GLAST LAT ProjectSAS PDR, Aug. 17, 2001 R.Dubois1 Schedule Balloon Science Tools, Analysis Platforms Calibrations Performance Tuning, Tracking Data Production.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.
Advertisements

GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.31 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Offline SoftwareWorkshop - SLAC, Jan , 2001 R.Dubois The Plan The Year in Review The Big Picture Short Term Plan & Balloon Manpower issues.
GLAST LAT ProjectISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.1 Requirements 1 Gamma-ray Large Area Space Telescope GLAST Large.
GLAST LAT Project 1 Tracker “mini-tower” Full Size Calorimeter module Face to Face IDT meeting March 20, 2002 Convener: E. do Couto e Silva Engineering.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
Simulation / Reconstruction Working group Toby Burnett University of Washington Jan 2000 T.
GLAST June 8, 2000, P. Roger Williamson, BFP - 1 Balloon Flight Planning Roger Williamson June 8, 2000.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
Section 15-1GLAST Ground System Design Review August 18&19, 2004 ISOC Organization ISOC Manager R Cameron Commanding, H&S Timeline Planning Command Generation.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 4.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Section Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review 7.2.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 7.1 Pre-launch Operation and Calibration 1 Gamma-ray Large Area Space.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 21 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project LAT Monthly Apr SAS 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope WBS 4.1.D SAS LAT Monthly Managerfest.
GLAST LAT Project 1S. Ritz Purposes of the Data Challenges “End-to-end” testing of analysis software. –define the ends –define the tests (what is success?)
GLAST LAT Project Analysis Meeting April 22, 2004 E. do Couto e Silva 1/5 SVAC Status SVAC Status Eduardo do Couto e Silva April 22, 2004.
GLAST LAT Project ISOC Subsystem1 Response to Peer Review RFA 6  Request: –Need to provide more information on the planned and actual staffing profiles.
Trigger and online software Simon George & Reiner Hauser T/DAQ Phase 1 IDR.
R.Dubois Sim/Recon Overview 1/10 GLAST LAT ProjectSoftware Workshop July, SLAC Sim/Recon Overview Elements of Simulation/Reconstruction Development,
Fermi Large Area Telescope (LAT) Integration and Test (I&T) Data Experience and Lessons Learned LSST Camera Workshop Brookhaven, March 2012 Tony Johnson.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 K.Young 1 LAT Data Processing Facility Automatically process Level 0 data.
Root, GLAST, and IDL Heather Kelly NASA/GSFC Emergent Corporation.
GLAST LAT ProjectI&T PDR Presentation – Jan. 9, 2002 R. Claus1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer.
LAT Reconstruction (and simulation) Toby Burnett University of Washington.
GLAST CHEP 03 March R.Dubois1/17 GLAST Large Area Telescope: Overview of GLAST Offline Software Richard Dubois Stanford Linear Accelerator Center.
David N. Brown Lawrence Berkeley National Lab Representing the BaBar Collaboration The BaBar Mini  BaBar  BaBar’s Data Formats  Design of the Mini 
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
5 May 98 1 Jürgen Knobloch Computing Planning for ATLAS ATLAS Software Week 5 May 1998 Jürgen Knobloch Slides also on:
19 November 98 1 Jürgen Knobloch ATLAS Computing ATLAS Computing - issues for 1999 Jürgen Knobloch Slides also on:
GLAST LAT ProjectTracking Software Week – Pisa – 20 May 2002 R.Dubois1 SAS Overview Overall Data Flow Sim/Recon –Gleam –Recon rewrites –Calibrations Level.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
T. Burnett1 GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 9, 2002 SAS Software: Sources Detector geometry model Simulation Event.
1 Japan-US collaboration to develop the “End-to-End simulator” Tsunefumi Mizuno Mar 12, 2003.
Heather Kelly PPA Scientific Computing Apps LAT was launched as part of the Fermi Gamma-ray Space Telescope on June 11 th 2008.
1 Stepping in everyone’s toes ( but for a good cause….) Eduardo do Couto e Silva Software Meeting – January 2001.
Feb. 7, 2007First GLAST symposium1 Measuring the PSF and the energy resolution with the GLAST-LAT Calibration Unit Ph. Bruel on behalf of the beam test.
The CMS Simulation Software Julia Yarba, Fermilab on behalf of CMS Collaboration 22 m long, 15 m in diameter Over a million geometrical volumes Many complex.
Gamma Ray Large Area Space Telescope Balloon Flight: Data Handling Overview E. do Couto e Silva, R. Dubois, D. Flath, I. Gable,T. Kamae, A. Kavelaars,
GLAST LAT Offline SoftwareCore review, Jan. 17, 2001 Review of the “Core” software: Introduction Environment: THB, Thomas, Ian, Heather Geometry: Joanne.
GLAST LAT Project 1S. Ritz Data Challenge Planning Overview Purpose Boundary conditions Plan: –scope and progression of data challenges –schedule summary.
GLAST LAT ProjectI&T&C Pre PDR Presentation – Oct 2, 2001 B. Grist1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
1 Getting Involved with GLAST Workshop, CFA, 06/21/ C. Shrader, NASA/GSFC GLAST Data & Software Release plans + Science Support Center Services C.
GLAST Large Area Telescope – ISOC Overview and StatusDOE Annual Review, 13 June GLAST Large Area Telescope Instrument Science Operations Center.
The MEG Offline Project General Architecture Offline Organization Responsibilities Milestones PSI 2/7/2004Corrado Gatto INFN.
1 Study of Data from the GLAST Balloon Prototype Based on a Geant4 Simulator Tsunefumi Mizuno February 22, Geant4 Work Shop The GLAST Satellite.
BES III Software: Beta Release Plan Weidong Li 19 th October 2005.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
I&T&C Organization Chart
GLAST Large Area Telescope:
Existing Perl/Oracle Pipeline
GLAST Large Area Telescope:
GLAST Large Area Telescope Instrument Science Operations Center
Science Analysis Software
GLAST Large Area Telescope
LAT Software Quality Assurance
SAS Overview The Big Picture
Simulation and Physics
THE STANDARD ENVIRONMENT FOR THE ANALYSIS OF LAT DATA
Integration and Test Organization Chart
LAT Instrument Operations Center
Status Report and highlights from workshop II
GLAST Large Area Telescope
Integration & Test Instrument Operations Coordination
GLAST Large Area Telescope Instrument Science Operations Center
BES III Software: Short-term Plan ( )
Presentation transcript:

