gap not as clean – Orbit Control/Scraping Lots of hardware to maintain Jitter – Extraction and Gap Kickers Ready for Upgrade It works – much better then I would ever have hopped….