GLAST LAT ProjectSAS PDR, Aug. 17, 2001 R.Dubois1 Schedule Balloon Science Tools, Analysis Platforms Calibrations Performance Tuning, Tracking Data Production Facility ………. near real-time monitoring Polishing & maintenance + post-launch panic CY Event DB Technology & Design Release Manage MDC GlastSim/G4 Event Display Balloon Science Tools, Analysis Platforms Calibrations Performance Tuning, Tracking Data Production Facility ………. near real-time monitoring Polishing & maintenance + post-launch panic Polishing & maintenance + post-launch panic CY Event DB Technology & Design Release Manage MDC GlastSim/G4 Event Display

GLAST LAT ProjectSAS PDR, Aug. 17, 2001 R.Dubois2 Manpower Assumptions Sources, Simulation & Recon 1 FTE GEANT4 during the development phase and 1/2 FTE ongoing (Italy) 1/2 FTE sources (Japan) 2 FTE CAL - simulation and reconstruction (NRL, France) 2 FTE TKR - simulation and reconstruction (SLAC + Italy) ½ FTE for ACD - simulation and reconstruction (GSFC) 1 FTE combined for Trigger, Background Rejection studies (there may be odd scientists contributing as well) Analysis Tools & Infrastructure 2 FTE for tools development (GSFC) 1 FTE package & user support (SLAC) 1 FTE code release & verification (SLAC) 1 FTE event display – 6 mo (Italy) Engineering Models (BTEM, BFEM, 4 Module test 2003? …) 1 FTE extra for duration of each test

GLAST LAT ProjectSAS PDR, Aug. 17, 2001 R.Dubois3 More Manpower Assumptions Science Software 3 FTEs to support 7 scientist programmers (estimated 40 MY work). Starting in mid FY ’02. Data Processing Facility 1 FTE automated server (~1 year) – main activity in FY02, followed by a burst a year before launch 1 FTE instrument diagnostics – build up 1.5 yr before launch 1/2 FTE support of DPF pre-launch Calibration (starts 3/2002) 1 FTE for machinery for calibrations 2.5 FTE for subsystem algorithm development (perhaps more – from NRL, France & Italy) Management 1 FTE code architect 1 FTE manager

GLAST LAT ProjectSAS PDR, Aug. 17, 2001 R.Dubois4 Projected Manpower

GLAST LAT ProjectSAS PDR, Aug. 17, 2001 R.Dubois5 Milestones MilestoneDate Science Analysis Software (SAS) Requirements Review 04/20/01 Start PDR Instrument Performance/Backgrounds Evaluation 05/01/01 SAS PDR08/17/01 LAT Instrument PDR10/29/01 Release Management & Verification in place12/01/01 First Prototype of Data Processing Facility2/1/02 Simulation/Reconstruction 1st iteration complete 5/1/02 SAS CDR9/4/02 Photon Database technology in place12/1/02 LAT Instrument CDR12/1/02 Demonstrate First Science Tools using Database3/1/03 First calibration algorithms in place6/1/03 Databases shared with SSC10/1/03 Production version of Data Processing Facility6/1/04 All required Science Tools in place2/1/05 End to End pre-launch test completed12/1/05

GLAST LAT ProjectSAS PDR, Aug. 17, 2001 R.Dubois6 Open Issues Event/photon database –Want to cater to most typical queries and give good response time –Query by (direction,time) – scanning mode not amenable to storage in files: tesselate sky, ? –Shared database can allow mirror sites to import data convert to other formats as they see fit –Trade study in 2002 Event Analysis Platforms –Currently supporting 2: Root & IDL Root is free HEP package targeted at event type data. Includes I/O as well as analysis (gui, histogramming, fitting, etc) features. Apparently the next big package in HEP IDL is the astronomical standard. Commercial and expensive. Well suited to image data. Astronomers would die before giving it up ;-) Downside is effort in maintaining 2 systems; some divisiveness. Probably have no choice but to maintain two.

GLAST LAT ProjectSAS PDR, Aug. 17, 2001 R.Dubois7 Open Issues (cont’d) User Support –Do not have sufficient manpower at present to maintain documentation & answer user queries –Can be a serious drain on developers, especially during phases of active change –When things settle down a bit, we should prepare a “User Workbook”, examples of which created by SLD and BABAR. Step by step tutorials to walk users through the basics

GLAST LAT ProjectSAS PDR, Aug. 17, 2001 R.Dubois8 Science Tools Issues Instrument Response Functions –Potentially functions of many variables: A eff, energy resolution, and point-spread function (PSF) could be described as functions of energy, azimuth, inclination, plane of conversion in the TKR or layer of conversion in the CAL, tower of conversion, etc –Different cuts will require different IRFs! –How much MC is required to (help) determine IRFs Likelihood Options –Sparse data with low resolution implies model fitting and max likelihood Binned or unbinned?? Unbinned will be computationally intensive

GLAST LAT ProjectSAS PDR, Aug. 17, 2001 R.Dubois9 Science Tools Issues (cont’d) High Level Analysis Environment –Will need a shell &/or GUI to work within Root, CIAO, ?? –How to develop a uniform interface between the tools and the database All the tools should look as similar as possible to the user –Will need to optimize results speed & data volume between computations on servers and delivery of data to user’s machines

GLAST LAT ProjectSAS PDR, Aug. 17, 2001 R.Dubois10 Manpower Current SLAC levels Basic problem will be 5 FTEs difference dun the collaboration for more manpower delay science analysis tools descope DPF for a while

GLAST LAT ProjectSAS PDR, Aug. 17, 2001 R.Dubois11 Backup Slides on WBS

GLAST LAT ProjectSAS PDR, Aug. 17, 2001 R.Dubois12 WBS, Schedule & Manpower – 4.1.D 4.1.D.1 SOURCES, SIMULATION & EVENT RECONSTRUCTION 4.1.D.1.1 SOURCES 4.1.D.1.2 PROTOTYPE INITIAL FRAMEWORK 4.1.D.1.3 GISMO SIMULATION 4.1.D EXISTING SIMULATION UPGRADE 4.1.D NEW GEOMETRY & HITS SCHEMES 4.1.D ONGOING SUPPORT 4.1.D.1.4 GEANT4 SIMULATION 4.1.D EXTERNAL PACKAGE REQUIREMENTS 4.1.D DETMODEL GEOMETRY CONVERTER 4.1.D GEANT4 PROTOTYPE 4.1.D GEANT 4 VALIDATION 4.1.D ONGOING SUPPORT 4.1.D.1.5 ACD SIMULATION 4.1.D EXISTING DIGITIZATION UPDATE 4.1.D UPGRADE FOR NEW HITS SCHEME 4.1.D ONGOING SUPPORT 4.1.D.1.6 CAL GEOMETRY, SIMULATION, & RECONSTRUCTION 4.1.D GEOMETRY 4.1.D SIMULATION 4.1.D INITIAL VERSION OF SIMULATION 4.1.D SIMULATION IMPROVEMENTS 4.1.D RECONSTRUCTION 4.1.D INITIAL VERSION OF RECONSTRUCTION 4.1.D RECONSTRUCTION IMPROVEMENTS: SHOWER LEAKAGE CAL 4.1.D ITERATIVE RECONSTRUCTION W/ TRACKER 4.1.D FAILURE MODES / PERFORMANCE STATE 4.1.D.1.7 TRACKER GEOMETRY, SIMULATION & RECONSTRUCTION 4.1.D SIMULATION IMPROVEMENTS 4.1.D DIGITIZATION IMPROVEMENTS 4.1.D INITIAL TRACKER RECONSTRUCTION 4.1.D TRACKER RECONSTRUCTION REDESIGN: PATREC & FIT 4.1.D.1.8 TRIGGER SIMULATION 4.1.D.1.9 BACKGROUND REJECTION 4.1.D.1.A MAJOR RELEASES OF SIM & RECONSTRUCTION

GLAST LAT ProjectSAS PDR, Aug. 17, 2001 R.Dubois13 WBS continued 4.1.D.3 ENGINEERING MODELS 4.1.D.3.1 TEST BEAM 99 SUPPORT 4.1.D.3.2 BALLOON FLIGHT SUPPORT 4.1.D MODULE TEST SUPPORT 4.1.D.4 SCIENCE SOFTWARE 4.1.D.4.1 UTILITIES 4.1.D.4.2 ANALYSIS SOFTWARE 4.1.D.4.3 ANALYSIS DATABASES 4.1.D.5 DATA PROCESSING FACILITY 4.1.D.5.1 PROTOTYPE DATA MANAGER 4.1.D.5.2 AUTOMATED SERVER 4.1.D.5.3 INSTRUMENT DIAGNOSTICS 4.1.D.6 CALIBRATION 4.1.D.6.1 TOOLS FOR ACCESSING CONSTANTS 4.1.D.6.2 ACD CALIBRATION 4.1.D.6.3 CALORIMETER CALIBRATION 4.1.D.6.4 TRACKER CALIBRATION 4.1.D.6.5 HIGH LEVEL CALIBRATIONS 4.1.D.7 MANAGEMENT 4.1.D.7.1 SCIENCE ANALYSIS SOFTWARE MANAGEMENT 4.1.D.7.2 SCIENCE ANALYSIS SOFTWARE REQUIREMENTS 4.1.D LEVEL 3 REQUIREMENTS 4.1.D LEVEL 4 REQUIREMENTS 4.1.D PDR SUPPORT 4.1.D MOCK DATA CHALLENGE 1

GLAST LAT ProjectSAS PDR, Aug. 17, 2001 R.Dubois14 Requirements - WBS Matrix - I Requirement #DescriptionWBS #Description 5.1 prompt processing4.1.D.5Data Processing Facility near-real time monitoring4.1.D.5Data Processing Facility monitoring & updating calibs 4.1.D.5Data Processing Facility 4.1.D.6Calibrations maintain state & performance tracking 4.1.D.5Data Processing Facility high level science products4.1.D.4Science Tools reprocessing data4.1.D.5Data Processing Facility

GLAST LAT ProjectSAS PDR, Aug. 17, 2001 R.Dubois15 Requirements - WBS Matrix - II access to events 4.1.D.5Data Processing Facility 4.1.D.2Analysis Tools perform bulk MC simulations4.1.D.5Data Processing Facility interface with mirror sites 4.1.D.5Data Processing Facility 4.1.D.2Analysis Tools interface with SSC 4.1.D.5Data Processing Facility 4.1.D.2Analysis Tools support engineering models4.1.D.3Eng Model support 5.1

GLAST LAT ProjectSAS PDR, Aug. 17, 2001 R.Dubois16 Requirements - WBS Matrix - III 5.2Code Development4.1.D.2Analysis Tools 5.3 Instrument Response Simulations 4.1.D.1 Sources, Simulation and Event Reconstruction 5.4Event Reconstruction4.1.D.1 Sources, Simulation and Event Reconstruction 5.5Environment Logging4.1.D.5Data Processing Facility 5.6Calibrations 4.1.D.6Calibrations 4.1.D.5Data Processing Facility 5.7Level 1 Processing4.1.D.5Data Processing Facility

GLAST LAT ProjectSAS PDR, Aug. 17, 2001 R.Dubois17 Requirements - WBS Matrix - IV 5.8 Creation of High-Level Science Tools 4.1.D.4Science Software 5.9Analysis Platform4.1.D.2Analysis Tools 5.10Longevity 4.1.D.5Data Processing Facility 4.1.D.2Analysis Tools 6.1Data Formats4.1.D.5Data Processing Facility 6.2LAT Data & Alg Export 4.1.D.5Data Processing Facility 4.1.D.2Analysis Tools 6.3SSC interface4.1.D.5Data Processing Facility